Associate MEP
Buro Happold Engineering
Total years of experience :19 years, 0 Months
• My role is a Project Leader and single point of contact for all client communications. Leading team of MEP engineers and technicians.
• Writing concept design report, scheme design and preliminary engineering solutions for Detailed Design including calculations, equipment selection, space planning, schematics and signing off approved from client, this includes for co-ordination with other stake holders.
• Designing and detailing of infrastructure for electrical & ELV services for cities projects.
• Writing Technical Specifications and Bill of Materials
• Preparation and Evaluation of Tender Documents on behalf of client
• Attend site co-ordination meeting, technical meeting and carry out joint inspection with the client’s representative for the approval of the material sample submitted by the Contractor, review of shop drawings, Monitoring Quality Checks for site works in accordance with the specifications, drawings.
• Provide Value Engineering for the project with cost implications, Peer review of the design works.
• Organize technical and financial proposals for new works.
• Ensure on-time, on-cost and quality delivery of projects while working in close coordination with other departments.
• Review and monitor work done by the sub-consultants.
• Maintain an overview of the project team’s workload and commitments in order to successfully meet deadlines and balance resource utilization
• Monitor financial performance of jobs, with the setting up and managing of job/project administrative systems, including planning and monitoring job resourcing/expenditure.
• Active participation in discipline development by conducting seminars/presentations.
• Active participation in mentoring team for digital, computational engineering scripting for increase efficiency and correctness of the quality product.
• As a Senior Electrical Engineer, my role was job leader. Being job leader I was responsible for preparing Concept design to detail engineering design report and signing-off from client,
• The work includes designing of electrical services that includes preparation of various calculations, equipment selection, space planning, sketches, schematics and layouts for Lighting, Small Power, Containment, Lightning Protection, Earthing System, Fire Alarm System, Telephone and Data system, Access Control and Security Surveillance System.
• Prepare Bill of Materials and Schedules in accordance with the design standards and as per procurement strategy.
• Preparation and Evaluation of Tender Documents on behalf of client, Pre-qualification of the contractor, Assist client in finalizing contractors, Issue construction drawings at site during construction phase, co-ordination with MEP and Structural Engineers.
• Reviewing and checking shop drawings and materials submittals, Response to the RFI’s submitted by the contractor, Attend site co-ordination meeting, technical meeting and carry out joint inspection with the client’s representative for the approval of the material sample submitted by the Contractor, Monitoring Quality Checks for site works in accordance with the specifications, drawings.
• Site survey during pre-construction stage, Prepare survey report and identify client with challenges to achieve the goals, Prepare project briefs to provide directions for the sub-consultants, Review and monitor work done by the sub-consultants, Provide Value Engineering for the project with cost implications, Peer review of the design works. External Infrastructure works that includes master planning of the services.
• Excellent project management Skills, Team Leadership Skills, Leading team of engineers and technicians, Ability to demonstrate the project and deliver project within stipulated time frame, Resource forecasting with respect to project milestone scheduling, Conduct Technical Forum for local office.
As a Deputy Manager, my role was to work closely with MEP leader and assist in preparing
• Concept Design to Detailed Design Report with approved scheme,
• Calculations, Sketches, Schematics, Block Diagrams, Single Line Diagrams, Space Planning, Equipment Selection and layouts for Lighting, Small Power, Containment, Lightning Protection, Earthing System, Fire Alarm System, Telephone and Data system, Access Control and Security Surveillance System.
• Bill of Materials, schedules in accordance with the design standards and the procurement strategy. Writing scope of work for MEP services,
• Construction drawings preparation in co-ordination with other stake holders.
• Reviewing and checking shop drawings and materials submittals, Response to the various RFI’s submitted by the contractor, Attend site meeting, technical meeting and carry out joint inspection with the client’s representative for the approval of the material sample submitted by the Contractor, Monitoring Quality Checks for the design documents, site works in accordance with the specifications, drawings.
As a senior project engineer, my role was to work closely with MEP leader and assist in preparing
• Calculations, Sketches, Schematics, Block Diagrams, Single Line Diagrams, Space Planning, Equipment Selection and layouts for Lighting, Small Power, Containment, Lightning Protection, Earthing System, Fire Alarm System, Telephone and Data system, Access Control and Security Surveillance System.
• Bill of Materials, schedules in accordance with the design standards and the procurement strategy. Writing scope of work for MEP services,
• Reviewing and checking shop drawings and materials submittals, Response to the various RFI’s submitted by the contractor, Attend site meeting