Planning Team Leader at Orascom Construction
  • Egypt - Cairo
  • My current job since March 2015

• Prepare baseline schedule, revised schedules and recovery schedules considering all inputs (manpower, equipment and materials) availability, production and construction sequences.
• Develop and update resource (manpower and equipment) histogram weekly or monthly as required
• Evaluate allocation of resources and provide recommendations to maintain required progress
• Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analysis deviations from plan.
• Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline.
• Preparation of accurate Earned Value and Budgeting reporting in monthly basis
• Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
• Study and analyze the impact of any event or variation on the time schedule and prepare the EOT claims.
• Prepare baseline schedule, revised schedules and recovery schedules considering all inputs (manpower, equipment and materials) availability, production and construction sequences.
• Develop and update resource (manpower and equipment) histogram weekly or monthly as required
• Evaluate allocation of resources and provide recommendations to maintain required progress
• Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analysis deviations from plan.
• Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline.
• Preparation of accurate Earned Value and Budgeting reporting in monthly basis
• Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
• Study and analyze the impact of any event or variation on the time schedule and prepare the EOT claims.

Project Controls Engineer at rmc consulting
  • Egypt - Cairo
  • September 2012 to February 2015

· Assisting in establishing a client's requirements and undertaking feasibility studies
· Preparing tender and contract documents.
· Tender Evaluation; which includes detailed financial review and analysis of the submitted offers, Contractual review and evaluation and comprehensive Technical review
· Reviewing project Schedule, Full Loaded Baseline, updates and all Deliverables prepared by Contractor
· Reviewing and Approving Variations and Claims submitted by Contractor
· Reviewing and Approving EOTs Submitted by Contractor
· Monitoring and Controlling at Project’s Time and Cost using EV analysis
· Attendance of progress meetings with owner, PM and CS and preparation of meetings minutes

PLANNING ENGINEER (part time) at AL-ANSARY FOR CONTRACTING
  • Egypt - Cairo
  • October 2012 to December 2013

• Preparation of Baseline Program for project at the tendering stage as per the scope of work using Primavera 6 according to Contract stipulations.
• Complete resource planning including labor & non labor as per project scope.
• Preparing a narrative progress report at monthly basis that depicts clearly status of the project progress.
• Preparation of related reports (lookaheads, resource histograms, cash flow … etc)
• Cost loading and monitoring the cash flow & project progress.
• Performing any necessary adjustments or/and recovery plans to the program to respect the time frame of the project.
• Preparation of detail documents for extension of time for the project.
• Preparation of recovery plans and corrective actions.
• Preparation of proposed plans

Planning Engineer at El Nasr of Civil work
  • Egypt - Cairo
  • September 2009 to August 2012

• Prepare Master schedule and Budget
• Prepare detailed schedule using Primavera P6 (Mobilization, Engineering, Procurement, Construction Schedule and
Material Delivery).
• Evaluate Main Contractors Proposals and Award one based on the evaluation Criteria
• Monitor and Control the Construction Schedules and Costs.
• Monitor Critical/ Near Critical Paths.
• Monitor Main Contractor Payments.
• Revise the schedule & create new version of baseline if needed
• Preparing and Reporting a narrative progress report at monthly basis that depicts clearly status of the project progress
and issues of concern with regard to constraints.
• Performing any necessary adjustments or/and recovery plans to the program to respect the time frame.
• Review Technical Specification, BOQ, drawings and quantity take off.

Education

Doctorate, Construction Management and Engineering
  • at Cairo University
  • December 2015

Ongoing

Master's degree, CONSTRUCTION MANAGEMENT AND ENGINEERING
  • at CAIRO UNIVERSITY
  • February 2014

• Courses: - Construction Economy and Accounting - Infrastructure Asset Management - Artificial Intelligence in Construction Management • Thesis: “Decision Support System for Mixed Infrastructure Management”

Diploma, PROJECTS MANAGEMENT
  • at CAIRO UNIVERSITY
  • January 2012

• Courses: - Construction Management - Cost Estimate and Control - Construction Laws and Contracts - Organization Behavior - Projects Planning and Control

Bachelor's degree, Civil Engineering
  • at CAIRO UNIVERSITY
  • September 2009

Bayt Tests

IQ Test
IQ Test
Score 88%

Specialties & Skills

Quantity Surveying
Planning
Cost Management
Project Management
Primavera P6
Primavera 6
Risk analysis
AutoCAD
excel VBA

Languages

English
Expert

Training and Certifications

Contractual and Legal Aspects in Construction (CLAC) (Certificate)
PMI Scheduling Professional (PMI-SP) (Certificate)
Project Management Professional (PMP) (Certificate)

Hobbies

  • Reading