Ashraf Al Hour, Senior Projects Engineer/ Project Coordinator

Ashraf Al Hour

Senior Projects Engineer/ Project Coordinator

LREDC

Location
Qatar - Doha
Education
Diploma, Diploma in Civil engineering/ Buildings and QA/QC with grade A 84.5%
Experience
31 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :31 years, 2 Months

Senior Projects Engineer/ Project Coordinator at LREDC
  • Qatar - Doha
  • My current job since November 2010

Construction Package No. 1 (CP1) Marina District & WADI Area
Estimated Project Value is QR. 5.2 Billion. (In progress)
The first infrastructure work package for an area of 3.2 Sq.Km, works includes underground utility tunnel with 14.6 km length for both Wet tunnel (including District cooling, Pneumatic Waste collection, Irrigation, Potable water, Fire Alarm system) and dry tunnel(Cable management system, 66 &11 KV cabling, Fiber Optic Cables, CCTV, SCADA, Fire walls, 28 fan rooms with 334 ventilation Fans )services to serve 113 developers, 4 No’s of 66/11 KV under round substations connected to the mainLDSS1 station with approx. 125 KM of 66 KV cables, 40 No’s of 11KV substations, two No’s of portable water reservoirs as 80, 000 M3 capacity for each, 2 No’s of irrigation reservoirs, 2 No’s of storm water pumping stations and network, road works, and all related buried services and networks required for the city development such storm water network, landscaping for marina promenade, timber dicking, vacuum sewer station, Telecom exchange fit out works, DI & Stainless covers.

Job Responsibilities:
• Assisting the Senior Project Manager in the major tasks and prepare weekly status reports.
• Managing, monitoring and supervising the construction activities to insure the completion of CP1 (construction package 1) on time with highest quality and minimum cost.
• Visiting the construction site in daily basis and making weekly meetings with all parties, making task force meetings with all parties to control the delay and to speed up process at site.
• Following up with consultant’s design team and PM/CM all remaining design issues which have not been completed till date, to ensure the issuance of the IFC drawings to the main contractor on time.
• Coordinate and follow up with public authorities (KM, ASHGHAL, CIVIL DEFENCE, MOI...) to obtain the required approvals for tie in connections and services regulations.
• Holding coordination meetings with other partners whom working within the CP1 limit, like LRT, QDVC Car Park, Landscape, to solve the clashes issues due to works.
• Coordinate between the main contractor, Plot developers, logistic, safety and other stakeholders and departments to insure all parties are in line with LUSAIL’s rules and instructions.
• Holding a weekly Quality and Safety meetings with the contractor and all parties to ensure the highest limit of quality and safety are implemented.
• Control and monitor the progress of work at site.
• Held weekly contractual meeting to get involved in contractual issues belongs to the raised VORs and find the proper way to settle the bending matters.
• Review the submissions to GTC in coordination with our PM/CM, and making sure that the changes are justified very well.
• Review the revised work program/Schedule with PM/CM and analyze the delay to be recovered within the final completion target date of CP1, and to specify the main critical actives (CPM).
• To coordinate and assist for producing the final close out report where mention the main work plan and lessons learnt from historical trouble shooting. To participate as a team member to develop the Lusail project management procedures.

project manager at BARWA Real Estate .
  • Qatar - Doha
  • February 2007 to August 2010

Managing and coordinating for BARWA development projects, managing as team of consultants and PM/CM to deliver the assigned projects on time. such M- Tower as reimbursement from residential tower to hotel.
Al Jassim tower: fit out works including partitioning, furniture, data cabling, power modifications, internal cladding, and handing over to end user for offices use.
Al Fardan tower: offices modifications for BARWA Media at 16 th's floor, including all required power, data, partitioning, ceilings, toilets furniture, and handing over to the company for use.Scope of works including preparation of tender documents, review of specifications and contract documents(QCS, FIDIC), review and finalize contractors claims and variation orders.

