Work Experience

Total years of experience :17 years, 10 Months

FM Services / DLP Manager at Khidmah LLC
  • United Arab Emirates - Abu Dhabi
  • My current job since April 2012

 Site work Supervision / inspection /verification / observation to ensuring the contractors are following / complying project specification / contract drawing /design drawing / shop drawing as per the contract documents, and the Inspection Test Plan
 Inspection / Snagging the Site and defect report forward to the client for the rectification by the contractor.
Supervise the rectification of the all defect and verify the work is done as per the specification and approved materials.
Defect rectification supervision / Approval of all the Hand over comments
Defect rectification / maintenance and managing with the contractor for the common Area Commercial Area Mall area and Residence.
• Inspection / verification of all systems Operation / performance, status report forwarded to the client for the rectification / records.
• Daily Operation defect with defect list will be forwarded to the Client / contractor for rectification.
• Managing the Permit to work application for the contractor, for the rectification
• Ensure all Safety procedure are followed at site.
• Since the project about complete and Take over Certificate issued by part by part Takeover of the building, Preparation of Asset register, preparing the PPM schedule
• Preparing the budget / scope of work, appointing the specialist contractor for maintenance,
• Managing the Defect Liability Period,
• Responsible for successfully managing the insourced Hard / Soft Services and DLP team for High-rise Tower witch consist of Mall and Residential development - Abu Dhabi Gate 1, 2, 3 and ARC Tower with a total managed plot of 840, 000sqm. As the project is about complete and Take over Certificate issued as part by part. Takeover of the building, Preparation of Asset register, preparing the PPM schedule preparing the budget / scope of work, appointing the specialist contractor for maintenance, managing the Defect Liability Period, defect rectification / maintenance and managing with the Main contractor for the common Area and Residence.
• Fit-out Management of Commercial area, Mall area.
 Fit out management for the shell and core area of commercial property, Mall outlets and office areas
 such as Review Approval of Fit out design, site inspection, project schedules, Local Authority approvals,
 Isolation of services for the Fit out installation, testing commissioning of all services in the fit out services, and reinstate the services
 Take over Hand over and closing of fit outs.
 Installation inspection / Materials Inspection / mockup installation as per the IR and its approval, report of materials and verify confirm the storage of the materials as per Manufacturers recommendation.
 follow up and implement of site instruction from the Management
 Supervision inspection of all installation during Construction, and issue of site Memo / NCR if any violation of construction practice / Specifications / shop drawing.
 Testing pre-commissioning and commissioning of all MEP services review of commissioning report.
 Verify and record the contractor’s resources such as daily manpower / equipment’s etc., and reason, location, and the Methods in coordination with the documents controller
 Site inspection and snag report and rectification inspection, weekly / monthly progress report
 • HSE control, Method statement and Risk Assessment, Permit to work organization / implement
• Chair regular weekly / Monthly Progress meetings with the client, PMC, Main Contractor, / Rectification of Tenants Hand over comments / TOC comments,
• Arranging AMC with Specialist system such as Mall Information system/Emergency Lighting / stand by generator system, Fire alarm systems, Lightning Protection system, Elevators and Escalators, CCTV system etc. and Mall retail tenants fit out installation MEP Drawing/Technical review, coordination with consultants and Tenants, and Local authority, site inspection, approval

Design Development Senior Electrical LEAD Engineer at Arcadis
  • Saudi Arabia - Riyadh
  • January 2020 to March 2020

Design teams, Coordinate with Review of shop drawing, Materials/ Technical submittals, Review of RFI, Evaluation of Project progress
Materials Inspection/ supervision of installation during Construction Testing pre-commissioning and commissioning of all MEP services
Evaluation of project Power distribution for Equipment & machinery, Chilled water pump, fire pumps, diesel pumps, stand by generators, ATS, sewage pumps, etc.
Adding new services as per Client requirements, Missing services, adding / improving the services etc,
ACCESS control system, & Gate barriers, Curtain walls.

