مهندس مدني أول (حاسب كميات)
مكتب دار الرياض للإستشارات الهندسية
Total years of experience :31 years, 6 Months
Act as P.M. for two projects (Building - Infra Structures),
with the following responsibilities:-
(Managing all activities in both sites as (Reviewing and approving any drawings and shop drawings presented
by the contractor with my team - letters for or from client or
contractor, concerning all activities of sites…etc)).
-Quantity Surveyor (As a title), responsible for :-
*Checking and Reviewing all contractor's:- (calculations, Invoices,
Change Orders, Additives & Reductions….etc).
-But the primary goal is to follow-up repair works:- (Observing &
Determining all elements need for repair, follow up all steps of
repairing works, And preparing proper reports to the client.
Representing the owner (M.O.H.) in its projects, In doing the following:-
-Checking out the report data for repair works for Qurayat project
-Preparing and updating data to all M.O.H. projects,
and so many administrative work related to these projects.
Steel structure works (Stores-Factories-Administrative Buildings-Fence...), plus :-
-Receipt and review borders, dimensions and drawings.
-Review and matching drawings (Civil & Arch.) for projects.
-Review and inspect implementation of the work, according to the schedule.
-Document Control all surveying files, for all (projects - Instruments - surveying crews).
-Auditing (with each group in each site) the survey filing (calibrations certifications of all surveying instruments in site -calculations of work - needs of site - schedule of work -…etc.).
-One of the owner's crew members, responsible for handing over projects(Buildings-villas-Steel structure for Brands stories) from contractors after execution, plus :-
1-Receipt and review borders, dimensions and drawings for all sites
2-Receiving and reviewing modified layouts of Alligria project
-Receipt and review borders, dimensions and drawings.
-Review and matching drawings (Civil & Arch.) for villas.
-Review and inspection of the implementation of the work, according to the schedule.
-Preparing data & sketches for survey crews to set out points coordinate for different activities of villas.
-Document Control and filing all surveying data for (calibration certifications of all instruments in site -calculations of work - needs of site - schedule of work - crews - ….etc.).
Worked as a trainer, teaching students how to do surveying works such as:-
Making Cadastral Maps - Making Topographic Maps.
1-Projects name :-
*Holiday inn Resort In Sharm El-Sheikh - Sinai - Egypt.
*Mall - Talaat Harb - Cairo - Egypt.
*Warehouses tanks (Steel Structure Building)- Suez & Ismailia- Egypt.
2-Scope of work :-
Residential Buildings - Swimming Pools - Hotel - Health Club - Administration Building - Staff Houses - Roads….etc.
3-Role in this projects :-
-Receipt and review Borders -Dimensions and Drawings.
-Review and matching drawings (Civil & Arch.).
-Review and inspection of the implementation of the work, according to the schedule
-Preparing data & sketches, for survey crews to set out points coordinate for different activities of all project Elements.
-Making the skeleton of the Mall (Front & Side Faces).
-Solve some problems.
-Q.C. for surveying works.
-Excavation works - pouring O.C. - R.C. for Transformers Footings - Metal Finishing (for the warehouses Projects).
-Pouring O.C. & R.C. for footings of transformers (for the power station).
-Implementation of (4) staff housing buildings.
-Implementation of Fence - Guard Room - Roads…etc.
*Naama Bay Resort in Sharm El-Sheikh + International Conference Hall.
Brief description for this Project
Residential Buildings (contains (216) villas round a golf course of (16) holes)
International Conference Hall, Infra structures, Roads….etc
Hotel + Staff Housing Buildings + Pools.
Worked as a Consultant Eng. supervising the following:-
Naama Bay Resort in Sharm El-Sheikh (of 216 villas round a golf court).
international conference hall
Sewer Treatment Station, serving green areas in previous projects.
2nd Line of Cairo Greater metro in, in the following sites:-
*Orabi Workshop, maintenance workshops (Steel Structure Buildings)
*El-Khalafawy Underground Metro.
*Saint Theresa Underground Metro.
utilities for (Under platform - platform - Mechanical floor - ticket floor - all escalators Finishing).
Planning, monitoring and delivery of all finishing works for the station of architectural finishing works - electrical work - mechanical work - the work of marble and ceramic .... etc.
Kuwaiti Group Tower in El-Zamalik
Working as a pile Engineer.
*Pile Eng.(setting out the location of pile axe)
•Worked as a Site Eng. In the following pro.-
•El-Khanka sewer station (contract 16/2).
• (El-Hebail sewer station-holyday inn -villa) in Luxor…&so on.
•Working as P.M. in the following projects :-
Switzerland & Canadian Embassies in Cairo…and so on.