Total Years of Experience: 17 Years, 7 Months
July 2011
To Present
Quality And Technical Engineer
at ( QATAR STANDARDS) - Qatar General Organization For Standardization and metrology
Location :
Qatar - Doha
Duties
• Responsible for checking the technical compliance of quality according to (Qatar Construction Specifications) and international standards for ready mix concrete batching plants .
• Member of national concrete committee and meetings related to specification, standards.
• Representative and spokesman for the national standards in more than one conference.
• Study of projects related to standards, Contribute in market surveying processes.
• Checking manufacturers technical profile ( prequalification, mix design, technical data, and quality plan procedures according to specification and standards.
• Implement site inspection, audits to check plants operation, ensure that the activities completed as per specifications, requirements.
• Coordinate with producers and those responsible for collecting samples.
• Checking test results according to Specifications, standards, requirements.
• Making final report prior to Issue conformity certificates for plants.
• Make daily, weekly and monthly report, fill all the paper work related to work activities.
* Achievements(2011 till present) every year persuading and guiding 75 concrete plants to follow international standards and specification to sustain the environment as well as optimize their products.
• Responsible for checking the technical compliance of quality according to (Qatar Construction Specifications) and international standards for ready mix concrete batching plants .
• Member of national concrete committee and meetings related to specification, standards.
• Representative and spokesman for the national standards in more than one conference.
• Study of projects related to standards, Contribute in market surveying processes.
• Checking manufacturers technical profile ( prequalification, mix design, technical data, and quality plan procedures according to specification and standards.
• Implement site inspection, audits to check plants operation, ensure that the activities completed as per specifications, requirements.
• Coordinate with producers and those responsible for collecting samples.
• Checking test results according to Specifications, standards, requirements.
• Making final report prior to Issue conformity certificates for plants.
• Make daily, weekly and monthly report, fill all the paper work related to work activities.
* Achievements(2011 till present) every year persuading and guiding 75 concrete plants to follow international standards and specification to sustain the environment as well as optimize their products.
March 2009
To July 2011
Section Engineer
at Qatari Arabian Construction Company (A.C.C), Doha-Qatar.
Location :
Qatar - Doha
Project: Al-Udeid Air Base, U.S Air Base, Relocation Package Phase 1,
Military Buildings, Qatar Armed Forces - G H Q.
Duties
• Responsible for the entire civil, finishing activities (excavation, formwork, concrete pouring, reinforcement, paints, screening, tiling, waterproofing) at all areas of site.
• Developed the project Plan as per planning schedule and followed the consultant instructions.
• Handled, followed up project issues with project manager as well as top management.
• Prepared periodic reports showed the project/area progress and status.
• Managed, controlled the materials as project needs as per project needs.
• Developed the project Plan as per planning schedule to meet deadlines
• Monitored, managed the projects activities to mitigate the risks.
• Coordinated with the consultant, M.E.P& H.S.E, subcontractor, and suppliers, etc.
• Responsible of preparing reports before Payment for subcontractors and suppliers.
• Handled responsibilities of preparing daily, weekly, and monthly reports.
• Review, projects workshop drawing as per schedule and as built surveying.
• Arrange meetings with the owner and subcontractors to ensure those minutes will be taken.
Achievements(2009 till 2011) executing 2 buildings as well as completed headquarter building with all facilities.
Military Buildings, Qatar Armed Forces - G H Q.
Duties
• Responsible for the entire civil, finishing activities (excavation, formwork, concrete pouring, reinforcement, paints, screening, tiling, waterproofing) at all areas of site.
• Developed the project Plan as per planning schedule and followed the consultant instructions.
• Handled, followed up project issues with project manager as well as top management.
• Prepared periodic reports showed the project/area progress and status.
• Managed, controlled the materials as project needs as per project needs.
• Developed the project Plan as per planning schedule to meet deadlines
• Monitored, managed the projects activities to mitigate the risks.
• Coordinated with the consultant, M.E.P& H.S.E, subcontractor, and suppliers, etc.
• Responsible of preparing reports before Payment for subcontractors and suppliers.
• Handled responsibilities of preparing daily, weekly, and monthly reports.
• Review, projects workshop drawing as per schedule and as built surveying.
• Arrange meetings with the owner and subcontractors to ensure those minutes will be taken.
Achievements(2009 till 2011) executing 2 buildings as well as completed headquarter building with all facilities.
July 2007
To February 2009
Site Civil Engineer
at Construction Development Company (C.D.C), Doha-Qatar.
Location :
Qatar - Doha
Project: West Bay Hotel And Residential Towers (St-Regis Hotel -Doha).
Duties
• Responsible of Construction activities, managed construction excavation, formwork, steel rebar and pouring at all areas.
• Followed the project Plan as per planning schedule and followed mangers instructions.
• Handled, followed up project issues with project engineers as well as top managements.
• Prepared periodic reports showed the project/areas progress to follow up project schedules.
• Managed, controlled the materials checklist as per project needs and Supervised work activities.
• Monitored, executed the projects workshop drawing and surveying works.
• Dealt, coordinated with the consultants, M.E.P, H.S.E, subcontractors and suppliers, and other disciplines.
• Responsible, prepared reports before Payments for subcontractors / suppliers.
* Achievements(2007 till 2009) participated in (5 towers +10 villa in the same project ) with all facilities.
Duties
• Responsible of Construction activities, managed construction excavation, formwork, steel rebar and pouring at all areas.
• Followed the project Plan as per planning schedule and followed mangers instructions.
• Handled, followed up project issues with project engineers as well as top managements.
• Prepared periodic reports showed the project/areas progress to follow up project schedules.
• Managed, controlled the materials checklist as per project needs and Supervised work activities.
• Monitored, executed the projects workshop drawing and surveying works.
• Dealt, coordinated with the consultants, M.E.P, H.S.E, subcontractors and suppliers, and other disciplines.
• Responsible, prepared reports before Payments for subcontractors / suppliers.
* Achievements(2007 till 2009) participated in (5 towers +10 villa in the same project ) with all facilities.
August 2006
To June 2007
Site Engineer
at Salah Imam Trading And Contracting Company ( Alex -Egypt).
Location :
Egypt - Alexandria
Duties :
• Responsible for checking the construction works and related activities, formwork, rebar etc.
• Managed, monitored the site team to perform their jobs.
• Ensured that the activities completed according to project drawings and specifications.
• Coordinated with M.E.P and those responsible for the other activities.
• Prepared a daily, weekly and monthly report, and filled all the paper works related to the project updates.
• Attended all safety meetings, and new project H.S.E regulations.
• Controlled and arrange the needs of materials to meet the project Plans and schedule.
• Provided timely feedback to the management regarding site performance.
* Achievements(2006 till 2007) participated in (2 projects) in Cairo and Alex.
• Responsible for checking the construction works and related activities, formwork, rebar etc.
• Managed, monitored the site team to perform their jobs.
• Ensured that the activities completed according to project drawings and specifications.
• Coordinated with M.E.P and those responsible for the other activities.
• Prepared a daily, weekly and monthly report, and filled all the paper works related to the project updates.
• Attended all safety meetings, and new project H.S.E regulations.
• Controlled and arrange the needs of materials to meet the project Plans and schedule.
• Provided timely feedback to the management regarding site performance.
* Achievements(2006 till 2007) participated in (2 projects) in Cairo and Alex.
Share on Facebook
Share on Twitter
Share Via Email