Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
asad ali, Factory Maintenance Manager

asad ali

Factory Maintenance Manager·FMCG

Saudi Arabia

Bachelor's degree, Project Management

Work experience

Total years of experience: 12 years, 3 months

Factory Maintenance Manager

November 2025 - Present

FMCG

Jeddah, Saudi Arabia

November 2025 - Present

• Spearheaded the deployment of a CMMS platform from the ground up — including full Preventive Maintenance
plan creation, equipment hierarchy setup, and spare parts mapping — transforming a reactive maintenance culture
into a structured, data-driven operation.
• Achieved a 25% increase in production output on high-volume lines by optimizing maintenance schedules, reducing
unplanned downtime, and ensuring equipment availability through disciplined spare parts management.
• Designed and implemented a comprehensive lubrication management program with interval-based scheduling,
equipment-specific lubricant mapping, and technician SOPs — directly reducing wear-induced failures and
extending component life cycles.
• Introduced a structured Breakdown Analysis framework; trained frontline technicians and supervisors on root cause
analysis tools, enabling trend identification and systematic elimination of recurring failures.
• Established maintenance KPIs including Machine Efficiency, MTBF, and MTTR; instituted Daily Operations
Reviews (DORs) and Weekly Operations Reviews (WORs) to drive accountability and a continuous improvement
culture.
• Developed and mentored a multi-shift maintenance team, fostering technical ownership, cross-functional
collaboration, and a safety-first mindset across all operations.

Company industry:
FMCG

Project Engineering Manager

January 2016 - Present

Nestle Pakistan

Lahore, Pakistan

January 2016 - Present

Accountable for end-to-end CAPEX submission, engineering design, site execution, and vertical start-up of capital
investment projects at Nestle Pakistans largest food manufacturing site. Ensured full compliance with hygienic design
standards, food safety regulations, and Nestles First Time Right commissioning philosophy.

Company industry:
FMCG

HOD – Operations Manager

January 2022 - October 2025

Nestle Pakistan – Sheikhupura Factory

Lahore, Pakistan

January 2022 - October 2025

• Pioneered the mechanized loading project for outbound vehicles — boosting loading labor productivity by 29% and
delivering annual labor cost savings of PKR 16 Million.
• Led a damage reduction initiative for bottle handling and transport trucks, cutting replacement expenditure by 10%
and improving product integrity across the supply chain.
• Designed and executed a multi-skilling cross-competency training program for operational staff, significantly
improving on-time dispatch rates, reducing employee overtime, and minimizing vehicle halting time.

Company industry:
FMCG

Maintenance & Improvement Manager

January 2019 - January 2022

Nestle Pakistan – Nestle Nutrition Plant

Lahore, Pakistan

January 2019 - January 2022

Managed end-to-end maintenance for processing plants and packaging lines with direct oversight of 35 technicians and
indirect leadership of 1 Automation Engineer and 12 Automation Technicians.

Company industry:
FMCG

Project Engineer

January 2016 - January 2016

Elite Engineering Pvt. Ltd. (GO Petroleum Group)

Lahore, Pakistan

January 2016 - January 2016

• Managed site execution for Sarai-Naurang Oil Storage Depot, preparing BOQs, scope-of-work documents,
execution plans, and detailed engineering drawings per API 650 standards.
• Led cross-functional site meetings, tracked project progress, and supported the Project Manager in critical
decision-making across civil, structural, and mechanical disciplines.

Company industry:
FMCG

Site Engineer

January 2014 - October 2015

Potential Engineer Pvt. Ltd.

Islamabad, Pakistan

January 2014 - October 2015

• Led execution of the 140KVA Double Circuit Neelum-Jehlum Transmission Line, supervising construction of 142
base foundations and erection of 70 towers in remote terrain of Azad Kashmir.
• Coordinated with HSE teams and government stakeholders to resolve conflicts and maintain project schedule;
achieved cost savings of PKR 4 Million through optimized heavy-equipment logistics.

Company industry:
General Engineering Consultancy

Education

Pakistan Institute of Management Sciences (PIMS)

January 2018

January 2018

Bachelor's degree, Project Management

Pakistan

University of Engineering & Technology (UET)

January 2014

January 2014

Bachelor's degree, Mechanical Engineering

Pakistan

Skills

COMPOSITE MATERIALS
Intermediate
COMPOSITE MATERIALS
Intermediate
KEY PERFORMANCE INDICATORS KPIS
Intermediate
KEY PERFORMANCE INDICATORS KPIS
Intermediate
MAINTENANCE ENGINEERING
Intermediate
MAINTENANCE ENGINEERING
Intermediate
MAINTENANCE SCHEDULING
Intermediate
MAINTENANCE SCHEDULING
Intermediate
MANAGEMENT
Intermediate
MANAGEMENT
Intermediate
MEAN TIME BETWEEN FAILURES
Intermediate
MEAN TIME BETWEEN FAILURES
Intermediate
OPERATIONAL EXCELLENCE
Intermediate
OPERATIONAL EXCELLENCE
Intermediate
PROCESS IMPROVEMENT
Intermediate
PROCESS IMPROVEMENT
Intermediate
RELIABILITY
Intermediate
RELIABILITY
Intermediate
REPAIRING MANUAL MECHANICAL
Intermediate
REPAIRING MANUAL MECHANICAL
Intermediate