Azmi El Fakhouri, Deputy Project Director

Azmi El Fakhouri

Deputy Project Director

Saudi bin laden

Location
Saudi Arabia
Education
Bachelor's degree, architecture
Experience
44 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :44 years, 5 Months

Deputy Project Director at Saudi bin laden
  • Lebanon
  • My current job since September 2014

work as a Deputy Project Director and a Technical Director to construct Jeddah Tower known as Kingdom Tower which is the tallest tower in the world, located at Ubhor area, north of Jeddah-KSA.
complete construction with all fit outs and all MEP services and building enclosure.

project Director at Oger Liban
  • Lebanon - Beirut
  • January 2002 to September 2014

To design and supervise Mosque Mohamad al Al Amin In downtown Beirut.
To design and manage a donation project in North Lebanon containing seventeen schools and one cultural center and three health care centers and one gross vegetable retail market and two sports centers etc, ,

  • to January 2008

Saoufar residential complex-Saoufar -Lebanon-Design and
permit development.

  • to January 2006

Mosque on Mount Perigrenus-Tripoli, Lebanon (Architectural
competition -First Prize)
27 -2006-Touristic complex -Bequaa (Priliminary Design ).

  • to January 2006

Hadi Soubra Apt.Khaldeh-(Remodling and interior design and
construction works).

  • to January 2006

Ibrahim Afara Apt.-Rawche-( Remodling and interior design and
construction works).

  • to January 2006

Mr.Fouad Saad Apt-Rawche--( Remodling and interior design and
construction works).

  • to January 2006

Bachir Dimassi Villa -Kfarjara (Priliminary Design ).

  • to January 2006

Cooperation with A.C.I .Engineering office (Management
work).

  • to January 2006

Archieve for Hariri Foundation Office of Engineering
Studies.
34 -2006-Survey for the south of Lebanon villages.
35 -2007-Bella Fiesta Bldg. M.A.G.AlKhorafi group .Minet El Hosn
Beirut.(preliminary design and execution dwgs.and permit file.)
36-2007-Lekki Mosque --Nigeria. (execution drawings)
37-2007-Nipost bldg. - Nigeria. (preliminary design)
38-2007-Ilorin Jumaat Central mosque-Nigeria-Design development and
execution drawings.
39-2007-Al Sameriayah. Villa -Riyadh -KSA- Design development and
execution drawings.

Status Trainee at Tarabichy Consulting and Contracting Company – Beirut – Lebanon
  • January 1980 to January 2005

Involvement was the design and execution drawings, of many office buildings and villas and shopping centers in Jeddah and Riyadh - Saudi Arabia.

6- Year 1979, from 20/6/1979 to 30/11/197, design and execution drawings, studies, Consulting Team Office - Beirut - Lebanon, status trainee.
Involvement was the design and execution drawings, of Ali Bin Abi Taleb Mosque - Beirut - and many residential buildings in Beirut and Saudi Arabia.

7- Year 1978, from 20/6/1978 to 30/11/1977, interior design studies - Mr. Hisham Mouin Office - Beirut - Lebanon, Status trainee.
Involvement was the interior design and execution drawings of Banks in Beirut and its suburbs.

8- Year 1977, from 6/6/1977 to 30/11/1977, site experience - Quasim Airport - Arcode company - Quasim - Saudi Arabia - status trainee.
Involvement was the execution of VIP terminal, employee’s terminal and recreation facilities and the infra network.

9- Mr. Jamal Jaroudi Duplex Dawha - Lebanon

The project is to remodel an existing duplex and propose a new layout with full furniture and interior design and execution works.

Project duration: 12 months.


10- Mr. Kamel Abu Nasr Dawha - Lebanon

The project is to remodel an existing apartment and propose a new layout with decoration and furniture and execution works.


11- Prime minister Rafic Hariri Villa Faqra -Mount Lebanon

Contractor at L.I.U Saida Branch
  • to January 2005

Contracting Work, Stone cladding and restoration of existing façade

Project duration: 24 months.


