piping engineer
Oilserv , Oilfield Services CompanyProject ; Mobil Oil Train Desalter(Exxon Mobil)
Total years of experience :23 years, 9 Months
Site Monitoring and Supervision
As Built of Iso. Drawing
Monitor construction activities
Daily work status report .Flange Management
Inspection and Monitor of Plant Piping Contruction for Refinery project under Aramco
Monitor and Inspector contruction of GOSP plant under Aramco
Site Piping Inspector for Plant construction.Monitor construction activities.Doing some punch list.witness of hydro testing.
NDT inspection UT/MPI on completed weld
Checking of laminar thickness after welding
Checking of crack after welding using MPI
Checking of fit-up before welding.
Visual inspection after welding
Coordinate w/ the client during inspection
Update daily welding report on the portal
Visual inspection on all jacketed platform
Inspection of welding consumables as per client advice
Ensure WPS, WQT, ITP was review before welding
Inspection of Pearl GTL Refinery Project under Shell Qatar.Doing some punchlist and line check prior to hydrotest.
Site surveillance and monitoring
Signing of Test Pack before and after test.
Witnessed at site during hydro test.
Line checking before and after test.
Inspection of Valve, Flange and Fittings
Monitor daily activity of Sub contractor
Review and Check NDT documents like ITP, WPS, PQP, WQT
Ensure quality requirements was implemented in all construction activities
Prepare test package.
Line check before and after test.
Site walkthrough w/ client
Line check during installation. checking of
Levelness, orientation.
Site as built.
Monitor daily piping Installation activity
Enforce work safety activities at construction
Discuss quality deficiencies w/ QC Manager and Construction contractor
Report major Contractor performance and quality deficiencies
Meeting with EPC contractor
Prepare surveillance report during piping installation
Daily site monitoring of piping activities
Inspection of valves, flanges, pipe support before installation
Site piping modification(as built)
Line checking for completeness
Responsible in field supervision, execution and coordination at site
Ensure that codes and standard shall be used during construction
Checking and Inspection during Fit up
Update daily welding /fit up status
Material take-off
Checking of piping orientation during installation
Witness and check of pressure during hydro test
Monitor daily welding activity
Inspection of fit-up works internal and external of pipe.
Inspection of complete weldment.
Checking of welding clearance during fit-up.
Visual the inspection of root pass and cover pass.
Checking inside diameter of pipe of both sides its cleanliness, thickness.
Checking of electrodes before fit-up.
Checking of isometric orientation during fit-up.
Checking of beveling and roundness of pipe.
Coordinate with Piping Supervisor during inspection.
Make daily report on inspection works.
Responsible for as built at urea and ammonia area.
Responsible for the installation of 1” shell side and downstream line.
Supervise the spading of line by checking of spading point.
Lifting and take-out of strainer for internal inspection.
Requesting DPT and RT of finishing welds.
Responsible for the cutting of 66” line for the installation of new manhole of 20”
Assist MLNG inspector for the inspection of fit-up of new 20” man way.
Supervise for the cutting of hand hole top, bottom, and middle flat form.
Coordinate with the MLNG supervisor in checking of tubes inside
Pressure test (leak test) on tubes at 1 bar
Prepare documents for signing of pressure test.
De-spading of lines and box up.
Checking of pipe alignment during fit-up
Make daily report on daily inspection work
Responsible for inspection of sulfinol lines 36”
Inspection of fit-up works, internal and external of pipe
Coordinate with piping supervisor during inspection
Checking of isometric orientation during fit-up.
Do traceability report of pipe spool.
Checking the dimension of nozzles from center to center.
Prepare test package for testing.
Checking of material before fit-up.
Fab.)
Inspection of fit-up works in fabrication
Inspection of fit-up by checking its clearance, internal diameter, thickness.
Checking of WPS before welding
Checking of pressure during hydro test
Checking its bevel and roundness of pipe
Inspection of inside of the pipe of its cleanliness
Visual inspection of root pass and cover pass
Make report on daily inspection works
Coordinate with piping supervisor during inspection
Responsible of controlling of all material that was received.
Checking of packing list upon receiving of material.
Expedite material that was not received.
Checking of material status every week.
Updating of daily material received and issued.
Responsible of ordering local purchase material.
Checking of isometric drawing bill of material before issuing.
Have a weekly report of received and issued material.
Prepare isometric drawing for fabrication work.
Check isometric drawing before distributing.
Check material on bill of material list at isometric drawing.
Check material specification, line class, thickness, material class, etc.
Make daily and weekly progress report.
Compare actual to plan base on schedule.
Make necessary revision as per site request.
Check fabrication work each of every worker.
Have a Daily Work Report each of every worker.
Have a Safety Meeting every week.
Inspection in the installation of piping of Sulfinol, Nitrogen,
Sour Gas & Steam Line base on Isometric and Plan drawings.
Checking of Flange rating (Pressure and Temp.)
Checking of wall thickness specified in the individual piping
material classes in accordance with ASME B31.3.
Examine design pressure and temperature, their normal size
and wall thickness base on piping classes.
Inspection of valve rating during installation.
Make daily erection report of fit-up spool.
Inspection of erected spool during fit-up. Module 5
All this base on construction specification.
Review test package.
Inspection if installed pipe spool of area 300 & 600.
Checking of line class, dimension.
Schedule of pipe before erection.
Inspection of spool before erection.
Orientation of fitting materials base on isometric drawing.
Checking of heat no., Mesc. No., Material specification.
Inspection of flare line of 36”dia.
Checking of welding clearance before fit-up.
Make report of pipe for PWHT, RT, and for hardness test.
Checking of cutting list of piping material.
Do trace ability report for pipe at fabrication
All Isometric & Plan Drawing base on construction specification.
Piping and Structural Fabrication. For MHI
During my engineering days as a student I was involved in extra curricular activities by playing soccer,also my project as Mechanical Engineering student I design a mini power plant for our engineering building.
courses: Registered Mechanical Engineer No.- 0037256