Projects Coordinator at Doha Asian Games Organizing Ccommittee (DAGOC 2006)
  • Qatar - Doha
  • March 2006 to January 2007

manage and coordinate for the residential towers arrangements in order to accommodate the non sports teams joining for the Doha Asian games sports 2006.
follow up the construction works and the fit out works including furniture, services, catering, security, transportation, etc.

Project Engineer at Gettco Contracting Co.
  • Qatar - Doha
  • January 1999 to January 2006

Reviewing Sub-contractors’ monthly reports and evaluate revised schedules against master schedules.
General Site supervision for all construction works.
Assisting Project manager in all day-to-day issues.
Calculate and place construction material orders.

Infrastructure Inspector for L.L.P at Jordan Telecom Co. JTC with SIEMENS
  • Jordan - Amman
  • December 1995 to October 1998

 Supervision of main-contractors’ work - SIEMENS for the infrastructure works at local line plant for the national telecommunication Programme, including the installation of main cables, fibre optic cables with coordination with local authorities.

Assistant Site Eng. at AMRA Contracting &Housing Est.
  • Jordan - Amman
  • May 1995 to September 1995

 Worked as a member in a team of a main-contractor on a turnkey project - FILTERONA - British - Jordanian factory for Cigarettes Filters, construction & installation of steel structural works, earthworks & all related finishes.

Draftsman and Surveyor at Ziad H. Al Ajrashi Consulting Office
  • Jordan - Madaba
  • April 1994 to May 1995

Prepation of conract documents and drawings,
Surveying works for projects designed by the office.
Coordination and following up with local authorities to get the required approvals for design .

Assistant Site Eng. at Saad O. Al Aloul Contrating Office
  • Jordan - Amman
  • August 1992 to April 1994

 Site Supervision of Turnkey projects as client and main-contractor, construction of multistory building, steel structure warehousing, shopping complex projects including road works, excavation, leveling, foundations and all needed services and utilities.

Education

Diploma, Diploma in Civil engineering/ Buildings and QA/QC with grade A 84.5%
  • at Civil Engineering
  • July 1992

Civil engineering Diploma from Wadi El Seer College managed by UNRWA (United Nations ). Grade A , the first place at the level of college. Al Balqa Applied University Faculty Engineering Technology اHolds a fifth place at the level of Jordan in Civil Engineering DIPLOMA Exams in 1992 with 84.5 %

Specialties & Skills

Lean Construction
Quality Assurance
Cost Estimating
Primavera P6
Projects Management and contracts management
Multi Projects interfaces and clash analysis capability
High intention to Construction Health, Safety and Lojistics
lean construction

Languages

English
Expert
Arabic
Expert

Memberships

American Academy of Project Management
  • CIPM- Certified International Project Manager
  • April 2006

Training and Certifications

Managing Mega Projects (Training)
Training Institute:
BOSTON Management Consulting,Intl.
Date Attended:
May 2016
Duration:
21 hours
LEAN CONSTRUCTION Implementing the Project Delivery Process (Training)
Training Institute:
ENOVIO CONSULTING
Date Attended:
June 2015
Duration:
20 hours
Visionary Leadership and Management Skills (Certificate)
Date Attended:
June 2014
PMP Preparation for PMI exam (Certificate)
Date Attended:
June 2008
Valid Until:
July 2008
Risk with PERTMASTER (Certificate)
Date Attended:
June 2008
Valid Until:
June 2008
PMP Exam Preparation (Training)
Training Institute:
CMCS - PMI Registered Education Provider
Date Attended:
June 2008
Project and Quality Management (Certificate)
Date Attended:
June 2007
Valid Until:
June 2007

Hobbies

  • reading in social feils and following new construction technology
    Qatar National day events Award. Blood Donation member Award. PIM partner , BARWA. Doha Asian Games Committee Award and recognition letter for high performance achievements and efforts during DOHA 2006 events .