عمرو فايق, QA/QC Manager

عمرو فايق

QA/QC Manager

Al Shafar General contracting

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, •Bachelor Degree in Engineering….May, 2001
الخبرات
20 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 6 أشهر

QA/QC Manager في Al Shafar General contracting
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ سبتمبر 2015

1.Responsible for all aspects of the project related to quality assurance and quality control, and the overall implementation of the Quality Management System at site.
2.Reports to the corporate project manager Director
3.Monitoring the implementation of the ISO 90001:2008 quality manual all over company, Project Specific Quality Plan, Method Statements, Quality Control Procedures, Inspection & Test Plans, Quality Control Checklists through a program of quality audits and project surveillance
4.Establish and complete a monthly QA/QC Management report.
5. Responsible for reviewing the project audit reports and ensuring that corrective and preventive actions are completed in a timely manner.
6.Completion of necessary documentation to verify the works performed as per quality procedure.
7.Ensuring that inspection requests are implemented and relevant logs maintained.
8.Ensuring that all test reports are verified to meet the contract requirements.
9.Issue of Non Conformance Reports and the necessary follow-up.
10.Responsible for overseeing/audits of Subcontractor Quality Management systems.
11.Ensuring that all test reports are verified to meet the contract requirements.
12.Conducting Toolbox Talk.
13.Effective inspection and testing in accordance with ITP as defined. .
advice subordinates on missing wastage/r-work, and proper care of tools / equipment.
14.Prepare Risk Activity Register for the Project Activity to reduce rework
15. Conducting Weekly Coordination Meeting with All related Stakeholders
16. Prepare Project Close out Plan and necessary Handing Over Summaries
17. Prepare Closing out Reports of the project including all required documents to be submitted to the Client
18. Handing over Project Handing Over Documents such as (Asset Registers, As-Built Drawings, O&M Manuals, Warranties, T&C Reports, Authorities Approvals, Project required tests)

QA/QC Manager في Omis Contracting Co.
  • الإمارات العربية المتحدة - دبي
  • ديسمبر 2013 إلى أغسطس 2015

1.Responsible for all aspects of the project related to quality assurance and quality control, and the overall implementation of the Quality Management System at site.
2.Reports to the corporate project manager Director
3.Monitoring the implementation of the ISO 90001:2008 quality manual all over company, Project Specific Quality Plan, Method Statements, Quality Control Procedures, Inspection & Test Plans, Quality Control Checklists through a program of quality audits and project surveillance
4.Establish and complete a monthly QA/QC Management report.
5. Responsible for reviewing the project audit reports and ensuring that corrective and preventive actions are completed in a timely manner.
6.Completion of necessary documentation to verify the works performed as per quality procedure.
7.Ensuring that inspection requests are implemented and relevant logs maintained.
8.Ensuring that all test reports are verified to meet the contract requirements.
9.Issue of Non Conformance Reports and the necessary follow-up.
10.Responsible for overseeing/audits of Subcontractor Quality Management systems.
11.Ensuring that all test reports are verified to meet the contract requirements.
12.Conducting Toolbox Talk.
13.Effective inspection and testing in accordance with ITP as defined. .
advice subordinates on missing wastage/r-work, and proper care of tools / equipment.

Senior QA/QC Engineer في Mivan-Limited
  • مصر - القاهرة
  • أغسطس 2010 إلى ديسمبر 2013

1. Responsible for all aspects of the project related to quality assurance and quality control, and the overall implementation of the Quality Management System at site.
2. Implementation of the Project Specific Quality Plan, Method Statements, Quality Control Procedures, Inspection & Test Plans, Quality Control Checklists.
3. Controlling all inspection activities at site - receiving (for permanent works items), in-process, final and off-site inspection activities.
4. Completion of necessary documentation to verify the works performed.
5. Ensuring that inspection requests are implemented and relevant logs maintained.
6. Ensuring that all test reports are verified to meet the contract requirements.
7. Issue of Non Conformance Reports and the necessary follow-up.
8. Responsible for overseeing/audits of Subcontractor Quality Management systems.
9. Ensuring that all test reports are verified to meet the contract requirements.
10. Conducting Toolbox Talk.
11. Effective inspection and testing in accordance with ITP as defined. .
12. Advice subordinates on missing wastage/r-work, and proper care of tools / equipments.