15 -2004- Kallo Villa-Bhamdoun /Lebanon(Design and execution
Drawings)
16 -2003- Mutawa Villa-Beitmeri / Lebanon(Priliminary design)
17 -2004- Soubra Pent House / Chanay-Lebanon(Remodling and
supervision)
18 -2003-Al Ouzai Maquam / Beirut (Restoration works)
19 -2004- Nazih Hariri Villa -Bhamdoun/Lebanon(Preliminary
Design)
20 -2005-Soubra Pharmacy (Remodling desisgn and supervision)
21 -2005-Mrad Building -Tallet al Khayat (Design and execution
drawings)
22 -2005-Saida Evengelical school-Saida (Preliminary design )
23 -2004-Al Imam Al Shafiee Mosque-Beirut (Preliminary design)

Architect Designer and Coordinator at 21-Old City Of Saida Dispencery
  • January 2000 to January 2001

The project is to remodel and renovate an existing dispencery that is located in a historic building and furnish it with state of the art equipment and maintain the historical value of the building and site.

Project Duration: 4 months





22-Ain El Helwe Dispencery

Architect Designer and Coordinator at Saida- Lebanon
  • January 2000 to January 2001

the project is to remodel and renovate an existing two story building and add a new floor to accommodate the different functions of a central dispencery that will work with other dispenceries in Saida and Beirut.

Project Duration: 8 months.



23-Bahaa Eddine Hariri Mosque(1999-Still on). Wastani-Lebanon

Architect Designer and Coordinator at Mr. Walid Hariri Residence
  • January 1996 to January 2001

Design and execution and supervision of a 2000 square meter residence with 3000 square meter soft and hard landscape.

Project Duration: 24 months

Architect Designer at 24-Presisdent Rafic Hariri Mosque
  • January 1999 to January 2001

The project consists of designing a congresstional mosque in
name of President Hariri on a prime land location at the
Southern entrance of Beirut.

Project Duration: 4 months.

Architect Designer at 25-Al Amine Mosque
  • January 1999 to January 2001

The project consists of designing a congresstional mosque at
The most prestigious place of down town Beirut, Martyrs square .


Project Duration: 6 months.

Architect Restaurer and Project Manager and Coordinator at 18- Great Omayad Mosque
  • January 1998 to January 2000

The project is to survey and define and rehabilitate the great Omayad Mosque of Baalbeck, which was built around 1100 AC.

Project Duration: 24 months.

Architect Designer and Coordinator at 20- Hind Hijazi Mosque
  • January 1998 to January 2000

The project is to design and build a new mosque in the name of the P.M. Rafic Hariri's mother near Maqam Sharhabil Bin Hasna at the vicinity of Saida.

Project Duration: 24 months.

Architect Restaurer and Coordinator at South Lebanon
  • January 1997 to January 1999

The project consists of the studies and preparation of a report on the Saray Fakhreddine historic site, in order to determine the role and mode of intervention in this site, in coordination with foreign historians and experts in Islamic heritage. The project developed towards the design and execution works aiming at the transformation of a historical site into a meeting place between the different communities composing the different social levels of the city of Saida.

Project duration: 48 months

Architect Designer and Coordinator at 15- University Institute for Technology
  • January 1996 to January 1999

The project consists of remodeling four existing buildings of about 25000 square meter to accommodate the university of technology in Saida.

Project Duration: 12 months.



16- Consolidation project for houses of old Saida’s town Saida-lebanon

Architect Designer and Coordinator at 14- Baha’a Eddine El Hariri Elementary School
  • January 1997 to January 1998

Design, execution drawings and supervision of Saida Municipality Bldg., which included remodeling of facades and redistribution of Municipality departments.

Project Duration: 12 months.

Architect Designer and Coordinator at Sayroub-Lebanon
  • January 1996 to January 1998

Design and execution drawings and supervision work for a 3000 square meter villa, a swimming pool and guest house annexe, employees facilities, and a power plant building, with 40000 square meter of soft and hard landscape.

Fakhreddine Saray at Old souks of Saida- Lebanon
  • January 1994 to January 1998
Architect Designer at Hlaliyeh – Lebanon
  • January 1995 to January 1997

The project is a donation by the Islamic bank for development, in coordination with the Lebanese authorities. It is a 10-school project, the work consists of preparation of preliminary and execution drawings, and site supervision.

