ABDELAZEEZ SAYED ABDELAZEEZ MOHAMMED EL DEEK, Construction Project Manager

ABDELAZEEZ SAYED ABDELAZEEZ MOHAMMED EL DEEK

Construction Project Manager

Al Raeel Engineering Construction & Development Co. (ARCCO)

Location
Saudi Arabia
Education
Bachelor's degree, B.Sc. in Civil Engineering
Experience
21 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 11 Months

Construction Project Manager at Al Raeel Engineering Construction & Development Co. (ARCCO)
  • Saudi Arabia - Yanbu
  • My current job since November 2022

Projects:
• Start-Up Transportation Hub on a 22, 389 sq.m plot area in the Logistic Zone at the Red Sea, KSA (SAR 68, 766, 913), 7 Months, with Red Sea Global as an Employer & Atkins as a Consultant.
Responsibilities:
• Overseeing and directing construction projects from conception to completion
• Delivered the project from pre-contract to construction and handover stages
• Defined project goals, objectives, and plans, including delineation of scope, scheduling, setting performance requirements, project logistics, construction methodology, and assigning field-specialists
• Overseeing all onsite and offsite constructions to monitor compliance with building and safety regulations
• Negotiated the terms of contracts/agreements, drafted contracts, and obtained permits/licenses from appropriate authorities
• Collaborated with engineers, architects, etc. to determine the specifications of the project
• Conducted quality/ safety standards to ensure adherence to quality and safety norms and report issues during the entire course of project execution
• Provided overall project and team leadership
• Coordinated and directed construction workers and subcontractors
• Reviewed the work progress on a daily basis
• Drafted monthly status reports including cost, schedule, safety, and cash flow for internal and/or external use.
• Evaluating, managing, and mitigating risks
• Ensuring quality construction standards and using proper construction techniques to achieve success
• Determined needed resources (manpower, equipment, and materials) from start to finish with attention to budgetary limitations
• Monitoring and directing the assigned project resources
• Overseeing project proposal documents, infrastructure specifications, project documents/submittals, and drawings in compliance with the organizational guidelines and project requirements
• Utilizing defined project processes to manage quality, changes, risks, issues, financial implications, and escalated issues impacting project performance and timetable
• Resolved problems, disputes, and scheduled work, also participating in progress and coordination meetings
• Managed RFIs, submittals, and change orders
• Managed project close-out procedures and ensure that process is completed

Resident Engineer at Eng. Mohd. Al Shaikh Mubarak Architectural & Eng. Consultants
  • United Arab Emirates - Dubai
  • November 2017 to May 2022

Projects:
• Residential commercial building consists of 2B+G+6+R built on a 6, 389 sq.m plot area at Al Muteena, Dubai (AED 100, 000, 000), 30 Months, Al Ashram Contracting, Al Ghurair Properties.
• Residential commercial building consists of 2B+G+6+R built on a 5, 882 sq.m plot area at Al Muteena, Dubai (AED 94, 000, 000), 30 Months, Al Ashram Contracting, Al Ghurair Properties.
• Residential commercial building consists of G+P+13+R built on a 6, 600 sq.m plot area at Al Quosais, Dubai (AED 120, 500, 000), 30 Months, Bust Contracting, Al Ghurair Properties.

Primary Duties & Responsibilities:
• Ensure that the construction contracts and deliverables meet the company’s objectives in terms of time, cost, and quality.
• Manage the development of the project execution plan and the project schedule, conducting weekly construction meetings with the Stakeholders to monitor the work progress and ensure that the project is on track.
• Project planning and responsible for overall execution of activities required.
• Following an appropriate project management methodology.
• Ensuring the project conforms to authorities’ requirements and conditions.
• Leading the project team to meet the project’s objectives and oversee tasks and progress.
• Leading diverse project teams, both face to face and remotely.
• Remove impediments to the Team’s progress.
• Practice and facilitate effective communication among team members and stakeholders.
• Accountable for managing risks, dependencies, and escalating issues where appropriate.
• Communicate with the involved parties to move the projects towards their defined goals.
• Manage all contractual quality standards.
• Ensure the project close-out process is completed.

Project Manager at Emirates Coast Contracting ( Al Shafar Investment Group )
  • United Arab Emirates - Dubai
  • April 2017 to September 2017

• Residential building consists of B+G+6+R+UR in Reffaah, Dubai (AED 42, 596, 417), 19 Months, Al Turath Engineering Consultants, Al Ghurair Properties.

