AHSANUL HAQUE, Mechanical Engineer

AHSANUL HAQUE

Mechanical Engineer

Samsung Saudi Arabia.

Location
Saudi Arabia - Jubail
Education
Bachelor's degree, Mechanical Engineering
Experience
13 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 3 Months

Mechanical Engineer at Samsung Saudi Arabia.
  • Saudi Arabia - Hofof
  • April 2022 to November 2023

Position : Mechanical Engineer. Project Site: Aramco Huwaiyah Unaiyzah Gas Reservoir Storage Project. KSA. Duration : 26 April 2022 to 30-Nov 2023.

Mechanical Engineer at G. S Construction Arabia Co
  • Saudi Arabia - Eastern Province
  • January 2020 to February 2022

Handling the site execution erection and alignment work at site
Following the Aramco standard for equipment installation alignment inspection Pre-commissioning and Commissioning work.
Follow up HSE and permit to work at site.
Installation all kinds of equipment like Pupm, Motor, Turbine, Compressor, Air Fan Cooler, Expander, Fire Water Pump I.A compressor vessel column, heat exchanger etc
Knowledge and inspection of all piping equipment work.

Mechanical Engineer at G. S Engineering Construction Corp
  • Bahrain - Al Muharraq
  • August 2018 to March 2020

Responsible for installation, Pre-Commissioning, Commissioning & Operations for rotating equipment.
❖Coordination with vendor to complete to carry out work & pre commissioning activities on site.
❖Prepare MRT procedure & check list for all rotating equipment like Compressors, N2 Compressor, Cold Booster expander, Air fan cooler, BOG Compressor, Re-gas, LNG Booster Pump, Fire Water Pump, I.A Compressor, FSU Marine loading arms etc.
❖Conducted quality checks of mechanical equipment’s during construction, Pre-Commissioning and
Commissioning stages. Supported commissioning and start-up activities.
❖Involved to the Pre Commissioning work activity like motor Solo run test of motor, Fire water Pump, Sea Water Pump, chiller compressor, Main air compressor & N2C work in mechanical activity.
❖Handling the site supervision and preparation of lube oil flushing and oil circulation, testing activity under vendor supervision.
❖Maintaining up to date Preservation records sheet activities of equipment before and after installation.
❖Involved all rotating equipment MRT like Main Air Compressor, N2 Compressor, Air Fan Cooler, Cold Booster Expander, Fire Water Pump, Instrument Air & Chiller compressor etc.
❖Mechanical Running Test for all rotating equipment recording data & maintained all record in sheets.
❖Commissioning activities are conducted as per Health, Safety, Environmental & quality policies and Procedures. Activities at site and reviewing project schedule.
❖Checking all the Parameters of Mechanical (MRT) run test during all Variation Point Check Vibration, Temperature, Noise and(If any abnormal sound rectify) recorded all reading in Data Sheet.

Piping Engineer at Dodsal Engineering Construction pte. Ltd
  • Kuwait - Al Jahra
  • November 2016 to April 2018

❖Reviewing all IFC Piping drawing and interface with client and engineering for KOC GC-31-Project.
❖Reviewing, Coordinating & monitoring all activities related to the Execution work of Piping installation and alignment of pipe and coordination with Qc for inspection for clearance.
❖Responsible for the Counter Checking by Isometric Piping Plan for the spool erected in correct location Orientation, alignment and Plumpness, Piping Routing.
❖Review and approval of documents submitted by EPC contractor such as, method statement, ITP, Site technical Queries, Material Approval Request as well as review and approval of drawing based on Requirement.
❖Work in multi-disciplinary teams supporting for piping installation alignment and hydro testing team.
❖Review & approval of the Test pack generated by Sub-Con Participating in work down for the verification and Completion of Piping System prior to release for Hydro test / Pre-commissioning / Commissioning.
❖After Completion of line Checking and Short out the Punch line. Client approval for Pre-commissioning and Commissioning procedures, including flushing activities, (Air blowing, Site Integrity Test, Markup P&ID).
❖Coordinate between various interfaces during hydro testing work at Site.
❖Resolving system problems, including submitting Request for Inspection (RFI’s), correcting or suggesting resolutions and Providing written report of the results.
❖Supervision of all construction work related activities and maintain all quality work according with standards.