Project Duration: 24 months

10- Mr. Ahamad Kalash, Private Residence

Architect Restaurer and Coordinator at Old souks of Saida - Lebanon
  • January 1991 to January 1997

The project consists of survey and documentation and the execution of the rehabilitation works for the historical building, in full coordination with foreign historians and experts in rehabilitation.

Deputy Mrs. Bahia Hariri villa at Hilaliyeh– Lebanon
  • January 1991 to January 1996
Architect Designer and Coordinator at Saida-Lebanon
  • January 1994 to January 1995

Design and execution and supervision of a 60000 square meter graveyards with a 1000 square meter condolence building and prayer hall with preparation rooms for the dead.

Project Duration: 24 months.


13- Rehabilitation of Saida Municipality bldg.

Architect Designer at Babliyeh – South Lebanon
  • January 1994 to January 1995

The project consists of design and execution of several farmhouses to hold cutlery, poultry, and dairy factories.

Architect Designer at 19- Saida Municipal Stadium
  • January 1994 to January 1995

The project is to propose a new master plan for the existing municipal stadium including the extension of the stadium and a new parking lot.

Project Duration: 15 months.

Architect Designer and Coordinator at Hariri Parents Vill
  • January 1990 to January 1991

The project is to rehabilitate an existing villa of around 8500 square meters damaged by the recent war, the job consisted of a coordination effort between all existing trades and contractors.

Project Duration: 9 months

4- Brak Residence (1993) Zahrani - South Lebanon

Architect Designer and Coordinator at Rafic Hariri High School
  • January 1988 to January 1991

The project covers a land around 45000 square meters, consisting of 10 buildings. Covering a built up area of around 42000 square meters: comprising of a kindergarten bldg., an elementary bldg., an administration bldg., an intermediate bldg., a secondary bldg., a fully equipped theater housing 500 seats, a fly tower and a back stage area, a fully equipped gymnasium, a cafeteria bldg., and a mechanical room.
The task consisted of design, execution drawings, coordination and site supervision.

Project Duration: 36 months

Architect Designer at 26-Houssam Eddine Hariri High School
  • January 2001 to

The first phase consists of legalizing the newly built buildings of the KG and the elementary stages, the second stage consists
Preliminary design and permit licence.

Project Duration: 3months.


27-Al Badr Mosque(2002) Najarieh-South Lebanon

Deputy Project Director and Technical manager at Bequaa Medical Center
  • to

and design manager for Jeddah Tower Project (kingdom Tower), at Ubhor- Jeddah-KSA, Saudi BinLaden Group.

•From 1/5/2008 till to date -Project manger and Architect designer for the North Development Project, Oger Liban
This project involves the construction and furnishing of nineteen public schools and two dispenseries and a fruit and vegetables Market and a Cold store rooms for fruits in the North of Lebanon.The task involves the updating of existing tender documents available at the Council of Construction and Development and the construction management of these projects along with the design and preparation of the tender documents required for the construction of five projects.These projects are as follows;
1-Majdal Public School. (finished and handed over)
2-Rijem Public School. (finished and handed over)
3-Tal Abass public School. (finished and handed over)
4-Tal Meayan Public School. (finished and handed over)
5-Tikrit Public School. (finished and handed over)
6-Rahbe Public school. (finished and handed over)
7-Mrahat akaar Public School. (on Hold)
8-Qarqaf Public School. (finished and handed over)
9-Birkayel Public School. (finished and handed over)
10-El Bireh public School. (finished and handed over)
11-Sindianeh public School. (finished and handed over)
12-Zouk Hosnieh Public School. (finished and handed over)
13-El Mineh Public School. (finished and handed over)
14-Tannourine public School. (finished and handed over)
15-Tebbaneh one Public School. ( finished and handed over)
16-Tebbaneh two Public School. (finished and handed over)
17-Jebal mehsen Public School. . (on Hold)
18-Deir Ammar Public School. (finished and handed over)
19-Bakhoun vocational and training School. (finished and handed over)
20-Batroun Social and Medical Center. (finished and handed over)
21-Halba Social and Medical Center. (finished and handed over)
22-Qobbet bechamra Fruit and Vegetables market. (finished and handed over)
23-Fnaidiq fruit and Vegetables Cold Store Rooms. (finished and handed over)
24-Sir Donnieh Sports venue. ( finished and handed over)

