Electrical Supervisor
IEPC
مجموع سنوات الخبرة :12 years, 10 أشهر
(1) INDUSTRIAL ELECTRICAL PROJECTS CO.(IEPC) Current working 7-12- 2019 started ELECTRICAL SUPERVISOR B&BMANAGE HOTEL COMPANY, SQC INTRNATIONAL CONSALTANCY, MYSK BY SHAZA HOTEL and AGILITY new WARE HOUSE 26K
● Responsible for operation and maintenance of electrical equipment’s system substation. Electrical trouble shooting as per oil field safety rules and work permit system.
● Maintenance of HT, LT Switchgears, Transformers, Motors and all other Electrical Equipment’s.
● Maintenance and troubleshooting of AC circuit for fire alarm panels.
● Knowledge about the Operation and maintenance of VCB breakers (11 KV).
● Knowledge about the Operation and maintenance of Oil Circuit Breakers, Air Circuit breakers (440V).
● Knowledge about maintenance of Power and Distribution Transformer11KV/3.3KV, 3.3KV/440V and 11 KV/440 V.
● Maintenance of Ingress protection lighting systems.
● Handling the activities like cable Laying, Glanding and Termination of power cables and Control cables.
● Handling the Installation, Wiring, Dressing and Termination of Distribution Boards.
● Handling the Testing and commissioning of Electrical Equipment’s.
● Knowledge of Ups and battery charger.
● Trouble shooting and maintenance of different types of MOV.
● Prepare and implement the maintenance routine schedule and keep the record.
● Maintain the daily maintenance activity record.
TECNICAS REUNIDAS (TR) TSHJV, Al Zour Refinery Project (EPC), KIPIC, KUWAIT; Electrical Supervisor and Work permit issuer AL ZOUR/EPC-055-A-MAIN PROCESS UNITS 23 AND 25) from 23-12-2018 TO 17-9-2019
Al Zour Refinery project. Unit 23 &25 electrical supervisor all electrical construction job handling PTO, HANDOVER, SUBSYSTEM PUNCH CLOSING all activity, KIPIC authorized work site permit issuer,
(3) GS: Engineering Construction KNPC clean fuel project (10.12.2016) KHARAFI NATIONAL, (12, 12, 2017) DONG YEONG ROLE: WORK PERMIT EXECUTER, ELECTRICAL SUPERVISOR - KNPC CLEAN FUELS PROJECT (JGSK, GS engineering construction)
clean fuel project KNPC This project electrical job first starting my supervision
. cathodic protection, deep well anode installation 50-meter unit 107, 137
. unit 25 shutdown activity full job field and m74 a substation electrical full job
(EXISTING SUBSTAION CRITICAL ACTIVICTY)
. clean fuel project main 11kv cable tray unit 107
. unit 144 electrical all activity
. unit 26 shutdown activity full job field and m74b substation electrical full job
. unit 12 substation all electrical activity and EICS (dong Yeong scope) . . OMCCR control room
. RCR control room
. RMP control room
. unit 39 all electrical activity
. unit 12 all electrical activity
. all tank aria cable pulling glanding mov DB installation. HV CABLE MV CABLE JOINT. KNPC 107 SUBSTATION TO UNIT 61 SUBSTATION AND UNIT 12
SUBSTATION ALL CABLE JOINTING ACTIVICTY 61/4 substation all ELECTRICAL AND EICS activity, and Feld all installation cathodic protection, lighting, HV and lv mv cable glanding, Termination pre- commissioning
Installation of low sulfur fuel oil FG and gas oil pipe line from MAA KNPC to Sibiya and Doha Power station, working as Electrical Work site Supervisor and KNPC direct executor from 01/05/2014 to 09/12/2015
. RM-35 Substation, FO Pump area, metering skid, Pig Launcher, tank area, Substations and control rooms.
. Major works are Heat racking of pipelines, installation of heating cable in pipelines, power kit isolator JBs, DBs, Cable trays, panel board installations, all earth works, Cad welding, Work co-ordination manpower distribution and controlling etc.…. I participate in tank area (live) tank 758, 759, 760, 761, 762 heat racking work without safety issues.
Working as an Electrical work site supervisor with Kharafi national at KNPC and KOC fuel and gas oil pipeline pumping station from min Ahmadi to mina al Zour and Shuaiba power station. Project EF 1760 started from 26-03-2012 to 30-04-2014.
RM-34 Substation and Pumping Station MFO area Pig Launcher
Work co-ordination, Manpower distribution, Material arranging, Material gate pass request making, Equipment safety certificate request making, and arranging KNPC authorized Confined space entrant and attend fire watcher, rigger. Installed Portable Sub stations, Transformer VSD panels, MCC panels and HT panels in RM-34 S/S. Arrangement of Cable trench excavation notification and Sub contractors are the responsibilities. The Project related substations are M71, M71A, M20, RM-35. Other related locations are control room, OMCCR, GPCCR, RMP, PLCR, SLCR, Fire station etc.…
Worked as an electrical Foreman from 25-04-2009 to 27-04-2010 at KNPC in EPC works of Fire and Gas detection Project
. Refinery all unit compressor related installation, Flame detector, Gas detector, Smoke detector, Heat detector, Manual call point, MOV s installation.
. Bitumen area to FUP control room main pipe rack cable trench excavation, cable laying, all compressor area JB, JB frame, cable tray installation, Gland termination etc.…….
Worked as an Electrical Foreman with Kharafi national in Low Pressure Polyethylene in Kuwait (LPK) plant, Olefins II Project in Shuaiba industrial area, Kuwait from July 2008 to April 2009 with M/s Kharafi National.
I participate the following works in new substation - EG -1
. All lighting works in vessel areas, reactor areas and Pipe rack
. Installation of cable tray supports JB, JB frame….
GOVERMENT OF KERALA; DEPARTMENT OF TECHNICAL EDUCATION CIRTIFICATE EXAMINATION IN ENGINEERING ELECTRICAL ENGINEERING