Construction Manager
Arkad Engineering and Construction
Total years of experience :22 years, 7 Months
• Coordinating internal resources and third parties/vendors for the flawless execution of projects.
• Ensuring that the project is delivered on-time, within scope and within budget.
• Develop a detailed project plan to track progress.
• Manage the relationship with the client.
• Perform risk management to minimize project risks.
• Coordinating internal resources and third parties/vendors for the flawless execution of projects.
• Planning, supervision and commissioning all the plant projects and modification including (budget allocating, SOW preparing and drawing updating).
• Monitoring, supervising and reviewing all the modification and the Warranty Deficits with the construction contractor.
• Monitoring and reviewing all the spare part in the warhorse and ordering the missing one.
• Coordinate and supervise all the third part maintenance activities inside the Plant including the new projects.
• Preparing and instructing training regarding safety and environment issues.
• Implement Operation Safety Policy instructions and ensure field work is conducted is compliance with all EHS applicable regulations and employee safety practices
• Preparing maintenance yearly budget.
• Evaluate the maintenance team performance and prepare the development plan for them.
• Obtain the necessary resources (equipment, manpower etc) effectively to meet long range and near term maintenance goals.
• Planning and supervising for all the maintenance daily activates (Electrical, Mechanical and Instrumentation) in a 300MW Co-generation Power Plant.
• Member of the capital project for upgrading the plant control system to DCS.
• Participate in the DCIS Factory Acceptance Test(FTA) in Abu Dhabi.
• Worked with Honeywell engineers in India in preparing the new system (ExperionPKS) drowing for one month and I was the sec team leader.
• Worked with the Technical Support Division on analyzing and assuring the completion of day-to-day maintenance works.
• Provide engineering directions, and control to the contractors in the execution of special projects.
• Worked on different instrument field equipment such as control/shut off valves, different type of pneumatic controllers, all typs of transmitters, analyzers and switches.
• Supervising the installtion and the comissioning of Bently Nevada vibration system instrument (3300), Teledyne HM Hydrogen Generator, 300 smart transmitters (Rosemount) and Ultra Sonic system for diffrintal leve.
• Worked on the schematic drawing, troubleshooting and modifications of the Automatic Plant Controll systems Functional
• Bachelor degree in Applied Electrical Engineering • GPA 2.932 on 4.0 scale. • Area of concentration : Power System Analysis and Digital Control System.