Mechanical Engineer at Target Engineering Construction Company
  • Qatar
  • April 2015 to September 2016

Review and approval of documents submitted by EPC contractor such as, method statement, ITP, Site technical Queries, Material Approval Request as well as review and approval of drawing based on Requirement.
❖Work in multi-disciplinary teams supporting for piping installation alignment and hydro testing team.
❖Review & approval of the Test pack generated by Sub-Con Participating in work down for the verification and Completion of Piping System prior to release for Hydro test / Pre-commissioning / Commissioning.
❖After Completion of line Checking and Short out the Punch line. Client approval for Pre-commissioning and Commissioning procedures, including flushing activities, (Air blowing, Site Integrity Test, Markup P&ID).
❖Coordinate between various interfaces during hydro testing work at Site.
❖Resolving system problems, including submitting Request for Inspection (RFI’s), correcting or suggesting resolutions and Providing written report of the results.
❖Supervision of all construction work related activities and maintain all quality work according with standards.
❖Reporting and submit on time daily scheduled and Progress Of Worked directly to the Manager. Received approved
Drawings and following as Per QP Specification as Per Project Standard.
❖Coordination with QC and PMC for final inspection of the line Checking with Packages.
❖Plans and lay-out work from oral and written instructions, assigns and supervises to the work of piping engaged the installation, repair and maintenance of plumbing, firefighting system $ Sprinkler fixture accessories.
❖Looking for all U/G & A/G Piping, Cement line Carbon Steel & Cu-Ni Firefighting sprinkler system work.
❖Participating in mechanical completion walk down for piping and mechanical work through at site.
❖ Follow up the work schedule & Co-ordination with client and sub-contractor for work progress.
❖Overall site Responsible for (Mechanical/Piping/Steel) Monitoring and prepare tie-in points & Tie-in packages
Rising work inspection requests after completion of each activity (Coordinate with site QC representative)
❖Co-ordination with QP for inspection works during final inspection.

Mechanical Engineer at Samsung Engineering Co.Ltd
  • United Arab Emirates - Abu Dhabi
  • August 2012 to September 2014

Installation alignment and inspection of all type of equipment like Turbine, Compressor, Pump, motor, Air Fan Cooler, Lube oil Cooler, Lube Oil Console, heat exchanger Column Vessels, Scrubber etc.
❖Follow up the Rim & Face, Reverse and Laser Alignment of Pumps, Compressor, Turbine, etc.
❖To Check the availability and fitness of Construction equipment and of to Check the Personnel Mobilization and Demobilization.
❖Plant utilities startup (Nitrogen Generation unit, Instrument air Unit, Utility water Pumps) and operation
Self-motivated and able to work as part of a work team.
❖Prepare Piping & equipment system punch list and familiar all type of equipment Package.
❖Assembly, Erection, Commissioning & Operation of EOT 10T, 15T, 60T & 100T EOT Crane.
❖Planning & Scheduling for Mechanical Works, Vendor selection for site execution.
❖Inspection & final box-up of equipment. Handling drawings, manpower control, and site work execution.

