Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Anwar Basha, Designer

Anwar Basha

Designer·NAFFCO

United Arab Emirates

Bachelor's degree, Electrical Engineering

Work experience

Total years of experience: 16 years, 11 months

Designer

May 2016 - July 2018

NAFFCO

Abu Dhabi, United Arab Emirates

May 2016 - July 2018

1. System Architecture Developed.
2. List of Shop Drawings need to prepare.
3. BMS Schematic Drawings Developed.
4. BMS Design & Shop drawings Developed based on Specification.
5. BMS External Setting out plan Layout Developed.
6. BMS Riser Location & openings proposed and get it approval from Consultant.
7. Material take off.
8. Controllers Selection for DDC Panel based on Digital and Analog Input/Output Points.
9. Control Wiring Diagram need to be prepare based on data points schedule.
10. DDC Panel Wiring Diagram Developed.
11. DDC Panel Dimension Layout preparation for Panel manufacturing.
12. BMS Containment layout Developed.
13. BMS Shop Drawings submission to contractor/Consultant for an approval.
14. Site Inspection.
15. Variation Report need to prepare to claim variation from the contractor for additional points.
16. BMS As Built Drawings Developed as per Site Condition.

Company industry:
General Engineering Consultancy
Job role:
Design, Creative, and Arts

MEP Engineer

June 2012 - July 2014

ETA (Unistar)

Riyadh, Saudi Arabia

June 2012 - July 2014

List of Mega projects involved in ETA Saudi Arabia (K.S.A)
a. Hilton Hotel & Residential Tower (2B+Ground+20+Roof)
b. Hilton Hotel & Residential Tower (2B+Ground+13+Roof)
RESPONSIBILITIES
1. MEP shop drawing submission list development based on base line construction planning schedule
2. Finalizing Builders work layout for riser openings, (Before casting the floor slab).
3. Shop Drawing Submission for Consultant’s Approval & Supervision of Drawing Department.
4. Raising RFI to the consultant for insufficient riser opening sizes, and getting its re-approval.
5. Material Take off.
6. Collecting Quotations for materials from Different Manufacturers/Suppliers.
7. Gathering Material preparations submittal by the supplier and reviewing it with the specifications.
8. Monitoring the material selections to match based on specification and vendor list.
9. Forwarding Material Submittal to Consultant for approval.
10. Reviewing Material requests provided by supervisors/foreman and cross check with
Respective shop drawings for exact quantities.
11. Preparing Local Purchase order (LPO) for material.
12. Follow up with the manufacturer / Supplier to receive the material on time.
13. Monitoring the stock list in store. If necessary ordering the material in advance to avoid
Delay on site work.
14. Site Inspection. (Always monitoring the site to verify if they are using the current revision layout)
15. Monitoring and reporting on all operation and maintenance of Electrical and Mechanical services.
16. Finalizing MEP Coordination layouts for Site Installation.
17. Finalizing L.V. Room & Electrical room layout details for consultant / DEWA approval.
18. Updating the shop drawing based on coordination layout and issuing for construction.
19. Participating for discussions in the Design Meeting to sort out the MEP Design issues.
20. Raising Design changes request (DCR) for variation.(If require any changes in design drawing)
21. Sending Alternative proposal sketch to Consultant for approval as per site requirement.
22. Preparation of Variation reports.
23. Sending E-mails to sub-contractors for site coordination issues/delay.
24. Sending RFI & RTRFI to Consultant, Main Contractor and Sub-contractor for coordination issues.
25. Gathering Work Inspection Report (WIR) from the site Supervisors / foreman to prepare
As Built drawings.
26. Setting out plan for Elec. layout, Load schedule, Power SLD, to be finalized for DEWA approval.
27. Follow up Electrical & Mechanical Engineers to send Firefighting & Fire Alarm drawings
for Civil Defense approval.
28. Finalizing Drainage and water supply drawings for Dubai Municipality approval.
29. Final as Built drawing developed based on site installation and submitted to consultant.
30. Discussion with planning Engineer, Project Manager and Quantity Surveyor to extend the project
time and send Extension of time (EOT) to consultant to extend the project time for huge Changes and additional works.

