Piping Supervisor
YAMAL LNG
Total years of experience :19 years, 0 Months
●Follow up the subcontractor job, monitoring the progress of piping work
●Co-ordinates Detail Piping programs for work carried out directly and works handle by subcontractor, solving technical Problem on site
●Monitoring works Assistants to ensuring the correct implementation of construction activities in compliance with quality standards and requirements (Piping Work)
●Solving Co-ordination and interface problems (Piping) with the client, managing the Different work activities
●Fully conversant with General arrangement plans, P&ID, isometrics, fabrication and layout drawings for piping disciplines.
●Imparting continuous on job training to the workforce for enhancing their productivity & operational efficiencies through knowledge enhancement / skill building.
●Monitoring / coordinating related NDT activities for piping works.
● Supervising and inspection of level quality performance of construction contractors during piping prefabrication and erection activities
●Familiar with international Piping codes and standard.
●Arrange and Co-ordinate punch list & Reinstatement activities.
●Iinvolved shutdown activity in different plant replacing existing pipe and replace new pipe, work
Experience in running plant like LNG, Refinery, and Petrochemical etc.
●Key Deliverables: Timely execution of piping activities with approved Field Quality Plan and with proper safety of all persons, materials and equipment’s and with zero accidents
HSE
Knowledge of industrial safety, got training from Qatar Gas of PTW, H2S, Red MASK, Awareness of Safety rules and regulations in Running plant, Knowledge of housekeeping, safety walkthrough,
Got special safety training for shutdown Knowledge of LEL check before starting the hot and cold work in running plant
EQUATE Project Kuwait (Shutdown Ethylene Unit)
Location : KUWAIT
Responsibility : Involved Shutdown Job In Ethylene Unit, Responsible for monitoring the daily work schedule activities of the sub-contractor such as Installation & Dismantling of pipe with quality job, Support Installation, Punch List and closing the Punch, Closing system punch, Involved Constant & variable spring support unlock,
Attend Weekly progress meeting with client.
TECHNIP (France) (EPC COMPANY
PMP project (Platue Maintenance Project) (AGRU/SRU)
Location : Qatar
Responsibility : Brown Field Project :Involved the Shut down in Train -2 during shut down implementation of construction activities in compliance with quality standards and requirements. Responsible 26 Tie-Ins including installation, Blinding, DE blinding, hot & cold tap, hydro test, reinstatement, Test package clearance
Green Field Project: In PMP project responsible in PR-1, 2.3, Reaction & Incineration Area. Preparing the documents related with Piping erection, preparing 3 weeks look ahead of spool erection, fabrication priority list, Preparing the Golden Weld related documents, critical spool erection detail,
Responsible for works is in accordance with project schedule and erection sequencing.
Responsible for monitoring the daily work activities of the sub-contractor such as erection of piping above ground Including field fabrication / installation of small bore.
Coordinating with planning department to analyse project data and highlight areas of concern.
Prepare daily reports and various accomplishment reports.
Coordinate at site with subcontractor in charge for job progress, coordinate with structure and Equipment Department.
Solve technical problem, Monitoring works Assistants to ensuring the correct implementation of construction activities in compliance with quality standards and requirements of Piping job.
Spool fabrication Statues monitoring by using of PSMS,
Responsible of sulphur pit coiling erection inspection
Responsible the punch killing, hydro test, reinstatement, stream tracing, in Reaction and incineration area, to follow the subcontractor job
HSE : Checked every day hot and cold permit before stated the job, checked the fire blanket of temporary booth, checked Fire extinguisher, checked monthly colour band of Tools, also checked the workers for PPE, housekeeping, PTW Receiver and H2S awareness course from QATARGAS. Hazard Identification, Lifting and Rigging Awareness, Confined Space Entry from Qatar Gas. Attended daily tool box talk, Follow-up the house keeping in elevated place, Checked every day crane check list for lifting the piping spools, teaches the worker for hazards and wearing the PPE
Site Piping Construction activities of Steam and utilities piping which is connected to the boiler, presently handle the sites individually of piping construction job. reviewed engineering documentation issued for construction. Ensured Materials are delivered in time to meet schedule, coordinating with supervisor & Foreman for piping prefabrication and erection activities. Supervising and inspection of level quality performance of construction. Carried out by Supervisor & Forman during piping prefabrication and Erection activities. Ensured Installations conform to Project Codes and Standards. Arranged and coordinated Piping Hydraulic tests& leak test according to Project Specification. Solved the Technical & interface problem at Site Attend Progress meetings Liaise with Site Management on issue Mechanical Completion Certificate Responsible for Finalising Piping Handover Certification
Responsible for monitoring the daily work activities of the sub-contractor such as erection of piping above ground / underground Including field fabrication / installation of small bore. Worked in live plant for installation of Process and utilities line beside of live line,