B) From 1/5/2002 till 1/5/2008 -Responsible Design Architect, Oger Liban design dept.
working on the following projects:

Rest House In Bekaa.( Architectural Preliminary Design) .
Modification of Faqra villas.(Architectural Preliminary Design) .
Al-Amin Mosque(Architectural Design Concept and execution drawings and supervision on site ).
Hajj Bahaaeddin Hariri Mosque -saida, follow up and supervision works.
Al Qotaishieh Mosque - saida, management of historical renovation works and architectural works.

at Haret Naameh Medical And Social Center
  • to

Saadnayel Municipality Building-Preliminary Design.
Tyr Medical and social Center-Preliminary design.

General Director at Beqaa Hospital
  • to

Architect in charge of Office of Engineering Studies, Hariri Foundation, Saida - Lebanon

Technical director
  • to

Arhitect in charge of Office of Engineering Studies, Hariri Foundation, Saida, Lebanon.

Architect Designer and Coordinator
  • to

The project covers an area of around 9000 square meters with a total built up area around 6500 square meters-comprising of private residence with full services such as pool, gymnasium, central kitchen, administration, with full Electro-mechanical services.
The task consisted of the design of the design and coordination with the client and the preparation of the full execution drawings in coordination with other trades such as decoration, electro-mechanical and landscaping.

Project Duration: 60 months

Architect Designer
  • to

The project consists of remodeling of an existing villa along the seashore to accommodate all services and the new program requested by the client.

Project Duration: 4 months

5-Babliyeh Villa (1993) Babliyeh - South Lebanon

Architect Designer
  • to

The project consists of remodeling of an existing building to house and serve as a farm resort for the owners of the farm.

Architect Designer and Coordinator at Saida - Lebanon
  • to

The project consists of remodeling and use of three existing buildings of about 9000 square meter as an elementary school.

Project Duration: 12 months.

Architect and Coordinator
  • to

The project is aimed at the quick repair of immediate needs for the inhabitant of old houses in old Saida Town. It is a low cost rehabilitation project that deals with a wide range of deteriorating houses.

Project Duration: Unlimited


17- Rehabilitation of Old Souks of Saida Saida-Lebanon

Architect and Coordinator
  • to

The project is a cooperation project with the directorate of antiquities in Lebanon, and the region-Midi Pyrene and the Prince of Wales’s Institute for architecture. It is aimed to find solutions and ideas for the conservation and development of Old Souks of Saida.

Architect Designer and Coordinator
  • to

The project is to design and build a congressional mosque in
The name of the late P.M.Rafic Hariri father at the northern entrance of the city of saida with an occupancy of about 3000 prayers and an area of about 7500m2

Project Duration: 3 years.

Architect Designer
  • to

The project consists of the preliminary design of a mosque
With its services in a small southern village with lebanese
Architectural vocabularies with the production of the permit.


28-Al Qotaishieh Mosque (2000) Saida -Lebanon

Architect Restaurer and Coordinator
  • to

The project is to survey, analize and supervize the
restauration works of a 350 years old mosque inside the old
urban tissue of the city of Saida.Site as well as the financial
management of the working group.

Project Duration: 18 months.


29-Al Ouzaie Maquam and Mosque (2000) Beirut -Lebanon

Architect Restaurer and Coordinator
  • to

The project is to survey, analize and supervize the
restauration works of a 1000 years old mosque at the out
skirts of Beirut. The responsabilities were the architectural,
financial and management duties.

Project Duration: 18 months.


30-Al Mansouri Mosque (2001) Tripoli-North Lebanon

Architect Restaurer and Coordinator
  • to

The project is to survey and document the old mosque of
Tripoli and the logistical preparation to establish a work
Group .

