Total Years of Experience: 16 Years, 10 Months
June 2019
To Present
Consultant
at M/s. WSP - KTCB Consulting Company
Location :
Kuwait - Al Kuwait
www.wsp.com
1.1) Project name: Construction, Completion & Maintenance of Road works, Networks of Infrastructure Services
for plots & Electrical Substations fir Neighborhoods (N1, N2, N3 & N4); Contract No : PAHW-C 1327, PAHW-C
1328 (Al Mutlaa Housing City)
1.1) Project name: Construction, Completion & Maintenance of Road works, Networks of Infrastructure Services
for plots & Electrical Substations fir Neighborhoods (N1, N2, N3 & N4); Contract No : PAHW-C 1327, PAHW-C
1328 (Al Mutlaa Housing City)
May 2015
To May 2019
Materials Engineer
at M/s Combined Group Contracting Company
Location :
United Arab Emirates
www.cgc-kw.com
June 2011
To January 2015
QA
at M/s. Mushrif Trading & Contracting Company
Location :
Kuwait
3.1 ) Project name: Construction, Completion and Maintenance of Interchanges on Main Highways- Jahra
Motorway Connecting to Jahra & South Doha Areas, M.P.W contract no: RA/185. (Interchanges- 2, 10 & 8)
Project details
Construction of:
Lowered carriageway with RCC slabs on tension pile system / Retaining wall supported on pile system / Double span box
girder high level bridges / Single cover loop road work / Road works for round-about.
Project Value: KD 21 Million.
3.2) Project Name: Construction, Completion & Maintenance of Remote motoring & Control center, for facilities of
sewage network in Kuwait, M.P.W contract no: SE/66
Project details
Construction of:
Central telemetry building at a plot area of 109, 040 m2. The work mainly comprises of Telemetry building, Environmental
building, Purification & water resource building, earthwork, landscaping, mechanical & electrical works.
Project Value: KD 16 Million
3.3) Project Name: Construction, Operation & Maintenance of T.S.E networks & Reservoirs for Project Area C1,
M.P.W contract no: SE/80
Project details
Construction of:
Reservoirs & pumping stations / Construction works for DI pipes of length 55km / Installation of pumps & related MEP
works / Micro tunneling works / Instrumentation, SCADA & Electrical works.
Project value: KD14 million
3.4) Production plant for Asphalt & Concrete
Production of Concrete: Grades K-140 to K-500, Mortar, Screed, Light weight concrete & GGBS based concrete
Asphalt: Type-1, 2, 3 & PMS, MC-70 & Tack coat
Page: 4/7
Responsibilities undertaken:
Handled multiple responsibilities within the company as quality control, materials engineer & site quantity surveyor.
Reporting to: Project Manager & QA/QC Manager
1. Quality Assessment & Quality Control
* Preparation of project quality plan with reference to company management structure & contract requirements.
* Preparation of ITP & check list.
* Introduced document control software’s for real time & easy access during works. Well versed with acronex & PM web
software’s.
* Coordinating with site engineers for site work inspection & arranging look ahead & review weekly meetings with site
team to achieve maximum quality without loss of time.
* Review & signing off for test reports on materials tested within the project & with external agency.
* Ensure all works correctly implemented before inspection being undertaken & coordinating with client / consultants for
final inspection with official request.
* Review weekly inspections status, prepare suggestions for improvement & conduct meetings with execution team to
achieve ‘zero rejection goal’.
* Coordinating & supervising with site engineers & supervisors for quality related work procedures.
* Coordinating with contract administrator-QS & QA/QC manager for any unresolved / critical issues that may become
as breach of contract or affect the project with extra cost / time implications.
* Conducted internal audit based on ISO 9001:2000 procedures with reference to company IMS.
* Preparation of measurable objectives of the project in coordination with internal departments.
* Preparation of snag list & conducting project close down meetings together with all key department heads.
Motorway Connecting to Jahra & South Doha Areas, M.P.W contract no: RA/185. (Interchanges- 2, 10 & 8)
Project details
Construction of:
Lowered carriageway with RCC slabs on tension pile system / Retaining wall supported on pile system / Double span box
girder high level bridges / Single cover loop road work / Road works for round-about.
Project Value: KD 21 Million.