Responsibility of Hydro test & reinstatement coordinator, Involved Hydro Test & Re-instatement½” to 42” Pipe ( like CS, Stainless steel Glass Flake) in Crude train A, Crude Train B Instrument Air System, Fire Water, Charge & Shipping Pump, Chemical injection System., WOSEP, HP Flare, LP Flare
SAIPEM LTD (EPC COMPANY) Project Completed
Responsible during Shutdown replacing 42” flair pipe 12”, 6”, 4”, 3” process pipe 28” RTR underground pipe and re installed within 28 days Shutdown. Preparing the shutdown task, follow-up the daily basis shutdown scheduleSolving Co-ordination and interface problems (Piping & mechanical) with the client, managing the Different work activities
Monitoring works Assistants to ensuring the correct implementation of construction activities in compliance with quality standards and requirements (Piping & mechanical Work)
Follow-safety during shutdown, get the special training also worker for awareness during cutting of existing pipe, follow-up and checked crane load chart, housekeeping, also follow-up the hot work and cold work, checked every day work permit
Consolidated Contractors International Company (CCIC) (Contractor), Resign for better opportunity
Project : Oil Pumping Station Sudan
Location : Sudan (Africa)
Responsibility : Follow up Subcontractor Piping work like Fabrication Erection of CS pipe for Oil Pumping Station, Production, Planning, Supervising, And Fit up inspection on daily Basis
Value Maximization Project Crude I, Crude II Aromatics
on the field of U/G & A/G piping (Crude Column & FCCU)for shutdown cum expansion (VMP) job. Co-ordination with contractor, Hook-up with existing Header (Tie-in). the new pipe, arrangement of spools and non wieldable material for shut down. Maintain the shut down work schedule Involved the shutdown job of crude II like pipe replacing, cold tapping, Cutting, Grinding of existing pipe, installed
HSE :
Follow-safety during shutdown, get the special training also worker for awareness during cutting of existing pipe, awareness of H2S gas, checked LEL before starting the hot work follow-up and checked crane load chart, house keeping, also follow-up the hot work and cold work, checked every day work permit
PTW Receiver and H2S awareness course from Reliance
Hazard Identification, Lifting and Rigging Awareness, Confined Space Entry from Reliance
Supervision of unit piping erection, Loop testing, Material Handling, Familiar, with CS, SS, LTCS. IBR, ALLOYS, Material take individual charge of one unit erection of unit piping
Supervision of piping erection Loop testing, Material Handling. Familiar with CS, SS, LTCS, IBR, ALLOYS, material.
Involved IOCL shut down replacing the plenum plate of Furnace, stud welding, replacing Process pipe, supervise the cutting grinding, welding of piping spool for shutdown
Follow-safety during shutdown, get the special training also worker for awareness during cutting of existing pipe, awareness of H2S gas, checked LEL before starting the hot work follow-up and checked crane load chart, house keeping, also follow-up the hot work and cold work, checked every day work permit
LNG Process Area, Qatar Gas Expansion -Utility Area (ICR Pipe Rack, QG1 PR-10, G00B Area), LNG Project, State of Qatar.
Location : Qatar
Responsibility :Responsible for monitoring the daily work activities of the sub-contractor such as erection of piping above ground / underground Including field fabrication / installation of small bore. Clearing the punch list, Solve technical problem, Monitoring works Assistants to ensuring the correct implementation of construction activities in compliance with quality standards and requirements (Piping Work. Worked in live plant for installation of Process and utilities line beside of live line,
HSE : Checked every day hot and cold permit before stated the job, checked the fire blanket of temporary booth, LEL detection, checked Fire extinguisher, checked monthly colour band of Tools, also checked the workers for PPE, housekeeping, PTW Receiver and H2S awareness course from QATARGAS. Hazard Identification, Lifting and Rigging Awareness, Confined Space Entry from Qatar Gas. Attended daily tool box talk, Follow-up the house keeping in elevated place, Checked every day crane check list for lifting the piping spools, teaches the worker for hazards and wearing the PPE.
SNC LAVALIN (EPC Company
Project: New Refinery, VADINER Gujarat, India
PMP project (Platue Maintenance Project) (AGRU/SRU)
Location : Qatar
Responsibility :Green Field Project: In PMP project responsible, Reaction, Incineration Area & Regeneration Area.
Responsible for monitoring the daily work activities of the sub-contractor such as erection of piping above ground Including field fabrication / installation of small& Large bore pipe.
Coordinating with planning department to analyse project data and highlight areas of concern.
Prepare daily reports and various accomplishment reports.
Coordinate at site with subcontractor in charge for job progress, coordinate with structure and Equipment Department.
Solve technical problem, Monitoring works Assistants to ensuring the correct implementation of construction activities in compliance with quality standards and requirements of Piping job.
Responsible to supporting the subcontractor the clearing the Punch and Re-instatement
Involved clearing System Punch and Discipline Punch
TECHNIP (France) (EPC COMPANY) Assignment completed April ’12 to June ‘13
SHAYBAH CPF PROJECT(Gosp-4) Saudi Arabia
W.B.), ACC (Karnataka), CPCL (Chennai).
Project: AMONIA - IV project, Poly Propylene project, LLDPE Project, ACC CEMENT PLANT, CPCL REFINERY - III Expansion, OHCU Unit
Automatic Painting Booth
Engaged a small Turnkey Project for Automatic Painting Booth
with First Class