Resident Engineer/Planning Engineer
Mott MacDonald Pakistan
Total years of experience :22 years, 4 Months
Islamabad
Client: Civil Aviation Authority
Main features of the Project: Project Management Consultancy, Project includes 21 sub projects of Runways, Passenger Terminal Building, Air traffic control tower, and other land infrastructure projects
Project Scheduling, project cost control, Extension of time claim, prolongation cost claim, preparation of Construction supervision manual, supervision of passenger terminal building, FIDIC bid review, preperation of Bid document under FIDIC
Water Treatment Plants and Laying of Water Supply system for 6 cities.
Asian Development Bank Funded Project
Preparation of bidding documents, Following bidding procedures, bid evaluation reports, design reports, Master planning reports, monthly progress reports. Review and work according to contract documents and specification. Managing and supervising the team, checking and reviewing Interim payment certificates, Prepare and finalize extra works and variation orders quantities. Making good relationship with client and contractors to handle the work in timely manner with the approved terms and condition.
Managing the project team, conducting workshops, meetings and record of meetings, collaboration with client and contractor. Manage Site construction management control and Quality control of the project. Managing the environmental and safety controls of the project. Manage Project Tracking and indicate project delay activities.
Name of assignment / Project: Water Sector Improvement Project 1- B1 (NC01 and NC02
Reach: Nara Canal Rehabilitation
Client: Sindh Irrgation and Drainage Authority
Funding: World Bank Funded Project
Review and work according to contract documents and specification. Managing and supervising the team, checking and reviewing Interim payment certificates, checking of measurement sheets and BOQ. Keeping record of site data and claims. Prepare and finalize extra works and variation orders quantities. Making good relationship with client and contractors to handle the work in timely manner with the approved terms and condition.
Managing the project team, conducting workshops, meetings and record of meetings, collaboration with client and contractor. Manage Site construction management control and Quality control of the project. Issuing site instructions to the contractor and also managing the environmental and safety controls of the project. Manage Project Tracking and indicate project delay activities. Managing site measurements sheets and interim payment certificates.
Time spent (Years-months) 1 year 6 Months
Project: Karachi Circular Railways
Funding: JICA
Responsibilities:
Establishing survey forms for Resettlement and Social plans, Environmental Studies with respect to technical aspects. Etc.
Time spent (Years-months) 1 Year
Project: Public Private Policy Frame Work
Client: Pakistan Railways
Funding: World Bank
Over all responsible of the project activities. Sites visits and data collection. Identify the construction defects. Report writing and recommends the improvement to be taken by the government to improve the infrastructure development. Review of Payment certificates as per work done and tender documents.
Time spent (Years-months) 4 months
Name of assignment / Project: DHA Cogen Power and Desalination Plant Project, DHA Karachi
/ Army Burn Hall College / Hyderabad Badin Dual Carriage way road
Exact duties performed: Collection of data, review the technical specification, financial model and Quantity Estimation related data. Develop the Review report and draft concession agreement.
Client: Karachi Port Trust
Main features of the Project: 82 story high rise building design and tendering and project management supervision
Time spent (Years-months) 1 Year
State Authorities
Main features of the Project: The Project includes Pre-Cast Structures and their erections of different Projects
Sound walls, road median barriers, bridge decks, railway plate forms, port scanning bays, Building Foundations and Wall Panels etc. Precast construction supervision and bidding
Key Project: Tri boro Bridge, Newyork
Metro North Rail road
, provide and track project schedule and prepare claims.
Rehabilitation of Different Building project of Chicago
More than 23 different Fuel Stations and 200 maintenance sites
(Experience Certificate available) •Quality Supervision and placement of Pre-cast beams, columns and roofs of the gas station.
•Preparing BOQ's, Specifications and Tender Documents.
•Bid opening and negotiations with the lowest bidder. (On time frame and Cost)
•Implementing design and problem solutions on the construction site.
•Managing time, labor and material quality on projects using MS Project for project management and material testing lab facility for quality assurance.
•Maintenance and renovation of gas station sites including pressure method for pipe testing.
•Supervision of fuel tank fabrication. Used NDT methods to check gauge, welding depth and quality of material verified by air pressure testing for leakage and strength.
•Surveying, marking, leveling, contouring and concrete analysis.
•Placement and connection of fueling tanks and delivering units, keeping detail track of slopes and density of soil for heavy vehicles.
•Fabrication and Installation of fiber glass domed and curved roof on aluminum frame for building.
•Supervision of construction and installation of CNG facility using vibration and seismic control equipment.
•Remodeling and extension of shell shop, new architectural features added to it by using
•Auto CAD and BOQ software.
•Worked as a safety engineer to control labor movement and hazardous stuff on site.
•Trained labors for fire protection and site safety.
•Used Radiation method to assist quality department in gauge and connection checking of canopies and provide on site essential maintenance.
•Quality Supervision and placement of Pre-cast beams, columns and roofs of the gas station.
Time spent (Years-months) 2 Year 8 months
. Construction Management