Excutive project manager [+service] in sakr group consultant
Sakr group Rotana
Total years of experience :25 years, 11 Months
Follow up and organize the whole factory in terms of&Engineering
-Keeping the factory machinery and utilities in a good condition
-Carrying out the maintenance execution
-Planning the spare parts stock and keeping the store balance
-Arrange and manage the commissioning issue with other parties
-Manufacturing MUV (material Usage Variance) controlling with Finance Dept.
-New projects initiators
-Brands Twist, milkow, bashaeir for juis and milk
- Plant Manager In Faragalla Group 1998-2005
Tasks &responsibilities
Plant Manager in the Egyptian Co. for Advanced Foodstuff (Juice, Milk and Jam Factory)
Nature of the Business is producing all Juice &Milk product, fruit pulping
And Jams (Tetra pak, FBR, Elpo, SAG)
Brands, Yahoo, Faragello, Easy mosooo, Elprince, Mooooo
• Production plans to be taken place with shift leaders supervision
• Keeping the factory machinery and utilities in a good condition
• Carrying out the maintenance execution
• Planning the spare parts stock and keeping the store balance
• Arrange and manage the commissioning issue with other parties
• Budget
• Manufacturing MUV (material Usage Variance) controlling with Finance Dept.
• New projects initiators
Responsibilities
Managing Engineering Dept. and maintain the production lines in a good condition
• Burger forming machines, FORMAX 6, 12
• Beef Packing, TIROPAK, MULTIVAC
• Automatic filling machines, ELPACK200, 250
• Powder filling and mixers, ELPACK
• Ketchup filling, ELPACK
• Beef mincing and mixers, WOLFKING, SEYDELMANN
• Grinders both pneumatic and mechanical
• Smoking and cooking houses, ATMOS, VEMAG
• Fillers for Hot Dog and Frankfurter, HANDTMANN
• Hydraulic circuits and Pneumatic circuits in general.
1-Maintenance for Heavy Equipment
2-Maintenance for Central Mixers ARBOU40 and instalation
for it
3-Maintenance for Trucks such as Scania 111.112
4-Maintenance for FOSO
SAINTARY work in
1-seedy Basher Tabia buildings
2-El Mahrosa Hotel in Seedy Basher Tabia
3-Administration building for El-masbokat company in om zaghio
4-Seedy Kerir resort for El-bahreya
5-Civil work in SoMiD seaport including feeding lines for main lines for water
head response for cold rolling coordinator to organize between this part of company and other parts like main workshop and other parts
this for the best way to calculate every thing about low cost for production and best way to solve problem and design for machines to have best solution with low cost including repairing and manfacture