Total years of experience :26 years, 4 Months

Civil Engineer at TEKFEN Construction
  • Qatar - Doha
  • March 2019 to June 2023

Project: Design and Build of Al Khor Expressway Project

This project includes the construction of 32.5 km Road Asphalt Pavement- 4 lanes dual carriageway, 9 Interchanges with 7 bridges, 9 underpasses, 7 pedestrian bridges, 11.567 km. box culverts, 47 km. Link Roads & Frontage Roads, 48km. Drainage Pumping Station, Potable Water Pipeline Works, 95Km TSE Pipeline Works. (Project Cost: 2 Billion US Dollar, Client: ASHGHAL)

Duties and Responsibilities:
 Prepare daily Inspection Request (INR) for pavement works such as subbase, road base, and asphalt work and expedite the close-out.
 Prepare daily accomplishment site progress report from day to day.
 Prepared Bi-weekly Schedule and submit to the supervision consultant.
 Check sub-contractor’s Interim Payment Certificate as per site progress accomplishment.
 Closely coordinated with other discipline engineers for smooth implementation of the project.
 Perform other tasks as assigned by the Pavement Manager.

Civil Engineer (Bridge/Structure) at Daewoo Engineering & Construction Co., Ltd
  • Qatar
  • March 2017 to February 2019

Construction and Upgrading of E-Ring Road North/South Link (P008-C2

This project includes the construction of 7 km Road Asphalt Pavement- 4 lanes dual carriageway, 3 Interchanges with 7 bridges, 9 underpasses, 7 pedestrian bridges, 11.567 km. box culverts, 47 km. Link Roads & Frontage Roads, 48km. Potable Water Pipeline Works, 95Km TSE Pipeline Works. (Project Cost: 732.58 Million US Dollar, Client: ASHGHAL)

Duties and Responsibilities:
•Supervise and control site works such as bored piling works, bridge foundation and superstructure works, ITS Gantry Foundation and Truss Structure, Counter Balance Slab and adhere to Health, Safety and Environment.
•Prepared 3-Weeks Look- Ahead schedule, Inspection Request, communication letter.
•Prepared Method Statement relevant to the Bridge/Structure construction and Inspection Test Plan (ITP).
•Prepared quantity estimate of materials to be purchased and monitor the delivery as per project schedule.
•Thoroughly checked and reviewed shop drawings prior to site implementation.
•Tracked and monitored project status and reported to the Construction Manager any delay incurred.
•Checked and monitored Sub-contractors’ progress accomplishment against project schedule.
•Attended coordination meeting with the Sub-contractors and resolved any problem issues arise to avoid delay of the project.
•Prepared correspondence to the sub-contractors, client, and other agencies involved in the project.
•Checked and valuated progress claims of the Sub-contractors and recommended for payment.
•Coordinated with other discipline engineers for smooth implementation of the project.
•Assisted the Construction team in interpretation and analysis of construction documents
such as Drawings, Specifications, Method Statements, ITP (Inspections & Test Plan) Checklists.

Civil Engineer at Tekfen Construction
  • Qatar - Doha
  • April 2009 to February 2017

Projects Involved:

1. Qatar Primary Routes, North Road Projects (Contract 2 & 3) - completed
These projects includes the construction of 98.2 km Road Asphalt Pavement- 4 lanes dual carriageway, 20 Interchanges with 20 bridges, 3 underpasses, 6 camel crossings, 11.567 km. box culverts, 47 km. Link Roads & Frontage Roads, 48km. Potable Water Pipeline Works, 95Km TSE Pipeline Works. (Project Cost: 732.58 Million US Dollar, Client: ASHGHAL)

2. Al Rufaa Street (Ceremonial National Day Road) Project - completed
This project was a 1-year fast track flagship project by the Emir of Qatar involving 12 km. road asphalt pavement- 3 lanes dual carriageway, 27 km. frontage roads and link roads, 2 vehicular underpass, 4 pedestrian underpass, 9 Km-bicycle lanes on both sides, 8.5km walkway on both sides, Utilities (Q-Tel, ITS, TSE), Street Lightings, Landscaping, Irrigation Works. (Project Cost: 149 Million US Dollar
Client: PEO - Private Engineering Office)

