أحمد عطية, Project Manager

أحمد عطية

Project Manager

KCC Engineering and Contracting Company

البلد
الكويت
التعليم
بكالوريوس, Electrical power and machines Engineering
الخبرات
18 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 4 أشهر

Project Manager في KCC Engineering and Contracting Company
  • الكويت - الكويت
  • أشغل هذه الوظيفة منذ يناير 2019

- Handle and Manage a Project for Electrical and Instrument Maintenance for MEW (Ministry of Electricity and Water) For Water facilities in All sites of Kuwait.
- Handle Project Management through all phases of the project (initiation, Planning, Execution, Monitor and Control, Closing)
- Handle the Project Scope, Cost, Procurement, HR, Time, Quality, Communication, Risk and Stakeholder management.
- Represent the Company in All the Client meetings and Discuss and Negotiate to accomplish the Company targets and the client Goals.
- Handle all the company reports and Progress plan.
- Handle the project finance and Schedule.

Senior Electrical Engineer
  • أكتوبر 2014 إلى يناير 2019

Page | 4 Ahmed attia abdElsadek
Project Name: Maintenance and repairing of Electrical Equipment in water sector in
different location in the state of Kuwait
Job Description:
- coordinate with ministry maintenance department to plan/carryout maintenance routine and
nonroutine activities.
- Review all shop drawings and submittal for any new installations (switch gear, control panels,
HVCB, LVCB, lighting, UPS, Cathodic protection, Diesel generator, power transformers,
starter panels, AC motors )
- Responsible for testing, Troubleshooting and maintenance for protection relays such as
distance, Motor protection relay, overcurrent, earth fault, differential, unbalance, under/over
voltage, loss of excitation and under/over frequency.
- Design and submit any modification in the site and perform the risk management.
- Planning the Electrical Section Maintenance Schedule and troubleshooting activities.
- Manage/supervise maintenance team to Troubleshoot and maintain Electrical system in water
plants (pumping stations, RO, Underground wells, chemical plants and reservoirs).
- preparing daily/monthly reports for project management.
- Manage and supervise the department Quality control.
- preparing technical reports Using SAP program.
- preparing financial sheets according to project BOQ.

Senior Electrical Maintenance Engineer في Electricitee de france, EOC
  • مصر - السويس
  • مارس 2010 إلى أكتوبر 2014

in EDF-EOC (Electricity de France,
Egyptian Operating Company) SUEZ GULF POWER STATION (2X340 MW steam)
(20 MW gas)
From 2010 to 2014
 Electrical Maintenance Engineer in Ayoun Mousa Steam Power station (320
MW) in Egyptian Ministry of Electricity and Water.
From 2006 - 2010
 Electrical Construction Engineer in Egyptian Company for iron and steel (EIS)

Electrical Maintenance and operation Engineer في Ministry of Electricity and Power, East Delta electricity Production Company
  • مصر - السويس
  • أكتوبر 2006 إلى مارس 2010

(EDEPC) in Ayoun Mousa steam power station (2  320 MW), SUEZ.
Job Description
- Carry out operation procedure for starting up and normal operation of the boiler in a steam
turbine power plant and the Auxiliary system of Closed cooling, Condenser, water pumps …
- Carry out maintenance, troubleshooting and testing for 500/220/12 K.V Autotransformer.
- Carry out maintenance, troubleshooting and testing for 500 K.V and 220 K.V GIS (Gas
insulated substation) and switchgear.
- Carry out maintenance, troubleshooting and testing for 320 MW Siemens generator, 18 K.V
Main transformers and 6.6 K.V Auxiliary transformers.
- Responsible for engineering, Troubleshooting and maintenance for problems of Medium
voltage (6.6 K.V) and low voltage bus bars and protection relays.
Page | 6 Ahmed attia abdElsadek
- carry out routine maintenance and troubleshooting of ( 110, 48, 220 ) Volt UPS system and
battery chargers.
- Ensure best collaboration among electrical staff and good correlation with other sections.

Construction Engineer في Egyptian Company for Iron and Steel (EIS)
  • مصر - السويس
  • يناير 2006 إلى أكتوبر 2006

- Carry out installation and testing for 22/0.4 K.V transformers and making site test.
- Carry out installation and testing for switchgear 22 K.V with Vacuum circuit breakers.
- Carry out installation and testing for medium voltage and low voltage cables.
- Carry out installation and testing for PLC (general) and termination for inputs and outputs.
- Ensure the best collaboration among electrical staff and good correlation with other sections.

الخلفية التعليمية

بكالوريوس, Electrical power and machines Engineering
  • في Cairo University
  • مايو 2005

Accumulated Grade: Good. * Project name: Designing Motor control Centre (MCC) with automatic transfer switch (ATS) and measuring harmonics.

Specialties & Skills

Project Management
Electrical Maintenance
Electrical Engineering
Water Treatment
Power Plants
PROJECT MANAGEMENT
REPORTS
SWITCHES
TOSHIBA
TROUBLESHOOTING
SIEMENS NIXDORF HARDWARE
CABLING
ENGINEERING

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس
الفرنسية
مبتدئ