electrical engineer (mep)
STFA
Total years of experience :13 years, 0 Months
Project: Small Boat Harbour project for Kuwait Oil Company (KOC) project amount (USD 750 million). This project contains a different type of buildings such as substations, industrial buildings; craft buildings guard houses, workshops and existing building for KOC engineers.
• Responsible for 3 substations which include HT & LT panels, generators, and transformers.
• Prepared typical installation drawings for electrical equipment, earthing, light fixtures, cable trays and conduit layout.
• Administered installation for cable tray (ladder and perforated type) for different services.
• Carried out duct installation for cable entry in all assigned buildings.
• Performed conduit installation for lighting, sockets, earthing, lightning and LV systems.
• Effectively managed the whole gamut related to excavation and cable pulling for underground cables, installation for the generator, transformer and MLTP and MCC and glanding and termination for power and control cables.
• Performed other activity such as plumbing, firefighting and HVAC.
Project: Integrated Security System for all KOC sites with project amount of (USD 500 Million).
• Generator and Transformer: Successfully installed generator, generator control panel and transformer inside the sub-station then pull power and control cable then make glanding and termination for all cables.
• 440V Switchgear and UPS: Performed panel installation, cable glanding and termination and panel earthing.
• Lighting Poles: Oversee installation of the light pole foundation and light pole then make glanding and termination for cables at cut out for lighting poles.
• Earthing: Administer earthing for buildings including cad welding, earth rod installation, and lighting system.
• Underground Cable: Carried out Trench excavation, cable pulling and backfilling for underground cables.
• Building Activity: Managed DB’s installation, light fixture, and power sockets installation then pull wire from DB to light fixture and sockets through the conduit as well as cable tray installation (ladder type and punch type).
• Provided recommendation related to product and service solutions in the line with clients’ needs and requirements and generated quotations accordingly.
• Conducted frequent meetings and constantly gave presentations to clients and consultants to create opportunities for value creation.
• Worked on getting approvals for a variety of company’s products from different ministries such as MEW, MPW and MOD.
• Assisted Installation team in site works such as installing generators in generator rooms.
• Installed pre-designed panel boards for various types of generators.
• Worked on commissioning and testing of generators at protection department.