Bernardo Flores, Instrument Engineer

Bernardo Flores

Instrument Engineer

Kencana Petroleum (Kencana HL)

البلد
الفلبين
التعليم
بكالوريوس, Electrical Engineering
الخبرات
26 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :26 years, 2 أشهر

Instrument Engineer في Kencana Petroleum (Kencana HL)
  • ماليزيا
  • أشغل هذه الوظيفة منذ يناير 2012

Responsible for providing fabrication engineering support for offshore projects until project completion which include as follow:
- Technical input to constructability issues
- Issue fabrication drawing
- Provide technical support for procurement activity by performing technical proposal evaluation

Projects involved:
a.C11-026 EPCC of KAMELIA Wellhead Platform - Topside (HESS Exploration and Production Malaysia B.V.)
b.C11-018 EPC of AMPA-09 Compression Project (Brunei Shell Petroleum Company Sendirian Berhad)

Instrument and Control Design Engineer في Zuhair Fayez Partnership Counsultants
  • المملكة العربية السعودية - الخبر
  • أبريل 2005 إلى أكتوبر 2011

Responsible for conceptual and detail design engineering of Saudi Aramco (General Engineering Services) and SATORP (Saudi Aramco & TOTAL Refinery and Petrochemicals) projects. Responsibility includes preparation of project proposal packages, preparation of detail design packages and performing QA/QC review.

Projects involved:
a.Saudi Aramco (BI-10-3074): Uthmaniyah Gas-Oil Separation Plant (GOSP’s 9, 11, & 12) Control Systems Upgrade
b.Saudi Aramco (BI-10-0190): Additional H2S & LEL at Southern Area Oil Operation Facilities
c.Saudi Aramco (BI-10-0179): Replace Control System at East West Pipeline Pump Stations 1 to 11
d.Saudi Aramco (BI-10-0179): East-West Pipeline Leak Detection System
e.Saudi Aramco (BI-10-03754): Hawtah Stabilizer Upgrade & Nuayyim ASL Crude Increment-100MBCD
f.Saudi Aramco (BI-10-0284): Replace Control System for Hawtah Field Control Center & Water Remote Injection System
g.Saudi Aramco (BI-10-0241): Replace Electrical Equipment at 5 Southern Area Gas-Oil Separation Plant
h.Saudi Aramco (BI-10-0450): Manifa Central Processing Facilities
i.SATORP Saudi Aramco & Total Refinery Projects-Detailed Engineering (Contract no. 3000235436) “Package-5C Auxiliary Utilities”. Instrumentation design utilizing SmartPlant Instrumentation (INTOOLS) and Microstation.
j.Saudi Aramco (BI-10-0977): Expand Abqaiq Sewage Treatment Plant

Instrumentation Designer في Worley-Petrocon Arabia Ltd.
  • المملكة العربية السعودية - الخبر
  • فبراير 2001 إلى مارس 2004

Responsible for the execution and development of engineering packages for Saudi Aramco General Engineering Services (GES) projects, non-Aramco and in-house projects involving engineering design of instrumentation works, project coordination, field survey, as-built and construction/fabrication drawings.

Projects involved:
a.Yanbu Royal Commission: Bakri Bulk Plant Terminal
b.Saudi Aramco: Connect Substation Fire alarm system in Ras Tanurah Refinery
c.Saudi Aramco: Riyadh Refinery Feed Condition System
d.Saudi Aramco:New Jumpover and Metering Skid
e.Saudi Aramco: Solar RTU Upgrade
f.Saudi Aramco:PSA Tail gas recovery Unit at RTR
g.Gama Al-Moushegah Arabia Ltd. (Sabic Terminal Services Co.): SABTank Jubail Port Expansion
h.Saudi Aramco: Conceptual Design for the Modification of the Loading Bays in Al-Jouf Bulk Plant
i.Saudi Aramco: Detailed Engineering of C3+ Recovery Unit
j.Saudi Aramco: Electrical Power to Haradh, Ghazal & Wudayhi Gas Field
k.Saudi Aramco: Emergency Alarm Bells for Dhahran Air Oil Field Tank Farm
l.Saudi Aramco: Control Room Upgrade at King Fahd International Airport- Jet A-1 Air Fuelling Unit
m.Saudi Aramco: Sales Gas Supply to East/West Pipeline Pumpstation 1, 2, & 3 at Yanbu

Instrument and Control System Designer في Fluor Daniel, Philippines
  • الفلبين
  • مايو 1998 إلى يونيو 2000

Responsibility includes; PDS 3D modeling work of off-line and in-line instruments, Instrument Index database I/O points assignments, Field Wiring and Marshalling Cabinet cross wiring utilizing MS-ACCESS database system, development of Instrument Loop Diagram using Fluor Daniel’s PC-ILG FACET-LOOP 5 software and d-base III plus. Participate in PDS 3D model clashing review using DRV terminal.

Projects involved:
a.Pygas Model Project: Saudi Chevron Petrochemical Pyrolysis Gas Treating Facility. A work shared project between Fluor Daniel Philippines and Fluor Arabia Ltd. Scope includes PDS 3D modeling of in-line and off-line instruments.
b.Solutia Acrylonitrile Project: Alvin, Texas, U.S.A. A work shared petrochemical project between Fluor Daniel Houston and Fluor Daniel Inc., Philippines. As a 2 time awardees of Solutia SELECT (Solutia Excellence and Commitment to the Team), I was responsible for ILD termination database input, FACET-LOOP set-up, Marshalling Cabinet Cross wiring, MS ACCESS based wiring diagram, I/O points assignment, and PDS 3D modeling.

Production Supervisor في 3-D Industries, Inc.
  • الفلبين
  • يونيو 1996 إلى مايو 1998

Responsible for the supervision of Electric Fan Winding and Motor Assembly section, Veto switch and socket outlet assembly, Gas stove assembly and Flatiron assembly. Partly developer of company’s in-house program, Material Control database management system using Clipper v.5.0. Also responsible for the development and improvement of product processing by designing jigs, fixtures and electro-pneumatic, electro-hydraulic instrumentation and control to augment product quality. Oversee the repairs and maintenance of electrical machines, jigs and fixtures within section and conduct routine inspection of work.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Technological Institute of the Philippines
  • مايو 1995

Pass Licensure Exam for Board of Electrical Engineering Registered Electrical Engineer: Licence no. 0000125

Specialties & Skills

Preparation
Production
Instrumentation
Instrument Control
Microstation
Smartplant Intools
MS Excel programming
MS Access

اللغات

الفيلبينية
متمرّس
الانجليزية
متوسط

العضويات

Institute of Integrated Engineers of the Philippines
  • Regular Member
  • November 1995