Projects Manager at Sharjah Government – Directorate of Public Works ‎
  • United Arab Emirates - Sharjah
  • February 2015 to January 2017

‎1-‎ Dibba Al Hesn Nursery - ( 8, 311, 363 Dhs. ) - 8 Months - First Art Engineering Consultancy - ‎Dar Alwd Construction Company.‎
‎2-‎ Dibba Al Hesn Beach - ( 11, 155, 828 Dhs. ) - 4 Months - Halcrow International Partnership ‎‎(CH2M HILL Halcrow) - Darwish Engineering Emirates.‎
‎3-‎ Al Jazeerah Sewage Lifting Station in Dibba Al Hesn - ( 7, 280, 330 Dhs. ) - 6 Months - ‎Halcrow International Partnership (CH2M HILL Halcrow) - Al Marfaa Road Contracting Co.‎
‎4-‎ Olympic Sports Complex in Al Batayeh Sports Club - ( 39, 500, 000 Dhs. ) - 11 Months - Al ‎Rukn Al Meamary Engineering Consultants - Fast Building Contracting Company.‎
‎5-‎ Olympic Sports Complex in Al Madam Sports Club - ( 39, 900, 000 Dhs. ) - 11 Months - Al ‎Rukn Al Meamary Engineering Consultants - Fast Building Contracting Company.‎

Project Manager at Emaret Al Sharq Engineering Consultancy ‎
  • United Arab Emirates - Dubai
  • September 2014 to February 2015

‎1-‎ Residential and commercial building consists of B+G+15 T+H.C+R in Dubai Sports City- ( ‎‎53, 785, 000 Dhs. ) - 8 Months - Emaret Al Sharq Engineering Consultancy - Ali Bin Salim ‎Contracting Company.‎

Projects Manager at Arabian Group Engineering Consultations
  • United Arab Emirates - Ras Al Khaimah
  • August 2008 to September 2014

Responsibilities:
• Acting in the capacity of The Engineer's Representative in front of Clients, Contractors, and Authorities.
• Implement all the company policies, and procedures inclusive of health and safety plans and site supervision manual to ensure the health, safety, and welfare of self and others.
• Administer the Construction Contract.
• Issue Contractual letters and maintain contemporary records.
• Issue recommendations on variations and claims. Review and certified the Contractor’s payments.
• Lead the progress/technical/commercial meetings.
• Leading diverse project teams, both face to face and remotely.
• Provide technical expertise & advice regarding to project scopes and quality.
• Prepare project reviews and report on performance.
• Ensure that the project documentation is correctly maintained.
• Deal with clients, contractors, suppliers, and subcontractors. Collaborate and coordinate with Client 3rd parties.
• Manage project close-out procedures and ensure that process is completed.

Quality Manager at Ras Al Khaimah ReadyMix
  • United Arab Emirates - Ras Al Khaimah
  • October 2010 to December 2011

Responsibilities:
• Oversee the complete production process including concrete mix design, conducting of tests within a laboratory environment, provided accreditation
• Ensured compliance of every process by consistently examining and testing raw materials, collecting samples, preparing daily operations reports on concrete pouring as well as preparing monthly reports and statistics on production and quality leading to improved performance and increased production
• Communicating with Clients on a regular basis to understanding their needs, and requirements to achieve the Client’s satisfaction.
• Delegated and distributed tasks to laboratory team and check-up the performance.

Projects Manager at ENJAZ Construction
  • United Arab Emirates - Ras Al Khaimah
  • December 2004 to October 2010

Responsibilities:
• Overseeing and directing construction projects from conception to completion.
• Delivering the project from pre-contract to construction and handover stages.
• Defining project goals, objectives, and plans, including delineation of scope, scheduling, setting performance requirements, project logistics, construction methodology, and assigning field-specialists.
• Overseeing all onsite and offsite constructions to monitor compliance with building and safety regulations.
• Negotiating the terms of contracts/agreements, drafting contracts, and obtaining permits/licenses from appropriate authorities.
• Collaborate with engineers, architects, etc. to determine the specifications of the project.
• Conducting quality/ safety standards to ensure adherence to quality and safety norms and report issues during the entire course of project execution.
• Provide overall project and team leadership.
• Coordinating and directing construction workers and subcontractors.
• Reviewing the work progress on daily basis.
• Prepare monthly status reports including cost, schedule, safety, and cash flow for internal and/or external use.
• Evaluating, managing, and mitigating risks.
• Ensuring quality construction standards and using proper construction techniques.
• Determine needed resources (manpower, equipment, and materials) from start to finish with attention to budgetary limitations.
• Monitoring and directing the assigned project resources.
• Overseeing project proposal documents, infrastructure specifications, project documents/submittals, and drawings in compliance with the organizational guidelines and project requirements.
• Utilizing defined project processes to manage quality, changes, risks, issues, financial implications, and escalated issues impacting project performance and timetable.
• Resolving problems, disputes, and scheduling of work, also participating in progress and coordination meetings
• Manage RFIs, submittals, and change orders.
• Manage project close-out procedures and ensure that process is completed.

