amr fayek, QA/QC Manager

amr fayek

QA/QC Manager

Al Shafar General contracting

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, •Bachelor Degree in Engineering….May, 2001
Experience
20 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 4 Months

QA/QC Manager at Al Shafar General contracting
  • United Arab Emirates
  • My current job since September 2015

1.Responsible for all aspects of the project related to quality assurance and quality control, and the overall implementation of the Quality Management System at site.
2.Reports to the corporate project manager Director
3.Monitoring the implementation of the ISO 90001:2008 quality manual all over company, Project Specific Quality Plan, Method Statements, Quality Control Procedures, Inspection & Test Plans, Quality Control Checklists through a program of quality audits and project surveillance
4.Establish and complete a monthly QA/QC Management report.
5. Responsible for reviewing the project audit reports and ensuring that corrective and preventive actions are completed in a timely manner.
6.Completion of necessary documentation to verify the works performed as per quality procedure.
7.Ensuring that inspection requests are implemented and relevant logs maintained.
8.Ensuring that all test reports are verified to meet the contract requirements.
9.Issue of Non Conformance Reports and the necessary follow-up.
10.Responsible for overseeing/audits of Subcontractor Quality Management systems.
11.Ensuring that all test reports are verified to meet the contract requirements.
12.Conducting Toolbox Talk.
13.Effective inspection and testing in accordance with ITP as defined. .
advice subordinates on missing wastage/r-work, and proper care of tools / equipment.
14.Prepare Risk Activity Register for the Project Activity to reduce rework
15. Conducting Weekly Coordination Meeting with All related Stakeholders
16. Prepare Project Close out Plan and necessary Handing Over Summaries
17. Prepare Closing out Reports of the project including all required documents to be submitted to the Client
18. Handing over Project Handing Over Documents such as (Asset Registers, As-Built Drawings, O&M Manuals, Warranties, T&C Reports, Authorities Approvals, Project required tests)

QA/QC Manager at Omis Contracting Co.
  • United Arab Emirates - Dubai
  • December 2013 to August 2015

1.Responsible for all aspects of the project related to quality assurance and quality control, and the overall implementation of the Quality Management System at site.
2.Reports to the corporate project manager Director
3.Monitoring the implementation of the ISO 90001:2008 quality manual all over company, Project Specific Quality Plan, Method Statements, Quality Control Procedures, Inspection & Test Plans, Quality Control Checklists through a program of quality audits and project surveillance
4.Establish and complete a monthly QA/QC Management report.
5. Responsible for reviewing the project audit reports and ensuring that corrective and preventive actions are completed in a timely manner.
6.Completion of necessary documentation to verify the works performed as per quality procedure.
7.Ensuring that inspection requests are implemented and relevant logs maintained.
8.Ensuring that all test reports are verified to meet the contract requirements.
9.Issue of Non Conformance Reports and the necessary follow-up.
10.Responsible for overseeing/audits of Subcontractor Quality Management systems.
11.Ensuring that all test reports are verified to meet the contract requirements.
12.Conducting Toolbox Talk.
13.Effective inspection and testing in accordance with ITP as defined. .
advice subordinates on missing wastage/r-work, and proper care of tools / equipment.

Senior QA/QC Engineer at Mivan-Limited
  • Egypt - Cairo
  • August 2010 to December 2013

1. Responsible for all aspects of the project related to quality assurance and quality control, and the overall implementation of the Quality Management System at site.
2. Implementation of the Project Specific Quality Plan, Method Statements, Quality Control Procedures, Inspection & Test Plans, Quality Control Checklists.
3. Controlling all inspection activities at site - receiving (for permanent works items), in-process, final and off-site inspection activities.
4. Completion of necessary documentation to verify the works performed.
5. Ensuring that inspection requests are implemented and relevant logs maintained.
6. Ensuring that all test reports are verified to meet the contract requirements.
7. Issue of Non Conformance Reports and the necessary follow-up.
8. Responsible for overseeing/audits of Subcontractor Quality Management systems.
9. Ensuring that all test reports are verified to meet the contract requirements.
10. Conducting Toolbox Talk.
11. Effective inspection and testing in accordance with ITP as defined. .
12. Advice subordinates on missing wastage/r-work, and proper care of tools / equipments.