MEP(Electrical) QA /QC Engineer / DLP Officer at Louvre Abu Dhabi
  • United Arab Emirates - Abu Dhabi
  • January 2019 to December 2019

Review of shop drawing, Materials/ Technical submittals, Assisting in preparation of bill of materials, Material inspection, Review of RFI, Evaluation of Project progress.
Power, Lighting, Earthing & Lightning Protection System, BMS, F/A systems, ELV systems, Lighting control System, Telecommunication systems etc. but not limited.
Materials Inspection/ supervision of Installation during Construction Testing pre-commissioning and commissioning of all MEP services
Equipment & machinery, Chilled water pump, fire pumps, diesel pumps, stand by generators, ATS, sewage pumps, etc.
ACCESS control system, & Gate barriers, Doors, Air Locks, Blinds, Fire Curtain etc
Building Maintenance Unit, Material approval/inspection supervision of Erection inspection, testing pre-commissioning and commissioning
Rectification of Defect reported / complaints registered in the Aconex
Review of repeated complaints of stakeholders and its permanent rectification solutions with contractors.
Management of Defect Liability Period,

Design Development Senior Electrical Engineer at Royal Haskonic LLC
  • United Arab Emirates - Dubai
  • September 2018 to December 2018

Design coordination of
Power, Lighting, Earthing & Lightning Protection System, Stand by generators, ATS, BMS, F/A systems, Lighting control System, Telecommunication systems etc. but not limited.
Preparation of contract drawing, Review of RFI,
Lighting,
building lighting, Street Lighting, Swimming pool Lighting, Emergency Lighting, Aircraft warning light, ID lighting etc.
Power,
HV(11KV) Switch gear, Transformers, Distribution Management system, Transformers 11/0.440 KV -
LV (440V) switch-gear - MCC, SMDB/DB Ch. Water Pumps, firefighting pump, sewage pumps, etc. and stand by Gen sets / ATS -
Low current -
Co-ordinate with supplier for review, CCTV, Video intercom system, Public Address, N.G. control system, BTU Meter, Thermostat, Garbage chute control system,
Telephone,
Coordinate with UTT/ Motorola and UTT sub contractor, MODF/ OTP/ ODT, ONU, Sec. Telecom room, Floor Telecom Room,
Structured cabling, Home automation system, Audio Video systems, Raised floors, Cable trays, riser cable, external Cables, Manhole inside the plot limit etc.
GSM rooms BTS, BBU, RRU, Structured cabling, Cabling, External Antenna & Dome antennas, .
Building Management system,
Inter communication & control of, fire alarm system, generators, Access control system, MDB, MCC, Emergency Lighting, Aircraft waning light, pressurization Fan, Elevators & Escalators, chilled water pumps, sewage & sump pumps,
ELV system
Such as MIS, CCTV, Video intercom, Mall management system, ACCESS control system, & Gate barriers, PA system etc.

MEP Engineer (Electrical) at GAJ international
  • United Arab Emirates - Abu Dhabi
  • January 2018 to August 2018

Design Supervision / Review of shop drawing, Materials/ Technical submittals, Assisting in preparation of bill of materials, Material inspection, Review of RFI, of the following services

Power, Lighting, Earthing & Lightning Protection System, BMS, F/A systems, Lighting control System, Telecommunication systems etc. but not limited.
Stand by generators, ATS, ACCESS control system, & Gate barriers, etc.
Review of shop drawing / Technical submittal as per Project Spec. contract drawing of
Lighting,
Building lighting, Street Lighting, Swimming pool Lighting,
Emergency Lighting, Aircraft warning light, ID lighting etc.
Power,
HV(11KV)
Switch gear, Transformers, Distribution Management system, Transformers 11/0.440 KV -
LV (440V)
Switch-gear, MDB, MCC, SMDB/FDB
Stand by Gen sets / ATS -

MEP / Sr.Electrical Engineer at Hill Internatiional / QP internatinal (JV)
  • United Arab Emirates - Abu Dhabi
  • August 2007 to February 2012