Project Engineer at MARCO Engineering&Contracting
  • Egypt - Cairo
  • June 2003 to December 2004

1- Execution of finishing works of the public transport authority hospital in Abdel Khalek
Tharwet st.
2- Execution of structural & finishing works of two villas consist of basement, ground floor, two
typical floors and roof rooms in New Cairo close to El Shewifat international school .
3- Execution of structural & finishing works of residential building consist of basement, ground
floor, five typical floors and roof rooms in New Cairo City close to El Shewifat international
school.
4- Execution of structural works of private villa consist of basement, ground floor, two typical
floors and roof rooms in the first zone, north of El Shewifat in New Cairo City.
5- Check all structural drawings for all above projects.
6- Finish quantities estimation (B.O.Q) for all above projects.
7- Prepare bill of payments for suppliers and subcontractors

Structural Design Engineer at Saquer Quoraish Consultant Engineering
  • Egypt - Cairo
  • June 2002 to December 2002

1-Design of residential building consists of B+G+3 in New Cairo.
2-Design of residential building consists of G+3 in El Nozha El Gedida.
3-Design of residential building consists of B+G+11 in Nasr City.
4- Check of structure for several projects.
5- Checking structural drawings.

Training at SPACE Company – Dr. Medhat Dora
  • Egypt - Cairo
  • February 2002 to May 2002

Training in structural design of buildings and constructions

Training at Talaat Mustafa Group
  • Egypt - Cairo
  • May 2001 to September 2001

Training in Rehab City for execution of all concrete constructions works in Rehab City Club.

Training at Talaat Mostafa Group
  • Egypt - Cairo
  • May 2000 to August 2000

Training in Rehab City for execution of all concrete constructions works in buildings’ area, villas’
area and mall area.

Education

Bachelor's degree, B.Sc. in Civil Engineering
  • at Higher Technological Institute in Tenth of Ramadan City
  • May 2002

Grade Point Average : 2.55 Percentage : 70.50% Grade of B.Sc. Project: First Project : Design of Reinforced Concrete Grade: Excellent Second Project: Testing & Properties of Material Grade: Excellent

Specialties & Skills

Commercial Buildings
Residential Buildings
AutoCAD
Project Management
Civil Engineering
Reinforced Concrete
Ready Mix Concrete
Project Management
Contractor/Consultant/Client
AutoCAD
Microsoft Word/Excel
Organization Skills
High Level of Accuracy
Reports Writing
Team Leadership
Negotiation

Languages

Arabic
Native Speaker
English
Expert

Memberships

Society of Engineers U.A.E. .
  • Member
  • May 2005
Egyptians Engineers Syndicate .
  • Member
  • May 2002
Ras Al Khaimah Municipality
  • Authorized from Ras Al Khaimah Municipality to execute unlimited ( high rise ) buildings
  • June 2014
Federation of Arab Engineers .
  • Member
  • March 2012

Training and Certifications

AIGPE™ Certified Six Sigma Green Belt (Certificate)
Date Attended:
August 2022
Google project management (Certificate)
Date Attended:
July 2022
Project Management Professional (PMP).‎ Covering the 10 PM knowledge areas and professional ‎respons (Training)
Training Institute:
The Egyptian Lobby
Date Attended:
November 2017
Duration:
35 hours
Project Management Professional (PMP).‎ Covering the 10 PM knowledge areas and professional ‎respons (Training)
Training Institute:
Clarity Consultants Institute - UAE.‎
Date Attended:
February 2016
Duration:
40 hours
Project Management Scheduling using Primavera ‎ (Training)
Training Institute:
Society of Engineers - UAE
Date Attended:
July 2008
Duration:
12 hours
electrical works (Training)
Training Institute:
Ministry of Housing, Utilities and Urban Communities‎
Date Attended:
July 2002
Duration:
100 hours
IELTS (International English Language Testing System) ‎Preparing Exam ‎ (Training)
Training Institute:
British Council ‎
Date Attended:
October 2016
Duration:
24 hours
The New FIDIC Red Book 99 ‎ (Training)
Training Institute:
Society of Engineers - UAE
Date Attended:
January 2015
Duration:
12 hours
Microsoft Certified Professional (MCP)‎ (Training)
Training Institute:
Scholarship from Ministry of Communication and ‎Information Technology by Orascom Technology Co. ‎wi
Date Attended:
September 2002
Duration:
500 hours
Value Engineering in Construction Projects ‎ (Training)
Training Institute:
Society of Engineers - UAE
Date Attended:
August 2015
Duration:
12 hours

Hobbies

  • Walking
  • Swimming
  • Traveling
  • Reading