Mechanical Engineer at Samsung Engineering Co Ltd
  • India - Bharuch
  • July 2011 to July 2012

❖Installation alignment and inspection of all type of equipment like Turbine, Compressor, Pump, motor, Air Fan Cooler, Lube oil Cooler, Lube Oil Console, heat exchanger Column Vessels, Scrubber etc.
❖Follow up the Rim & Face, Reverse and Laser Alignment of Pumps, Compressor, Turbine, etc.
❖To Check the availability and fitness of Construction equipment and of to Check the Personnel Mobilization and Demobilization.
❖Plant utilities startup (Nitrogen Generation unit, Instrument air Unit, Utility water Pumps) and operation Self-motivated and able to work as part of a work team.
❖Prepare Piping & equipment system punch list and familiar all type of equipment Package.
❖Assembly, Erection, Commissioning & Operation of EOT 10T, 15T, 60T & 100T EOT Crane.
❖Planning & Scheduling for Mechanical Works, Vendor selection for site execution.
❖Inspection & final box-up of equipment. Handling drawings, manpower control, and site work execution.
❖Monitoring of heavy equipment erection, Like Compressor, Turbine, Column vessels etc.
❖Project scheduling, progress monitoring & follow-up, Co-ordination with client and sub-con for progress.
❖Handling the Pre-Commissioning activity and Commissioning work along with Preservation & Operations for all rotating equipment.
❖Coordination with Mechanical, Piping, Civil Engineers, Discuss technical aspects of Mechanical system with Contractor towards successful completion of project

Mechanical Engineer at Metal Craft Contractors Pvt Ltd
  • India - Bharuch
  • May 2010 to June 2011

❖Handling Piping Installation alignment and inspection work as per project standards
❖Supervision of Pipe erection on site and proper orientation Gap check and vertical check by plum.
❖Mechanical completion walk down for piping and mechanical work through at site.
❖Overall site Responsible for (Mechanical/Piping/Steel) Monitoring (Coordinate with site QC representative)
❖Co-ordination with EIL for inspection works during final inspection.
❖Reporting and submit on time daily scheduled & progress of worked directly to manager.
❖Successfully managed the erection, testing and commissioning of Process equipment’s and piping.
❖Good technical team and interpersonal skills Inspection of piping fabrication as per the isometric Drawing.
❖Witness of Hydro Test and Pneumatic test of piping at work site
❖Coordinate with client and QC inspectors for arranging inspections for piping work activity.

QC Piping Inspector at B. S. T Engineering Construction Co
  • India - Delhi
  • September 2009 to March 2010

❖Supervision and inspection of Pipe Fit-up checking visual inspection
❖Co-ordination with for inspection works during final inspection.
❖Reporting and submit on time daily scheduled & progress of worked directly to manager.
❖Successfully managed the erection, testing and commissioning of Process equipment’s and piping.
❖Good technical team and interpersonal skills Inspection of piping fabrication as per the isometric Drawing.
❖Witness of Hydro Test and Pneumatic test of piping at work site
❖Coordinate with client and QC inspectors for arranging inspections for piping work activity.

Education

Bachelor's degree, Mechanical Engineering
  • at Jawaharlal Nehru Technological University
  • May 2010

Mechanical Engineering from Jawaharlal Nehru Technological University Hyderabad (A.P)with 1st Division in 2010.

High school or equivalent, B-Tech Mechanical Engineering
  • at Royal Institute of
  • April 2010
High school or equivalent, B-Tech Mechanical Engineering
  • at Jawaharlal Nehru Technological University
  • April 2010

Specialties & Skills

Equipment Installation
Mechanical Aptitude
Equipments
ENGINEERING
GRAPHIC DESIGN
LAYOUT DESIGN
PERSONNEL
CUSTOMER RELATIONS
MECHANICAL
OIL & GAS
COMMUNICATION SKILLS
MICROSOFT WORKS
COMMISSIONING

Languages

Arabic
Expert
English
Expert
Hindi
Expert
Urdu
Expert

Training and Certifications

ASNT LEVEL II (Certificate)
Date Attended:
March 2009
Valid Until:
October 2024
ISO 9001-2015 QMS (Training)
Training Institute:
CQI IRCA CERTIFIED
Date Attended:
December 2022
Duration:
36 hours

Hobbies

  • Reading a book
    I like to read a noble or some famous book