Senior QA/QC Engineer at Orascom construction Industries
  • Algeria
  • August 2009 to July 2010

All Quality aspects

Senior QA/QC Engineer at al shafar general contracting
  • United Arab Emirates - Dubai
  • August 2008 to April 2009

All Quality aspects works

QA/QC Engineer at M/s Higgs & Hill LLC, Royal BAM group Dubai
  • United Arab Emirates - Dubai
  • March 2007 to July 2008

1.Ensure the necessary quality control over measuring and monitoring.
2.Effective inspection and testing in accordance with ITP as defined.
3.Input towards, awareness and implementation of the method statement.
4.Ensure the quality of the material / installation of work is in accordance with the acceptance criteria identified for the projects and the standers price, through supervision.
5.Advice subordinates on missing wastage/r-work, and proper care of tools / equipments.
6.Input towards rating the performance of project suppliers/subcontract (internal/external).
7.Effective control over quality records and quality documentation.
8.Awareness and effective handling client complaints.
9.Preparation of project specific quality plan.
10.Issue NCR’s noting time frame for rectification and monitor for clearance.
11.Arranging and witness different type of testing.
12.Conducting toolbox talk.

QA/QC Engineer at M/s AL Sahel Contracting Co. (an ISO – 9001:2000 company)
  • United Arab Emirates - Dubai
  • February 2005 to February 2007

1.Ensure the necessary quality control over measuring and monitoring.
2.Effective inspection and testing in accordance with ITP as defined.
3.Input towards, awareness and implementation of the method statement.
4.Ensure the quality of the material / installation of work is in accordance with the acceptance criteria identified for the projects and the standers price, through supervision.
5.Advice subordinates on missing wastage/r-work, and proper care of tools / equipments.
6.Input towards rating the performance of project suppliers/subcontract (internal/external).
7.Effective control over quality records and quality documentation.
8.Awareness and effective handling client complaints.
9.ISO documentation work, check lists and internal audits.
10.Preparation of project specific quality plan.
11.Issue NCR’s noting time frame for rectification and monitor for clearance.
12.Arranging and witness different type of testing.
13.Conducting toolbox talking.

Site Engineer at Amigo Real State
  • Egypt - Cairo
  • July 2004 to December 2006

1.Ensure work done as per the client specification
2.Put time frame for the executing work
3.Dealing with consultant and witness the inspection
4.Control over subcontractor work
5.Review the shop drawing
6.Prepare the bills for subcontractor

Site Engineer at M/s Vestas Wind System (Danish Co.)
  • Egypt
  • May 2002 to February 2003

1.Effective communication as defined.
2.Ensure that the project mobilization effort as planned also the project close out.
3.Electromechanical coordinate as defined.
Timely marking up of “for construction” and “As built Drawings” preparation.
4.Effective inspection and testing
5.Input, awareness and implementation of Project Specification
6.Prepare day work details where relevant.
7.Effective management and control of subcontractors and advice for minimizing /re-work, and care of tools.
8.Effective and timely requisitioning for the material and services required.
9.Input towards rating the performance of project suppliers and subcontractors.
10.Ensure that the quality of material and installation of work is in accordance with the project acceptance criteria identified and standard practice, through proper supervision.
11.Ensure that the necessary technical information is conveyed clearly to site foremen and details produced such as (shop drawing, sketches, etc.)

Education

Bachelor's degree, •Bachelor Degree in Engineering….May, 2001
  • at Faculty of Engineering – Civil Department – Public works Sec. AIN SHAMS University …. Cairo
  • June 2001

Specialties & Skills

Installation
Inspection
Mobilization
Testing
Quantitive Analisys
Word W7
Internet Access etc
. Advanced Windows 7,
, Power point

Languages

English
Expert
Arabic
Native Speaker

Memberships

Egyption Engineering Cyndicate
  • Civil Engineer
  • November 2001

Training and Certifications

PMP Certifecate (Certificate)
Date Attended:
February 2012
Valid Until:
September 2012

Hobbies

  • Reading,Swimming ,Travelling,Safari