Team leader Electrical&IC engineer
Veolia
Total years of experience :20 years, 0 Months
** Managing a diverse team of professionals.
** Techno commercial Bid evaluation for the various EIC Equipments.
** Attending HAZOP study meeting.
"** Preliminary technical discussion relevant to control system and
instrumentation & attending kick-off meetings with client,
consultant to understand the technical requirements of automation and control system instrumentation."
** Responsible for basic & detail engineering of following drawings
:) P&ID :) Control philosophy
:) PLC I/O list :) PLC system configuration
:) Instrument Hook-ups :) Instrument index, Data sheets,
:) Junction Boxes details :) Electrical/Control cable schedule
:) Termination schedule :) Instrument loop wiring diagram
:) SLD :) MCC/Control panel schematics
:) PLC wiring diagrams :) Construction shop drawings
:) Cables layout :) Earthing, lighting. Calculations
"** Internal coordination with various departments for timely completion of material supply drawings and other
inputs for early completion of Project"
"** Involved in inspection and FAT of electrical/ instrumentation items.
"
** Regular client visit during Designing to sort out problems and clearing on others package interface.
"** Designing and reviewing the system configuration, General arrangement Diagram for MCC, Control panel,
Junction boxes, LPBS, LCP, PLC, Cable Routing."
** Preparation of EIC package cost estimate complete with technical and commercial part.
1.Familiar with low voltage switchgear applications.
2. Preparation of electrical package cost estimate complete with technical and commercial part
3. Pre bid internal negotiation for targeted strategic projects, and negotiating with supplier rate contacts and discounts to secure cost effected deals
4.Selecting, sizing, Calibration and trouble-shooting of all instrumentation and electrical components related to the water and waste water systems.
5.Familiar with NEMA and IEC standards, as well as the NEC and IEEE code, have also been involved in Hazardous Area application
6Proficient in producing P& ID’s as well as Logic Diagrams, cause & effect diagram, Instruments Loop Diagrams, instruments data sheet, in addition to standard electrical drawings:
Single line diagrams
Motor control centers
Control panels
PLC wiring diagrams
Construction shop drawings
7Preparation of quality control documents for manufacturing and inspection test plan
8. Design and selection of system components.
9. Participates in the technical discussion with clients / consultants
and Electrical project management.
10. Draft layouts, bill of quantities, and purchase orders.
11.Prepare technical submittal to consultants.
12 Forecast schedules of activities.
13. Insure progress of construction/installation, through extensive Site visits and meetings.
14. Supervise, if required, on site electrical works up to and including Commissioning and handover to client