 Site work Supervision / inspection /verification / observation to ensuring the contractors are following / complying project specification / contract drawing /design drawing / shop drawing as per the contract documents, and the Inspection Test Plan
 Site work inspection, Mockup inspection, Materials Inspection as per the IR
 Installation inspection / Materials Inspection / mockup installation as per the IR and its approval, report of materials and verify confirm the storage of the materials as per Manufacturers recommendation.
 Understanding / follow up of the Latest project specification / contract drawing /design drawing / shop drawing and contract documents (including revision / updates) as well as the HSE procedure follow up and implement of site instruction from the Management
 Supervision inspection of all installation during Construction, and issue of site Memo / NCR if any violation of construction practice / Specifications / shop drawing.
 Testing pre-commissioning and commissioning of all MEP services review of commissioning report.
 Verify and record the contractor’s resources such as daily manpower / equipment’s etc., and reason, location, and the Methods in coordination with the documents controller
 Site inspection and snag report and rectification inspection, weekly / monthly progress report
 Monitoring / verifying and conformation of quality and performance and code of practice
 QA/QC Inspection / verification and implement the approved ITP procedure for the quality assurance / quality control and records all the violation
 Monitor the HSE procedure are followed during construction activities, and report all the violations.
 Inspection/supervision of all installation during Construction, of all MEP services, Coordination with civil construction team, surveyor, etc. for opening, sleeves, shafts, finishing works, fire sealant, fire protection etc
 Supervision inspection of all installation during Construction, and issue of site Memo / NCR if any violation of construction practice / Specifications / shop drawing.
  Site inspection and snag report and rectification inspection, weekly / monthly progress report
 Equipment & machinery, Chilled water pump, fire pumps, diesel pumps, stand by generators, ATS, sewage pumps, etc.
 ACCESS control system, & Gate barriers,
 Building Maintenance Unit, Erection inspection, testing pre-commissioning and commissioning with Bureau VERITAS.
 Lift, Escalators, - Supervision during installation, Inspection, Testing,
 Lighting, building lighting, Street Lighting, Swimming pool Lighting, Emergency Lighting, Aircraft warning light, ID lighting etc.
 Power, - HV(22KV) Switch gear, Transformers  Distribution Management system
 LV (440V) switchgear - installation, Testing pre-commissioning, & Commissioning
 Transformers 22/0.440 KV -
 Bus bars - Material inspection, installation,  MCC, SMDB/DB Ch. Water Pumps, firefighting pump, sewage pumps, etc. and stand by Gen sets / ATS - Material inspection, installation
 Low current - installation, of CCTV, Video intercom system, Public Address, N.G. control system, BTU Meter, Thermostat, Garbage chute control system,
 Telecommunication system, installation, mock up approval, from UTT for POP room/ MODF/ OTP/ ODT, ONU, Sec.
 Building Management system,
 Inter communication & control of, fire alarm system, with all other MEP services
 Earthing - Installation of Earth pit, rod, & cable, Earth bar, Earth link, etc.
 Lightning Protection system -
 Cathodes Protection system.
 Firefighting - FM 200 system, Checking, Verifying the integrity, Testing, witnessing integrity test, testing the FM 200 panels, safety systems, etc.
 Fire hydrants systems, Carbon monoxide systems
  Preparation of daily, Weekly, Monthly progress reports / payment certificate, etc. and submit ARE, RE, PM.
 Evaluation of Project progress & approval of Payments
  Review AS built Drawing

Project Engneer at Al Tanaf Electricals
  • United Arab Emirates - Dubai
  • May 2006 to July 2007

 Preparation of Tender documents, Drawing, Estimation, Material Approval, supervision, work scheduling, evaluation of Work progress, Erection, Testing Commissioning
 Coordination with Design teams, for the Review of shop drawing, Materials/ Technical submittals etc.
 Assisting in preparation of bill of materials, Procurement of Material inspection / approval.
 Coordination with consultants / Client for the Approval of Drawing / MOS / Materials etc.
 Preparation of shop drawing, Materials/Technical submittals, Material inspection of building lighting, Street Lighting, Swimming pool Lighting, Emergency Lighting, Aircraft warning light, ID lighting etc.
 Site supervision of installation during Construction with Site Supervisor / Engineer
 Inspection / approval, supervision of installation during Construction, in Coordination with consultants / Client
 Testing pre-commissioning and commissioning of all services.
 Evaluation of Project progress & invoicing for Payments
 Preparation of Weekly, Monthly, reports, submit P. M.

Education

Bachelor's degree, Bachlers degree
  • at Brooks Fargo University, USA
  • August 2014
Higher diploma, Bachlers degree
  • at Kerala state board of Technical Education, Thiruananthapuram,
  • October 1976

Specialties & Skills

Maintenance
Inspection
Commissioning
Testing
Material inspection, supervision of Erection during Construction, Inspection, Testing, and commissio

Languages

English
Expert
English
Expert
English
Expert
Hindi
Expert
Arabic
Beginner

Training and Certifications

PMP (Training)
Training Institute:
Chickago Training Center Abu Dhai
Duration:
40 hours

Hobbies