  • أشغل هذه الوظيفة منذ أكتوبر 2012

To execute non-destructive testing and provide technical assistance to Inspection Engineer in all activities related with static equipment in on-stream and during shutdown as per Risk Based Inspection (RBI) schedule in a safe and effective manner to ensure continuous functioning of all rotating equipment in the plant. To provide Corrosion monitoring and RBI services related to Piping / Static equipment’s.

Inspection Technical Assistant. في Abu Dhabi Gas Industries (GASCO)
  • الإمارات العربية المتحدة - أبو ظبي
  • ديسمبر 2007 إلى سبتمبر 2012

• Update the Inspection History following with Risk & Reliability Management (RRM) and Inspection Data Management System (IDMS) for the plant.
• Reviewing the test details of PSV’s & TSV’S and updating the results in related software for the plant (MAXIMO).
• Establishing Preventive Maintenance program by using software for the plant (MAXIMO).
• Dividing the corrosion loop based on the P&ID’s, Isometric Drawings and RRM software using the plant by SHELL.
• Keeping the all inspection reports softcopy in Inspection Data Management System \[IDMS\] and Hardcopy as per requirement of ISO-9001-2008.
• Prepare & Update Inspection History to Inspection Data Management System (IDMS) including NDT Status and review.
• Offer for NDT by Subcontractor and review NDT Reports/ RT & sign off.
• Final Mechanical Completion Inspection & clearance prior to PWHT/Hydro test/ Despatch.
• Initiate timely corrective action and preventive actions on NCR/CAPA/customer complaints.
• Preparation of Inspection Work Sheet (IWS) and follow up the status.

Senior Engineer (Quality Control & Welding) في U.B.ENGINERING LIMITED
  • الهند
  • يوليو 2007 إلى ديسمبر 2007

• Establishing Welding Procedure Specification (WPS), Procedure Qualification Records (PQR), and Welder Qualification Tests (WQT) as per the requirement of project.
• Responsible to prepare Quality Report on completion of work. To achieve this day to day quality records maintaining such as Weld Map, NDE Inspection Reports, Material Certificates, Repair Status, Fit-up & Welding Inspection Reports.
• Responsible for In-house Calibration for measuring equipments in Department and keep track for validity and liaison with outside calibration companies.
• Interpretation of Radiographs, Weld Rectification, Advice the methods for Radiographic Technique to produce better quality radiographs.
• Responsible for Material Receiving Inspection, preparation of non-conformity reports for non compliance item. Supplier evaluation and new supplier evaluation.
• Inspection of the verticality of columns for boiler drum used by theodolite.
• Checking the ground level, grouting, column basin, and bench mark used by Level Instrument.
• Done Etching test by using HCL for the Welder Qualification Test.
• Done the mechanical surveys as per the requirement for the plant.
• Inspection of the incoming welding electrodes by the approved supplier and keep all records related to the welding electrodes and the supplier.

QA/QC Engineer في Asianic Engineering Corporation
  • كينيا
  • مارس 2006 إلى أغسطس 2006

• In Process Inspection such as fabrication fit-up Inspection, Welding Inspection, Dimensional Checking & Painting Inspection, Etc…
• Product final Inspection and Release for Execution.
• Responsible for Material Receiving Inspection and transporting the required material to the site from the material yard.
• Keeping the Quality records and Quality plan as a soft copy and hard copy.
• All in-charge in Electro Static Precipitator as designed by FFE USA and FLS-Midth Denmark, FFE Rolling mill, Rotating equipments, and Transfer Towers.
• Fabrication, Execution and Verticality checking of Transfer Towers (T.T) with the help of Theodolite.
• Alignment of Heavy Rolling mills with the help of Millwright Fitters, which designed only for Magadi Soda Pure Ash Project Kenya.
• Inspection of heavy rolling mills and motors with dial gauges by Millwright fitters.
• Preparing the daily progress report and monthly report for submission to the client (L&T) and customer (MSCL).

