QAQC ELECTRICAL ENGINEER
voltas wll
Total years of experience :16 years, 5 Months
• Develop & maintain inspection procedure & the techniques, throughout the construction, pre-commissioning & commissioning stage.
• Maintain accurate and calibrated inspection tools & equipment for consistent measurements for operation of the inspection and testing system.
• Control product used in installation throughout inspection before leaving supplier or manufacturer’s premises and after reaches the site & throughout manufacturer’s test certificate, maintains files & document on supplied product.
• Report on daily inspection and testing activities.
• Prepare inspection request-IR and maintain inspection and testing record.
• Coordination with other staff members and other organization staff members regarding all QC matter.
• Prepare daily QC reports and perform other duties as assigned by QC Manager.
• Preparation of ATP for T&C. (Authority to proceed).
• Preparation of Quality related documents as per client’s requirement such as Quality control plan, ITP, Method statement and related work instructions and liaison with the client for the approvals.
• Monitoring the installation and testing of various panels
• Monitoring the installation and testing of Circuit breakers, Current transformers and Isolators as per the Quality plan.
• Provided technical support to solve quality problems in product development and manufacturing.
• Testing and maintenance of switchgear at site.
• Co-Ordination with Client for testing of Restricted earth fault relay for LV panels at site as per kahramaa rules and regulation.
• Calibration of Instruments
• Quality Control
1. Incoming Inspection
2. In-Process Inspection
3. Final Test and Inspection
4. Factory Acceptance Test if required (FAT)
5. Packing and Loading control
6. Prepare Inspection and test report
Preparation of layout for power, lighting system.
Prepare DB.-schedule, single line diagram for all electrical services.
Coordinate with mechanical services for related issues.
Preparing reports-daily, weekly, and monthly of consumed electrical products.
Operate conveyor system.
Position of all incoming materials register in log book and its maintenance records for inventory.
Maintaining accurate records of all electrical equipments.
Operate alternators, pumping system and associated control system.
Planning maintenance of machine.
Maintenance of batteries.
Enhancing the Transmission skills of the students with using practical tricks.
Developing new idea in student’s minds through site visiting at different locations in India.
Preparation of different type of projects related to electrical engineering.
Handling maintenance of High Transmission Line.
Had been installing transformer as per rating of the motor.
Developing new sources for procurement of project material.
Generating MIS reports based on the projects.
¬¬Conducting Vendor Education Program arranged as per company rules.
Giving guidelines, coordinating workers.
Planning of maintenance for lines preventive and breakdown maintenance.
Issuing material from store against material requisition slip approved by responsible person and for project materials requisition required with isometric drawing.
Survey of LT lines.
Maintenance of 11 KV feeders.
Erection of outdoor pole mounted substations.
Handling at least 10 persons on the site.
worked In electrical engg brach
Was accountable for
Monitoring and Guiding the Manufacturing Team at Factory.
Process Engineering support for productivity and quality.
Development of products as per marketing requirement and interaction with overseas source.