Electrical consultant engineer
Sabbour consulting
Total years of experience :16 years, 1 Months
New aswan hospital project
Example of Projects Handled with AL ENGAZ ELTAM :
-repairing and maintenance for The Ministry of Housing and
Utilities building
-repairing and maintenance for The South Aziziyah Court
building
-design and execute installation for private clinics (dr. Mohamed
moafa clinics )
-installing lighting and power for al-saadia treaning center
- demolition for international Tripoli airport
- repairing and maintenance for The guest house
- repairing and maintenance for prime minister building
- repairing and maintenance for maitiqa air port
OTHER PROFESSIONAL EXPERIENCES, REFERENCES
Installation of generator, Transformer, Switchboard, MCC, Panel board, Distribution
board, ATS and Bus Coupler.
Installation Low Voltage Network.
Troubleshooting of Electrical Panels.
Schneider Panels and Component.
Motor Control Centers.
Capacitor Bank.
Low Voltage Earthling.
Engineering Documents :
o Power Cables Schedule, Control Cables Schedule, Instruments Cable Schedule,
Instruments Supply Cable Schedule, Instruments Supply Cable Schedule, Load List,
Cable Routing Layout, Interconnection Diagram, Single Line Diagram, I/O List of
Control System, BOQ.
Cables Calculation.
Transform Size Calculation.
Generator Size Calculation
EDUCATION
Period 2002
Installing 220 kv Substations for general electric company of
Libya (Gecol)
El zeraa 220 kv substation, eljalaa 220 kv substation, stadium
220kv substation, el tabba 220 kv substation, hay elsalam 220
kv substation
Execute :-
Low voltage network
Lighting
Distribution board
Cable trays
Sockets . switches
preparing daily reports to follow up on the production line faults
and maintenance
Electrical power