Total Years of Experience: 19 Years, 5 Months
January 2018
To Present
PMC HSE Lead
at BILFINGER
Location :
Egypt - Suez
• Bilfinger Tebodin Middle East Ltd as (PMC) HSE Lead. - Jan 2018 till now. - Client: SONKER ENERGY.
- Liquid Bulk Terminal (Gasoil Tanks, LPG Tanks, related Infrastructure and Pipe lines 37Km. At EL SOKHNA Egypt.
- Construction phase. Commissioning and start up phases.
- Liquid Bulk Terminal (Gasoil Tanks, LPG Tanks, related Infrastructure and Pipe lines 37Km. At EL SOKHNA Egypt.
- Construction phase. Commissioning and start up phases.
July 2016
To December 2017
Senior HSE Engineer
at BECHTEL
Location :
Egypt - Alexandria
• BECHTEL as Senior HSE Eng. - July 2016 till Jan 2018. - Client: BP
- West Nile Delta Gas Development Project. At IDKU Egypt.
- Construction phase. (Giza Fayom plant up-grade, Reven Plant, Beach Crossing-pipe line)
- West Nile Delta Gas Development Project. At IDKU Egypt.
- Construction phase. (Giza Fayom plant up-grade, Reven Plant, Beach Crossing-pipe line)
July 2015
To June 2016
Site HSE Manager
at Enppi
Location :
Egypt - Alexandria
- Site HSE lead on (TURAS& LIBRA) Modification Project and Shut down 2016 (BURULLUS Gas- Shell).
August 2014
To June 2015
QHSE Engineer
at (Enppi & TOYO) construction phase
Location :
Egypt - Alexandria
construction- commissioning and start up Phase for petrochemicals (Ethydco)
May 2013
To August 2014
HSE Team Lead
at GUPCO BP
Location :
Egypt
1. Ensures the implementation of the HSE Procedures and Manuals is in line with company standards / local government regulations.
2. Ensures that all maintenance and production activities on site are carried out in a safe manner and in adherence to the Company Safety policy, Statutory Regulations and Guidelines as minimum requirement.
3. Implementation of necessary control measures to ensure that risks are reduced as low as reasonably practicable.
4. Contributing and supporting the development of the offshore HSE strategies and guidelines.
5. Produce applicable HSE metrics, measurements and reports that track progress and results regarding exposure hours, recordable incidents, restricted duty incidents, lost time incidents, first aid incidents and near miss incidents.
6. Inspects or tours facilities to detect existing or potential accident and health hazards.
7. Recommends corrective or preventative actions where indicated.
8. Implementation of the project HSE Plan/Owner BP
9. Training sub-contract Supervision and HSE Personnel.
10. Continuing Hazard Analysis.
11. Audit of sub-contractors to assess compliance
2. Ensures that all maintenance and production activities on site are carried out in a safe manner and in adherence to the Company Safety policy, Statutory Regulations and Guidelines as minimum requirement.
3. Implementation of necessary control measures to ensure that risks are reduced as low as reasonably practicable.
4. Contributing and supporting the development of the offshore HSE strategies and guidelines.
5. Produce applicable HSE metrics, measurements and reports that track progress and results regarding exposure hours, recordable incidents, restricted duty incidents, lost time incidents, first aid incidents and near miss incidents.
6. Inspects or tours facilities to detect existing or potential accident and health hazards.
7. Recommends corrective or preventative actions where indicated.
8. Implementation of the project HSE Plan/Owner BP
9. Training sub-contract Supervision and HSE Personnel.
10. Continuing Hazard Analysis.
11. Audit of sub-contractors to assess compliance
August 2010
To May 2013
Section Head
at SHABAKAT company (NATGAS
Location :
Egypt - Alexandria
June 2007
To August 2010
senior engineer
at NATGAS Company (EL-KHARAFI
January 2007
To June 2007
maintenance engineer
at mobile communication at Itsalatinternational (I2)
Location :
Egypt - Alexandria
October 2004
To January 2007
maintenance engineer
at Air defense forces
Location :
Egypt - Suez
supervisor
at HSE
over to 8 projects, ETHYDCO POLY ETHYLEN
Project, Offshore Platforms Rehabilitation Project (RAS SHOQER),
Nubaria Power Plant (module 3) and ALATF Power Plant from starting
to hand over passing throw excavation, welding, radiation inspection, working
at heights, equipment inspection, commissioning and construction activities.
Skills * Ensure implementation of the company procedure in all the company activities
according to
Project, Offshore Platforms Rehabilitation Project (RAS SHOQER),
Nubaria Power Plant (module 3) and ALATF Power Plant from starting
to hand over passing throw excavation, welding, radiation inspection, working
at heights, equipment inspection, commissioning and construction activities.
Skills * Ensure implementation of the company procedure in all the company activities
according to