Senior QA/QC Engineer في Orascom construction Industries
  • الجزائر
  • أغسطس 2009 إلى يوليو 2010

All Quality aspects

Senior QA/QC Engineer في al shafar general contracting
  • الإمارات العربية المتحدة - دبي
  • أغسطس 2008 إلى أبريل 2009

All Quality aspects works

QA/QC Engineer في M/s Higgs & Hill LLC, Royal BAM group Dubai
  • الإمارات العربية المتحدة - دبي
  • مارس 2007 إلى يوليو 2008

1.Ensure the necessary quality control over measuring and monitoring.
2.Effective inspection and testing in accordance with ITP as defined.
3.Input towards, awareness and implementation of the method statement.
4.Ensure the quality of the material / installation of work is in accordance with the acceptance criteria identified for the projects and the standers price, through supervision.
5.Advice subordinates on missing wastage/r-work, and proper care of tools / equipments.
6.Input towards rating the performance of project suppliers/subcontract (internal/external).
7.Effective control over quality records and quality documentation.
8.Awareness and effective handling client complaints.
9.Preparation of project specific quality plan.
10.Issue NCR’s noting time frame for rectification and monitor for clearance.
11.Arranging and witness different type of testing.
12.Conducting toolbox talk.

QA/QC Engineer في M/s AL Sahel Contracting Co. (an ISO – 9001:2000 company)
  • الإمارات العربية المتحدة - دبي
  • فبراير 2005 إلى فبراير 2007

1.Ensure the necessary quality control over measuring and monitoring.
2.Effective inspection and testing in accordance with ITP as defined.
3.Input towards, awareness and implementation of the method statement.
4.Ensure the quality of the material / installation of work is in accordance with the acceptance criteria identified for the projects and the standers price, through supervision.
5.Advice subordinates on missing wastage/r-work, and proper care of tools / equipments.
6.Input towards rating the performance of project suppliers/subcontract (internal/external).
7.Effective control over quality records and quality documentation.
8.Awareness and effective handling client complaints.
9.ISO documentation work, check lists and internal audits.
10.Preparation of project specific quality plan.
11.Issue NCR’s noting time frame for rectification and monitor for clearance.
12.Arranging and witness different type of testing.
13.Conducting toolbox talking.

Site Engineer في Amigo Real State
  • مصر - القاهرة
  • يوليو 2004 إلى ديسمبر 2006

1.Ensure work done as per the client specification
2.Put time frame for the executing work
3.Dealing with consultant and witness the inspection
4.Control over subcontractor work
5.Review the shop drawing
6.Prepare the bills for subcontractor

Site Engineer في M/s Vestas Wind System (Danish Co.)
  • مصر
  • مايو 2002 إلى فبراير 2003

1.Effective communication as defined.
2.Ensure that the project mobilization effort as planned also the project close out.
3.Electromechanical coordinate as defined.
Timely marking up of “for construction” and “As built Drawings” preparation.
4.Effective inspection and testing
5.Input, awareness and implementation of Project Specification
6.Prepare day work details where relevant.
7.Effective management and control of subcontractors and advice for minimizing /re-work, and care of tools.
8.Effective and timely requisitioning for the material and services required.
9.Input towards rating the performance of project suppliers and subcontractors.
10.Ensure that the quality of material and installation of work is in accordance with the project acceptance criteria identified and standard practice, through proper supervision.
11.Ensure that the necessary technical information is conveyed clearly to site foremen and details produced such as (shop drawing, sketches, etc.)

الخلفية التعليمية

بكالوريوس, •Bachelor Degree in Engineering….May, 2001
  • في Faculty of Engineering – Civil Department – Public works Sec. AIN SHAMS University …. Cairo
  • يونيو 2001

Specialties & Skills

Installation
Inspection
Mobilization
Testing
Quantitive Analisys
Word W7
Internet Access etc
. Advanced Windows 7,
, Power point

اللغات

الانجليزية
متمرّس
العربية
اللغة الأم

العضويات

Egyption Engineering Cyndicate
  • Civil Engineer
  • November 2001

التدريب و الشهادات

PMP Certifecate (الشهادة)
تاريخ الدورة:
February 2012
صالحة لغاية:
September 2012

الهوايات

  • Reading,Swimming ,Travelling,Safari