SITE ENGINEER
CONSTRUCTION AND RECONSTRUCTION COMPANY
Total years of experience :4 years, 1 Months
PROJECT:
47 Villa Gems 1 and Gems 2 - Damac Hills
ACTIVITIES:
1- Prepaer manpower daily allocation.
2- Site work arrangement.
3- Steel Reinforcement and Shuttering, checking and submitting.
4- DDA paper work preparing and site inspection.
5- Concrete work including testing and casting for all kind of elements, Slab, Columns, Retaining Wall, Tie Beams, etc..
6- Repairing and surfaces preparing for concrete.
7- Coordinate with MEP team to keep site progress on track.
8- Block work maintaining and checking.
9- Check for all block work accessories.
10- Arrange and order all required materials for the site.
11- Checking the quality of all work.
PROJECTS:
(A) Hording Fixing in the malls of Al-Futtaim Group - Sharjah& Dubai.
(B) Taraf Restaurant Fit-Out - Dubai.
ACTIVITIES:
1- Supervision all kind of fit-out work in the site .
2- Check the quality of the work and meet all the client comments.
3- Organize between the MEP and the civil work.
PROJECTS:
(A) DAMAC Sales Center - DAMAC HILLS 2 (Full Fit-Out).
(B) JUMEIRAH - MARSA Al ARAB - Building 1 & 2 (Marble supplying and Installation).
ACTIVITIES:
1- Preparing daily, weekly, monthly manpower allocation.
2- Organize between the fit-out work and MEP Checking the quality of gypsum, wood, paint and finishing work.
3- Take exact on site measurements for marble orders.
4- Check all the Marble work including the finishing (Repairing, Grouting and Polishing).
PROJECTS:
(A)- TECOM-HIMALAYA BUILDING.
(B)- TECOM PT233 OFFICES AND LABS BUILDING.
ACTIVITIES:
1- Assist in preparing manpower daily allocation.
2- Checking the quality of all work including structure and finishing.
3- Order all required materials for the site.
4- Raise request for Dubai Municipality site visit.
5- Concrete work, including testing and casting.
6- Block, plaster, painting, tile, and all repairing work.
PROJECTS:
(A) Sheikh Zayed Housing Programme (SZHP) Villas - Sharjah.
(B) Department of Housing Villas - Sharjah.
ACTIVITIES:
1-Supervision the construction process.
2-Checking the quality of the construction.
3-Preparing paperwork for each project.
PROJECTS:
(A) “Al Ramla Villas” (Sharjah): The project consist of 13 villas.
(B) Warehouse and Labor Accommodation G+1 (Industrial Area 2 - Sharjah).
(C) “Mozon 5” Building G+5 and Parking Area (Industrial Area 6 - Sharjah).
ACTIVITIES:
1- Concrete work, including testing and casting.
2- Checking the finishing process for “Al Ramla Villas” and “Mozon 5”.
3- Excavation and Steel & Form work for isolated foundations.
4- Installation the steel frame for warehouse.
5- MEP work and connections.
-A previous President of American Society of Civil Engineering (ASCE) Students Chapter. -Participated in the International Conference on Civil and Infrastructure Engineering (ICCIE). -Worked in highway design project in college senior year, which include the design of the HMA and base layers using recycled materials. -Worked and participated in designing wooden bridge.