Electrical Engineer
Advanced Construction Technologies
Total years of experience :13 years, 7 Months
• Reviewing Design Drawings, Sub-contractor’s Shop drawings, Material submittals, Inspection Plans, Method of Statement, Material Delivery schedules to conform compliance with the requirements of project.
• Attends regular meetings with Client, Consultant, Sub Cons & prepare Minutes of Meeting
• Coordination, Planning, Estimation, Supervision, Installation and T&C of MEP system.
• Planning and determining resources to evaluate and estimate the team capabilities.
• Organizing, motivating and assign tasks to the team for smooth operations.
• Controlling time management to meet the realistic deadlines.
• Analyzing and managing project risk in early stage to minimize uncertainty.
• Planning, scheduling, coordinating, and executing the MEP works.
• Generally Responsible for implementation of all electrical works at site.
• Ensuring applicable codes, standards and specifications are followed properly throughout the project.
• Interact daily with the clients/consultants to interpret their needs and requirements.
• Perform overall quality control of the work and report regularly on project status.
• Testing and commissioning of panels
• Coordinate with design team to review the prepared documents and submittals as per the project/client requirements.
• Ensure Electrical works are carried out as per approved shop drawing and within the time frame and progress of the approved construction program.
• Preparation of material submittals method statements, inspection requests.
• Ensure all Construction (IFC) drawings, shop drawings, material submittals are with as project specification and complying local regulation such as QCS, Kahramaa, etc.,
• Liaise with the consultant/client/ QA/QC / Sub Contractors.
• Ensuring that all test reports are verified to meet the contract requirements.
Project: Msheireb Downtown, Phase 2
Gold rating under the internationally recognized LEED (Leadership in Energy and Environmental Design)
PMC: Time Qatar (Turner)
Consultant: CEG International / Gensler
Total Built-Up Area: 650, 346 m²/ Project Budget: QR 2.6 Billion
The mixed-use development will comprise 11 buildings, with a combination of commercial and residential properties, retail, cultural and entertainment areas.
Five star Hotel (Al wadi Hotel Doha M Gallery by Accor hotels features 213 rooms and suites), Residential, Mall, Cinema, Restaurant and Retail
The entire project features sustainable design that consumes fewer resources, generates less waste, costs less to operate, and achieves a reduced carbon footprint.
http://www.msheireb.com/en-us/projects/msheirebdowntowndoha.aspx
• Responsible to execute electrical works.
• Perform projects work and leadership in an efficient and professional manner.
• Organize the plant, manpower and site facilities to meet the agreed deadlines and schedules.
• Ensuring effective site management and discipline to ensure safe execution of the project.
• Responsible for the participation in the progress and coordination meetings.
• Co-ordinate with the higher officials to resolve the site issues.
• Study of drawings and execute the work.
• To check the entire work as according to approval drawings.
• Site additional work preparation.
• Updating the drawings depends on site condition.
Electrical