3.2) Project Name: Construction, Completion & Maintenance of Remote motoring & Control center, for facilities of
sewage network in Kuwait, M.P.W contract no: SE/66
Project details
Construction of:
Central telemetry building at a plot area of 109, 040 m2. The work mainly comprises of Telemetry building, Environmental
building, Purification & water resource building, earthwork, landscaping, mechanical & electrical works.
Project Value: KD 16 Million
3.3) Project Name: Construction, Operation & Maintenance of T.S.E networks & Reservoirs for Project Area C1,
M.P.W contract no: SE/80
Project details
Construction of:
Reservoirs & pumping stations / Construction works for DI pipes of length 55km / Installation of pumps & related MEP
works / Micro tunneling works / Instrumentation, SCADA & Electrical works.
Project value: KD14 million
3.4) Production plant for Asphalt & Concrete
Production of Concrete: Grades K-140 to K-500, Mortar, Screed, Light weight concrete & GGBS based concrete
Asphalt: Type-1, 2, 3 & PMS, MC-70 & Tack coat
Page: 4/7
Responsibilities undertaken:
Handled multiple responsibilities within the company as quality control, materials engineer & site quantity surveyor.
Reporting to: Project Manager & QA/QC Manager
1. Quality Assessment & Quality Control
* Preparation of project quality plan with reference to company management structure & contract requirements.
* Preparation of ITP & check list.
* Introduced document control software’s for real time & easy access during works. Well versed with acronex & PM web
software’s.
* Coordinating with site engineers for site work inspection & arranging look ahead & review weekly meetings with site
team to achieve maximum quality without loss of time.
* Review & signing off for test reports on materials tested within the project & with external agency.
* Ensure all works correctly implemented before inspection being undertaken & coordinating with client / consultants for
final inspection with official request.
* Review weekly inspections status, prepare suggestions for improvement & conduct meetings with execution team to
achieve ‘zero rejection goal’.
* Coordinating & supervising with site engineers & supervisors for quality related work procedures.
* Coordinating with contract administrator-QS & QA/QC manager for any unresolved / critical issues that may become
as breach of contract or affect the project with extra cost / time implications.
* Conducted internal audit based on ISO 9001:2000 procedures with reference to company IMS.
* Preparation of measurable objectives of the project in coordination with internal departments.
* Preparation of snag list & conducting project close down meetings together with all key department heads.
April 2010
To April 2011
Site Engineer
Project details
Construction of:
Reservoirs below ground level (Nine reservoirs of capacities 7 MIG, 21MIG & 25 MIG) / Pumping Station /
Accommodation Building / Chlorination Building / Switch Gear Building / Inlet & Outlet Chambers for reservoirs.
Project Value: QR.750 Million
Responsibilities undertaken:
Reporting to: Project Manager
* Planning for manpower & materials as per schedule given by project manager.
* Allocating manpower & machinery according to priorities.
* Detailing drawing & studying for any practical problems involved in execution.
* Preparation of bar bending schedule & quantity surveying.
* Coordinating with supplier for timely delivery of permanent & temporary materials.
* Quality inspection of work with consultant with specification & drawings.
* Preparation of weekly & monthly progress reports for the allocated area.
* Coordination with MEP departments during & after construction works.
* Cost analysis of manpower/hr & equipment/hr.
5. M/s. Tokyo Engineering Consultants Consortium.
With consortium members: Black & Veatch (UK), GKW Consult (Germany), STC & CED (India).
Client: M/s. Kerala Water Authority. Contractor: M/s. IVRCL Infrastructures & Projects Limited & M/s. Degremont Consortium.
Email: kwsptvpm@asianetindia.com
5.1) Project name: JICA- (JBIC) assisted Kerala Water Supply Project (Package IV& I).
In location: Thiruvananthapuram, India.
Construction of:
Reservoirs below ground level (Nine reservoirs of capacities 7 MIG, 21MIG & 25 MIG) / Pumping Station /
Accommodation Building / Chlorination Building / Switch Gear Building / Inlet & Outlet Chambers for reservoirs.
Project Value: QR.750 Million
Responsibilities undertaken:
Reporting to: Project Manager
* Planning for manpower & materials as per schedule given by project manager.
* Allocating manpower & machinery according to priorities.
* Detailing drawing & studying for any practical problems involved in execution.
* Preparation of bar bending schedule & quantity surveying.
* Coordinating with supplier for timely delivery of permanent & temporary materials.
* Quality inspection of work with consultant with specification & drawings.
* Preparation of weekly & monthly progress reports for the allocated area.