Welding Engineer في Karpara Project Engineering Private Ltd
  • الهند
  • ديسمبر 2004 إلى أكتوبر 2005

• Visual Inspection and NDT(RT & DPT)
• Assisting the execution Engineer with the help of P&ID, GAD and Isometric Drawings in special Electro Static Precipitator designed for Thermal Power plant (ESP) 2 X 500 MW.
• Preparation list of required materials to the site by using the software of BHEL.
• Responsible for Material Receiving Inspection and transporting the required material to the site from the material yard.
• Preparing the daily progress report and monthly report for submission to the client (BHEL) and customer (NTPC).
• Welding in-charge in Electro Static Precipitator \[ESP\].
• Keeping the Quality records and Quality plan as a soft copy and hard copy.

Junior Quality Engineer في Sunil Hi-Tech Engineers Private Ltd
  • الهند
  • ديسمبر 2002 إلى يوليو 2004

• Visual Inspection and NDT(RT & DPT)
• Assisting the execution Engineer with the help of P&ID, GAD and Isometric Drawings in special Electro Static Precipitator designed for Thermal Power plant (ESP) 2 X 500 MW.
• Preparation list of required materials to the site by using the software of BHEL.
• Responsible for Material Receiving Inspection and transporting the required material to the site from the material yard.
• Preparing the daily progress report and monthly report for submission to the client (BHEL) and customer (NTPC).
• Welding in-charge in Electro Static Precipitator \[ESP\].
• Keeping the Quality records and Quality plan as a soft copy and hard copy.
Magadi Soda Pure Ash Project.Magadi- KENYA

الخلفية التعليمية

بكالوريوس, AWS-CWI
  • في IQC Training & Services PVT Ltd
  • أبريل 2010

 API - 1104  Welding Engineering o SMAW / GTAW / SW / SAW / FCAW / OFW / GMAW / ESW / EGW / RW / LBW / EBW / PAW / Thermal Cutting & Mechanical Cutting / Brazing / Soldering / Thermal Spraying & Symbols.  NDT o VT / UT / RT / MT / PT / LT / ET  Practical session

بكالوريوس, Post Diploma in NDT & Quality Management
  • في Kalva Engineering Private Limited
  • يونيو 2007

 Dye Penetrant Test. [DPT ]  Radiographic Test. [RT]  Magnetic Particle Test. [MPI]  Ultrasonic Test. [UT]

بكالوريوس, Post Diploma in Project Engineering & Quality Control
  • في Induscan Petroleum Institute
  • نوفمبر 2002

 Construction Materials (ASME section II A, B & C)  Project Engineering & drawings (P&ID , GAD, Isometric)  Welding Procedure Qualification & Welders Qualification Test  Radiographic Interpretation  Dye Penetrant Test  Magnetic Particle Test  Ultrasonic Test  Familiar with ASME Sec II,V,VIII & IX  Familiar with A.P.I.1104

دبلوم, Mechanical Engineering
  • في SSM POLYTECHNIC,
  • أبريل 2002

Diploma in Mechanical Engineering 3 year course

الثانوية العامة أو ما يعادلها, SSLC
  • في Islamic Residential High School
  • مارس 1999

Specialties & Skills

Microsoft Word
MS-Access
Microsoft Excel
Auto CAD

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس
الملايام
متمرّس
التاميلية
متمرّس
العربية
متوسط

التدريب و الشهادات

ASNT – N D T - Level II in UT, DPT, MPT. (الشهادة)
تاريخ الدورة:
May 2007
صالحة لغاية:
June 2007
Project Engineering & Quality Control (الشهادة)
تاريخ الدورة:
May 2002
صالحة لغاية:
November 2002
ASNT – N D T ¬- Level II in UT, DPT, MPT (الشهادة)
تاريخ الدورة:
July 2007
صالحة لغاية:
July 2013
AWS-CAWI (الشهادة)
تاريخ الدورة:
April 2010
صالحة لغاية:
May 2013
ASNT – N D T - Level II in RT (الشهادة)
تاريخ الدورة:
November 2002
صالحة لغاية:
November 2016