Civil Engineer at Duffy Consulting Engineers
  • Qatar - Doha
  • My current job since September 2015

Civil Engineer at Duffy Consulting Engineers-Qatar Office, works on;
1. Traffic Diversion Plan (TDP): Industrial Area Package 6
-Traffic Diversion and Management Plans for a 65m corridor Al Kassarat St and neighboring streets to allow the construction of the proposed new road layout. This includes planning, design and producing CAD drawings of Static and Enabling Works in accordance to Qatar Traffic Control Manual (QTCM), Qatar Highway Design Manual (QHDM) and Qatar Work Zone Traffic Management Guide (QWZTMG).
2. TDP: Pearl Roundabout and Wahda Southlink
-Road Vertical Design, 3D modelling and preparation of civil design drawings of the proposed traffic
road diversion stage 8-2 using AutoCAD Civil 3D that will be placed for 6 months to facilitate the
construction of the Lusail Expressway
3. TDP: Al Shamal Road N8 Intersection
-Traffic Diversion and Management Plans at N8 Intersection of Al Shamal Road to facilitate the installation of Flyover and Gantries. This includes planning, design and producing CAD drawings of Static and Enabling Works in accordance to QTCM, QHDM and QWZTMG.
4. TDP: Junction 1 Al Shamal Road
-Static and Enabling Traffic Diversion and Management Plans at Junction 1 of Al Shamal Road to allow the construction of the bridge (Phase 1 and 2) in accordance to QTCM, QHDM and QWZTMG.
5. TDP: Wakrah Bypass Road
-Static Traffic Diversion and Management Plans along Al Mukair to facilitate the construction of Junction IC 11 of the Proposed Wakrah Bypass Road. This includes Horizontal Road Alignment detailed design, Traffic Management Planning and producing CAD drawings in accordance to QTCM, QHDM and QWZTMG.
6. TDP: Khalifa Stadium Energy Center Project
-Enabling and Static Traffic Diversion and Management Plans along Al Buwairda Street to facilitate the construction of pedestrian tunnel and installation of large cooling pipes servicing Khalifa Stadium that will be placed for almost 6months. This includes Horizontal Road Alignment detailed design, Traffic Management Planning and producing CAD drawings in accordance to QTCM, QHDM and QWZTMG.
7. Road Safety Audit: Al Kheesa North and East Package 03 Detailed Design
-Identifying possible issues and problems for Drainage and Street Lighting that is needed to be addressed by the designer
8. Traffic Modelling: Al Shamal Road
-Modelling and analysis of yield junctions and roundabout located at N24, N32 and N79 Intersections of Al Shamal Road using SIDRA Intersecions 6.1

Assistant Engineer at Hyder Consulting Middle East Limited
  • Philippines
  • November 2013 to July 2015

Projects handled,
1. West Kowloon Cultural District, HongKong
-Modeling of underground dry utilities and structures using AutoCAD Civil 3d and ensure that the minimum vertical clearance between pipes are followed.
Package 26 Major Roads Northwest of Al Dafna, Doha Expressways Project
Ministry of Municipality and Urban Planning, Qatar
-Modeling of underground dry and wet utilities and structures using AutoCAD Civil 3d and ensure that the minimum vertical clearance between pipes are followed.
-Checking pipe clashes of all underground utilities and structures using Navisworks Manage and AutoCAD Civil 3d.
2. P25 Al Khor Expressway and Al Khor to Umm Birkah Road, North-east Qatar
Ministry of Municipality and Urban Planning, Qatar
-Part of the team designing shared use pedestrian/cycle track including 3D modeling.
-Modeling of underground dry utilities and structures using AutoCAD Civil 3d and ensure that the minimum vertical clearance between pipes are followed.
-Checking pipe clashes of all underground utilities and structures using Navisworks Manage and AutoCAD Civil 3d.
3. Package 25-Junction5A - Al Khor Expressway
Ministry of Municipality and Urban Planning, Qatar
-Modeling of underground dry utilities and structures using AutoCAD Civil 3d and ensure that the minimum vertical clearance between pipes are followed.
-Generating cross-sections at every 50m interval using AutoCAD Civil 3d.
-Check and deliver markups to the CAD team on a timely basis.
4. Edmondson Park South, 25.67 has Residential subdivision
New South Wales, Australia
-Lay-out of engineering utilities (sewer, potable water and recycled water) for Development Application.
-Design of Sewerage System using 12d Model for Stage 1 and 2 in accordance of Sewerage Code of Australia for Construction Certificate.
-Deliver mark ups to the CAD team on a timely basis and ensures that all documents returned from the CAD team are thoroughly checked for correctness.
5. Rouse Hill Residential Stages 3 and 4, 8.24 has Residential Subdivision
New South Wales, Australia
-Lay-out of engineering utilities (sewer, potable water and recycled water) for Development Application.
-Design of Sewerage System using 12d Model in accordance of Sewerage Code of Australia for Construction Certificate.
-Design of Water Distribution System in accordance of the Water Code of Australia for Construction Certificate.
-Deliver mark ups to the CAD team on a timely basis and ensures that all documents returned from the CAD team are thoroughly checked for correctness.
6. Richmond Road Stages 3, 4 and 5, 14.06 has Residential Expansion of the existing Richmond Residential Subdivision
-Design of Drainage System using Drains software and 12D Model in accordance of the Company System and the local city council.
-Preparation of calculations, scheme evaluations and design reports.
-Analysis of flow control from the proposed development to existing waterways.
-Deliver mark ups to the CAD team on a timely basis and ensures that all documents returned from the CAD team are thoroughly checked for correctness.