31 -Ain El Helwe School For Boys. (1998) Ain El Helwe Saida


D)-From 1/7/1983 till 29/2/1988 - Assistant head of Design Section - special studies department Oger Liban


Rehabilitation of old Souks of Beirut Ayass, Tawile, Jamil

Team Leader
  • to

The project covers an area of 4 hectares of deteriorated historical and old buildings. The area was one of the oldest souks of Beirut. The aim of the project is to design a commercial center based on the fact that the area has it’s own historical and architectural character.

Team Leader at Zone G - Historical area of Beirut Soursock, Nourieh
  • to

The project covers an area of about 8 hectares composed of historical “religious and commercial buildings” plus a large zone of demolished buildings. The aim of the project is to conserve the old tissue and the old pattern and to design and fit new commercial and residential buildings and new activities that act and communicate with the existing surroundings.

Team leader at Beirut Central District Master Plan
  • to

for a group of ten acrhitects

Job Description: The project is to work with other groups for the production of a master plan for the beirut central district- scale 1/400 with a total built up area around 4 million square meters with the production of a model scale 1/400.

4- Beirut Central District - Infrastructure project

Architect and Coordinator
  • to

The scope of work is to study and propose the suitable networks of the following services to downtown-storm water drainage, sewerage, telephone and street lighting network.

My intervention was the coordination between the urban project and the trade consultants (ACE) working on the project.

Audio Visual Presentation Beirut Central District

Job Description: The aim of the project is to present the project + model in front of senior officials of the government with the aid of 6 sophisticated Hasselblad projectors with gear control and influencing music.

Urban Design Project of the following Zones in the Beirut:

Central District: Front du Mer, dalle du port, Wadi Abu Jmil, Radio TV, Serial, Debbas.

My intervention was the coordination with the consultants working in the above mentioned projects.

Team Leader and assistant architect at Residential Units Beirut Southern Suburb
  • to

The project covers an area of 40 hectares. The scope of work was to gather all information of the site and it’s surroundings and to establish a:
•Master plan (1st phase) that reflects all the activities of a residential complex.
•Detailed study of the housing units and its categories.



Mr. Rafic Hariri Villa Kouraitem Beirut - Lebanon

Architect designer
  • to

Project Description: The project consisted of remodeling of the interior layout of the existing Villa in coordination with the decorator, and remodeling of the exterior garden.

Project Duration: 18 months

8 - Bank De La Mediterrane -Mar Elias Beirut -Lebanon

Architect designer
  • to

Project Description : The project consisted of total remodling of an existing
Building into a branch for the bank and insurance co.

Project Duration : 12 monthes.






E) Year 1982 from 15/12/1982 till 15/4/1983, I experienced architecture through my private office.

Involvement was execution drawings of a palace in Riyadh - Saudi Arabia, and design execution of Beirut Arab University auditorium annex building, Faculty of Architecture.

Contractor
  • to

Contracting Works-Phase 1- Main Villa, execution of external stone cladding works(10000 m2)

Project duration: 8 months


12- Prime Minister Rafic Hariri Villa Faqra - Mount Lebanon

Contractor
  • to

Job description Contacting Works - phase 2 - external landscape works(stone)

Project duration: 3 months


13- Prime Minister Rafic Hariri Villa Faqra - Mount Lebanon

Contractor
  • to

Contracting Works - phase 3 - external swimming pool (stone works).

Project duration: 3 months


14- Jawad Building Beirut central district

Education

Bachelor's degree, architecture
  • at Beirut Arab University, faculty of Architecture
  • January 1981

courses: Lebanese Baccalaureate Part I, 1973 – 1974. Lebanese Baccalaureate Part II, 1974 – 1975, Experimental Science Bachelor in architectural engineering Honor degree

Specialties & Skills

Management
Architectural History
Construction Consulting
CONSULTING
DOCUMENTATION
INTERIOR DESIGN
LAYOUT DESIGN
MICROSOFT OFFICE
MICROSOFT WORKS
NETWORKING
PRIME MINISTER
SUPERVISORY SKILLS
TEAM OFFICE
materials
project execution

Languages

Arabic
Expert
English
Expert
French
Intermediate
Italian
Intermediate

Training and Certifications

GIS certificate (Training)
Training Institute:
Beirut Arab University
Date Attended:
January 2012
Duration:
70 hours

Hobbies

  • walking- swimming
    life savor and skin diver