Engineering Procurement Installation and Commissioning(EPIC) works of ADMA Switchgear up gradation Project at DAS island for ADGAS, Abu Dhabi, UAE.(Brown field Project)-Contract Number: CON-PAC-030-2012/LCE1(DS) including Power management system(PMS), Generator management system (GMS), Load Management System (LMS), and Distributed control system(DCS).Achieved final mile stone as per schedule and within budgeted cost. Achieved One million Safe Man hours.
Contract Number: CON-PAC-028-2012/LCE1(DS):Engineering Procurement Installation and Commissioning(EPIC) works of Up gradation of Substation # 6 at DAS island for ADGAS.(Brown field Petro Chemical Project)- Achieved final mile stone in Mar 2016 ahead of schedule.
Contract No N6166.1: Engineering Procurement Installation and Commissioning (EPIC) of 2 numbers of 132/11kV substations at ADNEC and Watani, ABU DHABI,
Contract No G3600.1: EPIC of 11kV Network at Power complex and Terminal Buildings area and integration of SCADA for ADAC, Abu Dhabi International Air Port
Contract No.A1844.1: EPIC of -132 numbers of 11kV Brick built substations for AlAin Distribution company, AlAin.
Contract No. G1456.1: Turn key project G1456 at Mussafah 132/11kV primary substation.
Main EPIC Contractor for QATAR PETROLEUM for EPIC CONTRACT OF HALUL POWER STATION - PHASE II FOR QATAR PETROLEUM, involving 3 nos. of 5.7 MW ALSTOM GTGs and accessories.
From September 2002 to March 2003:
EPIC 110kV, 33kV substations and lines for KSEB, Kerala state.
From December 2000 to August 2002:
EPIC of 132kV Substation, 8 Nos. of 33kV Substations, 42kM long 132 kV transmission line, 150 kms. of 33 & 11 kV Overhead lines, 3 nos. of Bay extensions in the existing substations. For MSEB- Jalna district, Maharashtra State.
From September 1997 to November 2000:
Electrical Construction Engineer for EPIC of 132kV Substation, 10 Nos. of 33kV Substations, 30kM long 132 kV transmission line, 250 kms. of 33 & 11 kV Overhead lines, 10 nos. of Bay extensions in the existing substations for APSEB- Kamareddy, Nizamabad district, Andhra Pradesh State.
For planning of Electrical maintenance schedule, preventive maintenance of 10 nos. of 250kW DC Variable speed drives, 10 nos. of 37 kW AC Variable speed drives, 2 nos. of lifts for five floors, Flame proof area motor maintenance, fire alarm system, telephone exchange, two nos. of 6MW Wartsila DG Sets, and one number 110kV Switch yard for SOUTHERN PETROCHEMICAL INDUSTRIES CORPORATION (SPIC) - Pharma division at Cuddalore, Tamil Nadu state, India.
SECOND CLASS