Company industry:
Construction & Building
Job role:
Engineering

Engineering Coordinator

September 2007 - April 2012

Mega projects involved in BK Gulf L.L.C

Dubai, United Arab Emirates

September 2007 - April 2012

a. 4 Basements + Ground + 80 Floors High Rise Tower
b. New York University in Abu Dhabi (Design & Built Project )
RESPONSIBILITIES
1. Shop Drawing Preparation.
2. Sending RFI & RTRFI to Main contractor for Technical enquires.
3. Shop Drawings Submission for Consultant’s approval.
4. Supervision of Drawing Department.
5. To be discussed in the Design Meeting regarding the MEP services and sort out the issues.
6. RFI should be raise related to drawings. And should be chase to get reply, from the consultant.
7. To be prepared Alternative proposal in shop drawings for Design changes for coordination and
should be send to the Main Contractor & Consultant for approval (if necessary).
8. Site Inspection
9. If any changes in Architectural & structural and MEP Design drawings, need to be collect those
drawings from main contractor/consultant and to be upload in server.& Update shop drawings.
10. Dewa Approval
11. Technical Information to be gathered form the Respective services Engineers and
Forward to the draughtsman to produce shop drawings.
12. Follow up to the Electrical & Mech. Engineer’s to get Municipality & Civil Defense approval.
Name of the

Company industry:
General Engineering Consultancy
Job role:
Engineering

Electrical Designer

August 2005 - August 2007

Engineers Office

Dubai, United Arab Emirates

August 2005 - August 2007

List of some Prestigious Projects involved in Engineer’s Office in Dubai (U.A.E)
a. Sheik AL. Hamdan Palace.
b. Sheik AL. Maktoom Palace.
c. Sheik AL. Majid Villa.
RESPONSIBILITIES

1. Design drawing Developed for Lighting, Small Power, Fire Alarm, Emergency Lighting, Telephone & Electrical Containment Layouts.
2. Power Single Line Diagram.
3. DB Schedule.
4. Electrical Room Designing.
5. LV. Room Designing.
6. Transformer Room Designing.
7. HV & LV Trench Designing.
8. Tray & Trunking size Selection.
9. L.V Cable Selection.
10. Telephone layout, External Setting out plan & Telephone Schematic.
11. External Power Setting out plan & External Lighting Layout.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Assistant Design Coordinator

December 2002 - July 2005

AL Naboodah Engineering L.L.C

Dubai, United Arab Emirates

December 2002 - July 2005

1. Supervision of Drawing Department.
2. Shop Drawings Submission list to be prepare Based on construction Schedule.
3. MEP Drawings Preparation for consultant’s approval.
4. Approved MEP drawings need to be forward to Construction and keep the Records.
5. Coordination drawing developed for Site installation.
6. Electrical drawing need to send to DEWA for approval
7. Mechanical Drawings need to send to Municipality for approval.
8. Proposed RCP layout need to prepare to get Consultant Approval
9. List of Material need to arrange from approved Shop drawings to order Material.
10. Work inspection Report (WIR) need to collect for site supervisors and updated the changes
in As Build Drawings.

Company industry:
General Engineering Consultancy
Job role:
Administration

Electrical Draughtsman

November 1999 - November 2002

Ssangyong Engineering & Cons

United Arab Emirates

November 1999 - November 2002

1. Supervision of Drawing Department.
2. Shop Drawings Submission list to be prepare Based on construction Schedule.
3. MEP Drawings Preparation for consultant’s approval.
4. Approved MEP drawings need to be forward to Construction and keep the Records.
5. Coordination drawing developed for Site installation.
6. Electrical drawing need to send to DEWA for approval
7. Mechanical Drawings need to send to Municipality for approval.
8. Proposed RCP layout need to prepare to get Consultant Approval
9. List of Material need to arrange from approved Shop drawings to order Material.
10. Work inspection Report (WIR) need to collect for site supervisors and updated the changes
in As Build Drawings.
Name of the

Job role:
Engineering

Education

Rajastan vidyabeeth university

December 2018

December 2018

Bachelor's degree, Electrical Engineering

India

Educational Qualification :

Skills

CONSULTING

Expert

ENGINEERING

Expert

GRAPHIC DESIGN

Expert

PROPOSAL WRITING

Expert

RFI

Expert

SUPERVISORY SKILLS

Expert

MICROSOFT OFFICE

Expert

DISEñO DE LA DISPOSICIóN

Beginner

FINAL

Beginner

INDESIGN

Beginner