Senior Planning Engineer
CSCEC (China State Construction & Engineering Corporate)
Total years of experience :13 years, 0 Months
Project:
Central Business District CBD at New Administrative Capital
Project: ERC Refinery Project at Mostorod
o Studying the drawings, contract and specs
o Working on projects baseline schedules
o Preparing the resource histogram for key resources
o Performing resource management
o Develop work method of statement or procedure as required.
o Making schedule narrative
o preparing the markup drawings which will be the basis of work progress monitoring.
Projects:
1- Burullus Combined Cycle Power Plant (Siemens-Orascom Consortium)
2- West Damietta Combined Cycle Power Plant
Power Generation Egypt Business Unit (PGEBU)
Projects:
1- Burullus Combined Cycle Power Plant 4800 MW (Siemens-Orascom Consortium)
2- West Damietta Simple Cycle Power Plant 500 MW
o Studying the drawings to determine the material which the project need and start its procurement procedures
o Reviewing shop drawings with the project specs. and their coordination with the MEP works.
o Surveying quantities of the civil and architectural items in the projects.
o Making price comparison for the nominated suppliers and subcontractors.
o Preparing B.O.Qs for the nominated contracts.
o Reviewing subcontractors submittals
o Making material submission to the consultant for approval and fulfill the comments.
o Making P.Os and P.Rs for materials
o Follow up the supply of the material to site and its installation.
o Reviewing contracts prepared for the subcontractors.
o Making invoices for the sub-contractors.
o Making contracts addendum when needed
Project: Mall of Egypt (Besix-Orascom Joint Venture)
o Safety inspection in site, monitoring the processes and making preventive and corrective actions.
o Reporting to the responsible construction managers with their Safety violations weekly.
o Training for new hired employees.
o Proceeding in the HSE procedures and its documentation system.
Project: Mall of Egypt (Besix-Orascom Joint Venture)
o Shared the responsibility for Ski, Cinemas and Family Entertainment Center zones.
o Inspection of R.C foundations, columns, beams, slabs, walls, stairs, slab on grade f.w and rft..
o Inspection of strengthening of the elements having new overloads.
o Delivery of the inspected works to consultant.
o Making regular quality checks in site as part of the quality assurance.
o Implementing quality assurance procedures and documentations.
Project: Mall of Egypt (Besix-Orascom Joint Venture)
o Managing 2 zones of 12 in the mall including inspection and delivery to QC and Consultant.
o Working on the finishing works (block works, Plastering and Doors Frames).
o Making KPIs for daily production and achievement of deadlines.
o Revising the drawings before execution.
o Coordinating between the finishing works and MEP works.
o Coordination of equipments, tower cranes and other lifting equipments.
o Supervising and making payments for subcontractor.
o Inspections of columns, R.C footings, strip footing and retaining wall (reinforcement and formwork).
Project: Makkah Metro Phase one Construction Works CW-1 & CW-2
(Orascom Yabi Markazi Joint Venture)
** We won the first place in the technical evaluation of the bids by the owner **
o Studying the client tender documents and drawings
o Studying the project’s schedule which is done using the time-chainage principal.
o Working on the project organizational charts and the project staff schedule.
o Working on the project time schedule using PRIMAVERA and the Schedule Narrative.
o Calculating storage areas required for the project “Precast Yard” TBM and Viaduct elements.
o Working on the construction methodologies for the underground metro stations, elevated stations and the viaduct spans.
o Working on the project methods statement, Tender Strategy, Resource Leveling and Manpower Histogram, Knowledge Transfer Plan and Interface Management Plan.
Project: New Ministry of Interior Headquarter
o Making structural shop drawings for (Foundations, Columns, Beams, non regular Flat Slabs, non
regular Ripped Slabs and Stairs).
o Checking the design for errors before making the shop drawings.
o Making the BBS (Bar Bending Schedule) for each submitted shop drawing.
o Coordination between structural, MEP and Arch elements before issuing the shop drawings.
I’ve participated in the company ISO renewal two years in row 2013 and 2014 as an “Assistant Quality Manager”.
Quality Assurance and Quality Control of company's design and construction supervision projects
o Promoting quality achievements and performance improvement through the organization.
o Ensure that the QMS ISO-9001 target and goal is achieved
o Ensure compliance with ISO-9001
o Ensuring that Quality Procedures are properly understood, carried out and implemented.
o Monitoring performance by scheduling and performing audits activities, including pre auditing plan, audit execution and evaluation and post audit follow up and audit reports.
o Ensure that the implementation of corrective actions plans are done to improve the overall ISO-9001 compliance and quality results.
o Present to managers reports including the organizational performance implementing the QMS.
o Ensure applicability of current quality policies, procedures and objectives by keeping informed of the latest updates/ modifications related to ISO-9001.
o Study, develop, continuously improve and maintain the performance and effectiveness of the company Quality Management System.
o Making analysis for all the company’s disciplines for their performance applying the QMS.
o Making KPIs analysis for the company, and present it to the B.O.D.
o Analysis and design of the different structural elements in the high rise
buildings.
o Making the Checks on wind and earthquakes’ effects.
making archetctural designs
making structural designs
Concrete works
Tendering
Concrete works
Finishing works
Tendering
o Master's research thesis in the Construction Material Sustainability field. o The following courses were attained through Pre-Masters: Construction Quality Management Bid Study Computational Methods Contracts, Claims And Disputes Productivity Java Programming Language Linear Programming Projects Evaluation Financial Management Planning Techniques Time Value of Money
- Bachelor's degree of engineering May 2011 / Civil engineering department / Zagazig University. Graduation project: construction project management Overall grade: good Final year grade: very good Graduation project grade: Excellent Technical & Educational courses -course in the engineering drawing program: Auto CAD -course in the structural engineering program: SAP -course in the construction management program: primavera -course in architectural design. -course in the surveying using (Total station). - Any courses have relation