Senior Site Engineer
Total years of experience :19 years, 7 Months
Building steel structure retail units for M&S Food Store in Sheldon area, setting out, survey of quantities and looking after the gangs on site.
Reporting to site and project manager.
Working for reputable main contractor doing QA and setting out, taking as built and report to project manager on site, leading subcontractors and providing them with an updated information and drawings on daily basis.
Mcdermotts- Groundwork Construction Company
Setting out and supervising of external work for Northampton University using one man robotic leica total station, surveying the as built, discuss the design issue with the client ( Bowmer & Kirkland) providing the gangs on site and update them with technical information, external work includes; landscaping, drainage, kerb edging and different kind of pavements.
Oakleigh Build
Building 14 houses in Oxford starting by setting out the piles footings and drainage, report to the project manager and leading the subcontractors on site.
Setting out the stone piles, drainage and bolts for ground workers, working for the main contractor in building a steel structure frame
Hannafin Construction Company
A project of 50 million pound is running by Carillion with high standard and valuable execution in building and safety management, as a site engineer working with groundworkers, giving setting out by robotic total station and supervising drainage of the project.
Prepare QA for pile caps, ground beams and drainage on daily basis, liaising with design coordinator for the issues arising during construction, recording As Built.
Setting a new business in Kurdistan, discussing a proposal to Sulaimniya Governerate to establish new parking system for the City of Sulaimaniya.
Working in a project of housing development, checking the quality of the subcontractors including foundation, brickwork, drainage and RC frames, giving setting out using robotic one man Leica total station and handing over the information required by subcontractor's engineers and representative, reporting the issues to the construction manager and resolve the problems during construction.
General setting out for partitions, drainage and electrical holes, liaising with management team to produce high quality of finishing, giving information to the tradesmen on site.
Shari Nawroz, Sulaimaniya-iraq)
Supervising subcontractors, monitoring the project step by step from foundation to decoration.
Checking quality of products/services and project execution, giving plans so that quality is never compromised and risk factors are nullified to the minimum possible extent.
Building a new business in trading survey equipment to Iraq and qualify in AutoCAD by receive certificate from City Guild last year.
Binaalghad construction company, Sulaimanya, Iraq
Checking steel and form-work on 28 multistory towers, setting out for slabs, shear walls, shafts, stairs and columns. Checking the quality of the job before concreting, make sure the product meets with the specification and match the architecture plans.
Responsible of all technical problems on site, setting out for 3 floors crescent building, carrying out all engineering duties of running the job up to time schedule by coordinating with client's engineer (HBG) in building a frame concrete for Joseph chamberlain College in Birmingham, total cost of the project is £29 million.
Supervising on site, solving technical problems, discussing design issues with structure designer and giving suitable solutions, survey daily progress and report it to site manager, setting out for piles, bolts, gridlines, coordinating with ground worker's subcontractor, establishing new stations.
Ras El-Anuf, Libya.
Supervising a wide range of projects (Lube Oil Store, Gas Cylinder Store, HVAC workshops (3 units), Sewage Treatment Plant). Finishing works, damp-proofing, drainage and ground works, interpreting original plans, specifications and drawings, regularly meeting with clients engineer (Ras El-Anuf Oil Company) to discuss most appropriate methods to resolve problems. Inspecting concrete, steel, formworks and materials.
Al- Emara Engineering Office, Sirt, Libya.
Supervising the construction of fifty new houses as part of a seven hundred-house project, checking and approving each stage from foundation to finish including drainage, groundwork and water supply. Liaising with site and senior engineers on a daily basis to monitor progress, prepare budgets, and authorize allocation and release of funds.
David Ashley Construction Company
Supervising the concrete frame and giving general setting out and providing technical information to the operative and craft persons on site, reporting to site manager, discussing the technical issues with the client.
Maxx superstore in Hanley city centre, marking out all demolished structures, and setting out with leveling for the new structure.
-Responsibilities: Marking out demolished structure, Leveling of ground work with setting out of new steel structure, reporting to the site manager and coordinating with a Site Forman.
setting out foundation of the columns for extension of Telford College, leveling of the bases.
Setting out engineer, M.J. Gallagher
on a large fourteen storey flats project with underground car parking, setting out each stage of production, liaising with architects and planners. Setting out for table forms, checking reinforcement on decks, carrying out dimension surveys and leveling.
courses: -Upper intermediate - English as a second language - Level 1
courses: 33 subjects include: Eng.drwg. & script geometry. Computer program. Mathmatics.Construction drwg. & bldg. Theory of structure. Reinf. Concrete. Foundation. Steel structure, Water supply & sewage. Eng. Economic & Management. Surveying. Estimation...........etc