project manager
south hill contracting
Total years of experience :16 years, 9 Months
project manager in Almarai cpp and bakery in alkharj.
• I am responsible in monitoring the implementation of the quality system based on project specifications and contractual requirements.
• I establish procedures to ensure compliance with quality requirements of the project.
• I advise the Production Engineers and Factory QC Team on quality related matters.
• I ensure effective implementation of the system and maintain quality records.
• Issues non-conformance report that does not comply with contract documents.
• Ensure that all materials and equipment installed on site conforms with the contract
• Review test procedures, coordinate and agree with consultant for every step.
• Assumes the logging of non-conforming works and the corrective action procedures and such, to concerned site manager.
In my responsibilities are including:
Production of precast pre stressed and non-pre stressed elements
Materials inspection: steel, mixed concrete, inserts PVC and others...
Mold inspection, coasting supervision, curing, DE molding, and others...
Final inspection for, delivery the panels to site/ or for repair
Inspection every step of erection process
Finishing and furniture works
project engineer in RIYADH WATER SUPPLY ENHANCEMENT PROGRAM.this project included 2 generals tasks:
1. Build a water treatment plants, water tanks, cooling towers, erection of precast administration building, power room (SCECO) in 12 regions in Riyadh city
2. Delivery and erection of GLS water tanks.
My duties were as following:
• acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives;
• setting out, leveling and surveying the site;
• checking plans, drawings and quantities for accuracy of calculations;
• ensuring that all materials used and work performed are as per specifications;
• overseeing the selection and requisition of materials and plant;
• agreeing a price for materials, and making cost-effective solutions and proposals for the intended project;
• managing, monitoring and interpreting the contract design documents supplied by the client or architect;
• liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project;
• liaising with the local authority (where appropriate to the project) to ensure compliance with local construction regulations and by-laws;
• liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress;
• day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors;
• planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines;
• overseeing quality control and health and safety matters on site;
• preparing reports as required;
• resolving any unexpected technical difficulties and other problems that may arise
I work as following:
1. 2012 project manager in Silica powder factory (total area 52000 SQM)
2. 2011 project manager in Glass house extension factory (total area 22000 SQM)
3. 2011 project manager Ministry of defense maintenance warehouse ( total area 18000 SQM)
4. 2010 project manager in PEPSICO extension warehouse (6000 SQM)
5. 2010 project manager in Glass house factory project (5000 SQM) Riyadh
6. 2009 site engineer in Panda central warehouse (32000 SQM) Riyadh.
In the above small projects i reported to projects manager based on the activities:
• Reviews project plans and proposals, then works with management to develop project objectives. Identifies project responsibilities by determining the phases and elements of the project. Calculates time frames and sequences the stages of the project.
• Prepares and distributes a description and timeline of the project.
• Studies product design, customer requirements performance standards, then determines project specifications. Presents cost estimates and performance standards. Conducts tests assuring safe and satisfactory product performance.
• Reviews contractor bids; interviews and assigns subcontractors to specific phases and elements of the project. Through project coordination meetings and other forms of communication, oversees and coordinates the technical aspects of the project.
• Prepares status reports and regularly monitors budgets, contractors and schedules. Allocates project resources appropriately; approves expenditures; employee contractor contracts. Keeps an accurate record and electronic data base of all elements of the projects.
• Presents procedures, rules and regulations to those involved in the project; maintains a safe, clean and productive environment through enforcing procedures. Maintains project integrity and reputation through compliance with state and federal regulations.
supervising and control the people to execute the tasks as per the plan and order received from the construction manager.