* Coordination with MEP departments during & after construction works.
* Cost analysis of manpower/hr & equipment/hr.
5. M/s. Tokyo Engineering Consultants Consortium.
With consortium members: Black & Veatch (UK), GKW Consult (Germany), STC & CED (India).
Client: M/s. Kerala Water Authority. Contractor: M/s. IVRCL Infrastructures & Projects Limited & M/s. Degremont Consortium.
Email: kwsptvpm@asianetindia.com
5.1) Project name: JICA- (JBIC) assisted Kerala Water Supply Project (Package IV& I).
In location: Thiruvananthapuram, India.
April 2008
To April 2010
Consultant
Project details
Construction of Packages 1 & 4 includes:
Overhead Service Reservoirs (7 OHSR, Capacity up to 7.60 ML) / Ground Level Service Reservoir (3 GLSR, Capacity up
to 7.98 ML) / Telemetry Outstations, Re-chlorination Buildings & Booster Pumping Stations / Training Centers & Hostels
(supported on load bearing pile system) / Water Treatment Plant (WTP with a capacity of 72 MLD with Pulsator Clarifier &
Aquazur V filter / Rapid Gravity Sand Filter designed by M/s Degremont Consortium.)
Project Value: INR 324 Cores.
Page: 6/7
Responsibilities undertaken :
Reporting to: Sr. Section Engineer (Pkg. # 4)
* To conduct preliminary surveys, setting out works, handling over the site & supervising contractor’s engineers to work
according to the plans and specifications in the contract.
* Control contractor’s performance by verifying daily progressive reports on materials, manpower input, completed
activities, work procedures & keeping project schedule in conformance with the technical requirements, specifications
and contractual obligations.
* Site work inspection and follow-up through work inspection request and visits.
* Testing of materials used in construction activities based on the code of practice in periodical intervals as per the
conditions made in the contract & review of shop drawings submitted by the contractors for construction contracts.
* Coordinating with design engineers for any structural changes made in the shop drawings as per site conditions.
* To ensure rebar’s laid considering seismic design for Zone III, Trivandrum city & structural rigidity parameters not
being violated considering max shear & moment areas in the structure, to supervise & inspect during concreting.
* To conduct post concreting inspection for any deviation from standard & drawings.
* Review of monthly quality performance and documentation to the client.
* Recording measurements and preparation of contractors running account bills & E- bills based on the bill of quantities
& site measurement.
Additional Experience in Building Infrastructures
Construction of Packages 1 & 4 includes:
Overhead Service Reservoirs (7 OHSR, Capacity up to 7.60 ML) / Ground Level Service Reservoir (3 GLSR, Capacity up
to 7.98 ML) / Telemetry Outstations, Re-chlorination Buildings & Booster Pumping Stations / Training Centers & Hostels
(supported on load bearing pile system) / Water Treatment Plant (WTP with a capacity of 72 MLD with Pulsator Clarifier &
Aquazur V filter / Rapid Gravity Sand Filter designed by M/s Degremont Consortium.)
Project Value: INR 324 Cores.
Page: 6/7
Responsibilities undertaken :
Reporting to: Sr. Section Engineer (Pkg. # 4)
* To conduct preliminary surveys, setting out works, handling over the site & supervising contractor’s engineers to work
according to the plans and specifications in the contract.
* Control contractor’s performance by verifying daily progressive reports on materials, manpower input, completed
activities, work procedures & keeping project schedule in conformance with the technical requirements, specifications
and contractual obligations.
* Site work inspection and follow-up through work inspection request and visits.
* Testing of materials used in construction activities based on the code of practice in periodical intervals as per the
conditions made in the contract & review of shop drawings submitted by the contractors for construction contracts.
* Coordinating with design engineers for any structural changes made in the shop drawings as per site conditions.
* To ensure rebar’s laid considering seismic design for Zone III, Trivandrum city & structural rigidity parameters not
being violated considering max shear & moment areas in the structure, to supervise & inspect during concreting.
* To conduct post concreting inspection for any deviation from standard & drawings.
* Review of monthly quality performance and documentation to the client.
* Recording measurements and preparation of contractors running account bills & E- bills based on the bill of quantities
& site measurement.
Additional Experience in Building Infrastructures
January 2007
To May 2008
site engineer
at B.E Billimoria Construction Company
Location :
India - Chennai
Share on Facebook
Share on Twitter
Share Via Email