Total years of experience :16 years, 3 Months
Hydro Jetting, Hydro Milling, Catalyst loading and unloading, Chemical cleaning and Decontamination Services for all ARAMCO, SABIC, SADARA, MAADEN and Saudi Electricity affiliates
- Clean Fuel Pipe Lines Project (24Inch & 30Inch ) Inside Ras Tanura ARAMCO Refinery, Causeway and Terminal.
- Total 70 KM of Pipe Lines in Brown Field.
- Ensure following ARAMCO Quality and Safety Standards.
- Setting a budget for the project. Review and develop P&L monthly reports for the project and ensure that the expenses are meeting the budget. Monitoring budget reports.
- Maintains open communication with contractors, works with Superintendents to recognize underperforming subcontractors timely with project notifications.
- Manage the day-to-day working, utilization, implementation and technical consultants engaged on client assignments. From ensuring the correct material turns up before a job, to explaining the work ethics and activities to colleagues and contractors.
- Report progress on projects by suitable media to sector management, maintain and update project reporting, checkpoints and financial reporting to a high standard.
- Develop subcontracts, technical and commercial evaluate quotations, monitor contractors’ daily progress, technical and execution guide to project team and contractors.
- Develop contacts with senior staff, directors, and other influential staff within each account during the implementation phase.
- Co-ordinate required support levels and training.
- Produce reports on each project at agreed intervals, and whenever substantive actions are required.
- Arranging and leading on regular team and contractors’ meetings including and not limited to Daily construction coordination meeting, Weekly departmental Constraints meeting and Weekly progress meeting.
- Monitor the mobilization of resources as per the EAC.
- ARAMCO OMPP 80 Gas, Oil and Water Injection wells.
- Total 400 KM PipeLines / Flow Lines underground and above ground.
- ARAMCO Master Gas Pipeline Project, 56Inch underground Pipeline 198 KM
- Maintains open communication with contractors, works with Superintendents to recognize underperforming subcontractors timely with project notifications.
- Manage the day-to-day working, utilization, implementation and technical consultants engaged on client assignments. From ensuring the correct material turns up before a job, to explaining the work ethics and activities to colleagues and contractors.
- Report progress on projects by suitable media to sector management, maintain and update project reporting, checkpoints and financial reporting to a high standard.
- Develop subcontracts, technical and commercial evaluate quotations, monitor contractors’ daily progress, technical and execution guide to project team and contractors.
- Develop contacts with senior staff, directors, and other influential staff within each account during the implementation phase.
- Increase East-West Pipeline Capacity Project inside 11 Pump stations and 2 Pressure Reducing Stations.
- Installing 11 Drag Reducing Stations and Daylight 48 Inch Piping inside the Pump stations.
- Interface coordinator with the client (ARAMCO).
- Manage GCC’s planning team on issuing the invoices and Baseline Schedule.
- Monitoring Engineering deliverables, activities and man-hours.
- Submission of all client deliverables.
- Review and Supervise 5 Camps in Engineering and Construction.
- Manage EPC invoices and approval client (ARAMCO).
- Analyze/Monitoring Saudization percentage.
- Contractual reviewing/Monitoring subcontractors’ activity execution.
- Facilitate HAZOP studies, Risk Management implementation, Schedule Optimization, Constructability studies … etc.
- Managing the procurement cycle.
- Review all subcontractors’ commercial/technical bids.
- Manage Resources control (Manpower & Equipment) to meet the execution rates during the project phases.
- Analyze progress for all subcontractors, review progress reports.
- Monitoring vendors’ delivery dates.
- Member of the cost control team (forecasted expenses, manpower).
- Focal point: for any issue regarding procurement, safety and management.
- Certified as a Work permit receiver.
- ARAMCO ID no. 8072571.
Installation of two Fixed Roof Tanks in Marsa Allam airport. A1 Jet Fuel Tanks
Installation of full pump station of A1 Jet Fuel in Marsa Allam Airport
CLIENT: CHEVRON AVIATION
Responsible for erection two vertical raw mills
1- Installation of Beni Suif Cement Company Rotary Kiln
2- Installation of 3 fans system in Tabuk Cement Company
3- Installation of Steel Structure in SWCC Jeddah KSA
4- Installation of 3 silos in AlMinyah Cement Compnay
Responsible for erection Rotary kiln in WAAD AL SHAMAAL cement company
Graduation Project: Fire fighting Tasks: 1-foam firefighting 2-petroleum tanks fire fighting systems design 3-practical fire fighting project 4-sprinkle system 5-CO2 gas fire fighting system
Financial, Interface, HR, Albert Theory, Fish Bone analysis, Portfolio Management, PMP, Stakeholders Satisfactory and Communication with clients