Jr Civil Design Engineer at OGER Philippines
  • Philippines
  • June 2013 to November 2013

1. 680 has Saudi Arabian National Guard (SANG) Housing Project
Khashm, Al-Aan, Riyadh, KSA
-Responsible in producing as-built plans and shop drawings of road works, parking and pavement marking.
-In charge of producing a more detailed drawings of road works and pavement markings based on the comments given by Oger International before issuance of construction drawings.
-Assisting the Lead Engineer in checking the drawings submitted by the consultant if design manual and guidelines were followed before handing the drawings to the Unit Head.
2. 0.85 has King Abdullah Project 1 (KAP-01)-Site 185
Ministry of Interior, Riyadh, KSA
-Responsible in the hydraulic calculations of sewage network of the proposed development.
-Checking underground pipe clashes using Civil 3D pipe network tool.
3. 32.7 has King Abdullah Project 1 (KAP-01)-Site 302
Ministry of Interior, Riyadh, KSA
-Responsible in the revised hydraulic calculations of sewage collection system based on the revised network.
-Assisting the Lead Engineer in the calculations of water distribution system.
4. 3.2 has King Abdullah Project 1 (KAP-01)-Site 302
Ministry of Interior, Riyadh, KSA
-Creating preliminary and final grading plan of the proposed development.

Civil Design Engineer at Makati Development Corporation
  • Philippines
  • April 2011 to June 2013

•Preparation of preliminary and final site grading plan.
•Design of roads, surface parking and preparation of road sections.
•Analysis and design of storm drainage system.
•Analysis and design of water distribution and sewage collection system.
•Lay-out of engineering utilities (drainage, water and sewer system).
•Analysis of topographic map to understand the natural drainage patterns.
•Preparation of technical specifications.
•Identification of necessary utility easements on the given site development plan.
•Read technical due diligence reports such as flood study, existing site utility study, geotechnical study and water resources study to have a comprehensive understanding of the project given.
•Collects needed data from technical due diligence reports.
•Provide recommendations in various problems occurred based on actual site condition.
•Perform tasks in accordance with the processes defined in the company’s QEHS Manual.
Projects handled as Team Lead:
-UP-North Science and Technology Park 7.43 has Expansion (Bldg. K, L, M, N and O)
Expansion of Existing UP-Ayala Techno Hub
Commonwealth Ave, Diliman, Quezon City
-Harbor Point Terminal, Bus Terminal with Retail Shops
Subic, Olongapo City, Zambales
-Kasa Luntian, 3.87 has Leisure Residential Condominium Complex with Retail strip
National Highway, Tagaytay City
-UP-Town Center, 8.55 has Mixed-used Commercial Development
UP Campus, Diliman, Quezon City
-Daang Hari Retail, 5.42 has Commercial Area of Daang Hari-SLEX Link Road
Molino, Bacoor, Cavite
-Project A9, 8.42 has Mixed-Used Residential and Commercial Development
Angeles City, Pampanga
Projects handled as Team Support:
-13.6 has Bellavita Socialized Housing and Fiesta Bellavita (Commercial Area)
Brgy. Tapia, General Trias, Cavite
-Verdana Homes Asyana Phase 3 (4.54 has) and Phase 4 (5.95 has)
High-end Residential Subdivision
Talisay, Negros Occidental

Education

Bachelor's degree, Civil Engineering
  • at Saint Louis College, Lingsat, City of San Fernando La Union
  • March 2010

Specialties & Skills

AutoCAD
Roads and highways
Temporary Traffic Management
Drainage
3D Modeling
AutoCAD Civil 3D
UTILITIES (3D Modeling and Clash Analysis)
Navisworks Manage
Drainage
Land Development (Mixed Use Residential and Commercial Development)
Temporary Traffic Management
Traffic Modelling