Telecom engineer
Prime gate company
Total years of experience :10 years, 8 Months
5G Aspiration project, dismantle link project, relocated RBS
, Troubleshooting
Supervising low current public address (speakers)
Supervising in cable data network
Supervising in connecting cable optical fiber
Supervising Microwave Installation, Configuration, Troubleshooting,
Optimization
Hardware upgrade from (1+0) to (1+1), (2+0), (1+1V) and (1+1H) protection
Dismantled old M.W Link
Link mmu2C-2D-2E-2H (XPIC configuration-2+0)
Installation and Configuration for ETU Ethernet traffic unit for 3G E1
Installation and configuration of Ericsson Traffic Node (TN) for 2P and 6P and 20P Traffic Nodes shift
Traffic between 6P to 20P
Site Survey out door for telecom microwaves pool and cable tray steers and roxtec till now
supervising GSM Installation
GSM Integration
GSM Troubleshooting
GSM Expansion
Sweep Tests for the Antenna’s Feeders
Installation and integration for 3G cabinets (6201) And Installation and configuration for 2G Cabinet 6201
MDT 3G cabinet first curial to second to Third curial
Check coverage, swapping of sectors
Installation For The LTE (4G)
MDT Swap Old Cabinet 2202 (900-1800) and 2206(900_1800) To new Existing 6201 1 Cabinet For 2G
MDT Expensing new cabinet(1800) our Add DTRUS for cabinet 2206 our TMA in Mopily Project.
MDT Expensing for Cabinet 6201 From (4+4+4) to (6+6+6) and From (6+6+6) To (8+8+8).