Lead HS & Sustainability Assurance
Supreme Committee & Delivery Legacy.
Total years of experience :13 years, 3 Months
Project: World Cup Event and preparation. International Broadcast Centre / Main Media Centre for FWC Event Qatar 2022. Amir cup final event HS&A at Khalifa Stadium. Arab FIFA cup SC - HS&A at ECS.
Road Improvement around QP District (DC-085), activities consist Of excavations, replacement of previous underground utilities and high mast lightings involving heavy lifting tasks. Client: Ashghal Consultant/Supervision: GEIC Main Contractor: Al Bawakir Unicon.
Project: Design, fabrication and installation of membrane at the education City stadium project, major activities include assembling & installation of external designed membrane which has to do with constant lifting activities. Client: Supreme committee for Legacy Consultant/Supervision: ASTAD Main Contractor: JPAC JV.
Project: Doha Metro Project, GLEAG which consist of supply, installation, testing, integration, commissioning and maintenance of BACS in all the Qatar Rail Stations across Qatar, achieved more than 2-million-man hour without LTI. Client: Qatar Rail Consultant: Hill International
Project: Design and Construction of Al Wakra Bypass Road package 015 (P015) Client: PWA - ASHGHAL Project Management: KBR Consultants: HALCROW Consultants
Juliet 1&2, Quebec Stands; (QA.2 Project). The project consists of the new Air Stand (Apron), Taxi Kilo and the extension of runway both Juliet 1 and 2 with Yankee and Quebec Client: Hamad International Airport (HIA), Doha Qatar.
Project: Fill the Ground Court of Cayman Islands (Shelf Drilling Yard) Oil and Gas, major activities in the yard involves safe control of plants and other delivery vehicles in addition with loading and unload of backloaded drilling pipes which are conveyed & retuned from the ofshore. Main Contractor: Shelf Drilling Ofshore Limited. Client: Mask.
Client: Nigeria National Petroleum Company (NNPC) Rivers State, Nigeria Duties & Responsibilities
Business Management