3. Additional Completion Work for North Project (Contract C2011/27) - completed
This project includes the construction and upgrading works of around 27 km. urban roads network surrounding the north road comprising dual carriageway with 3 and 2 lanes plus service roads/parking in each direction. Utility Work (Q-Tel, ITS, TSE), Street Lightings, Landscaping Works, Irrigation Works (Project Cost: 295 Million QR, Client: ASHGHAL)

4. Design & Construct Service Road Enhancement to North Road Corridor (Project P059) - Completed
A design and construct services roads and link roads on both sides of the North Road Corridor from Km. 3+000 (Duhail) to Km. 96+200 (Al Shamal) to enhance the existing interchanges and frontage roads. Additional Bridges on Interchange, Directional Link Bridge, Underpass, Footbridges will also be constructed to accommodate the volume of traffic by the year 2030. (Project Cost: 3, 295, 149, 957.13 QR, Client: ASHGHAL)

Duties and Responsibilities:
 Successfully handled the Tendered Quantity Estimates preparation of Civil Works and BOQ of AL RUFAA Street (Celebration National Day Road Project -12 Km).
 Assigned in Pavement Works. In-charge in preparation of Request for Inspection (RFI) and Daily Accomplishment Report.
 Track and monitor asphalt pavement status including procurement of GABBRO aggregates and bituminous materials to avoid delay of the project implementation.
 Supervised road asphalt paving works conforming to project plans and specifications requirements.
 Check availability of materials, equipment, and manpower to ensure target schedule are met within allowable budget.
 Ensure that workers are properly using tools and equipment safely and proper Personal Protective Equipment is being used.
 Ensure that qualities of works are met within project schedule and budget.
 Coordinate with other discipline engineers for smooth implementation of the project.
 In-charge in preparation of back-up quantity calculations for Aggregate Base Course and Asphalt Works (Bituminous Prime Coat, Bituminous Tack Coat, Asphalt Base Course, Asphalt Intermediate Course, and Asphalt Wearing Course) for Interim Progress Claims to be submitted to the client for approval.
 Check, Valuate, and Process Subcontractors and Suppliers monthly invoice.
 Perform other tasks as assigned by the Pavement Manager.

Civil Inspector at Gulf Engineering & Industrial Consultancy (GEIC)
  • Qatar
  • December 2007 to February 2009

Project: P-2007/43:10 Nos. Kindergarten School Projects within Doha & its Villages, Package 2, Site Nos. 11-20
This project was the construction of 10-units with 6 Class rooms School Buildings with Ancillary Buildings (Guardhouse, Substation, Store Room) including Pre-cast Perimeter fence, Water Supply, Plumbing Works, Electrical, School Asphalt Road, Landscape and Irrigation Works. (Project Cost:16 Million QR
Client: ASHGHAL)

Duties and Responsibilities:
•Successfully completed the Projects assigned from Layout to Finishing Works.
•Monitored strictly the quality of works of the Contractor in compliance with the project specification and to their submitted Quality Plan.
•Monitored, checked, and recommended for approval the Materials Inspection Request (MIR) on the delivered materials at site if it conforms as per approved sample in accordance to the specification.
•Checked and evaluated the submitted method statement of the Contractor and submitted for Project Manager’s recommendation for approval by the Client.
•Checked and evaluated submitted shop drawings and recommend them for approval by the Client.
•Conducted inspection for the submitted Request for Inspection (RFI) by the Contractor for any Civil/Structural & Architectural inspection.
•Reported directly to the Project Manager any non-compliance on the specification from the work of the Contractor and make necessary recommendation to rectify the defective works.
•Implement safety at site and monitor if the Contractor is following the submitted and approved Safety Plan.
•Coordinated with other discipline engineers for smooth implementation of the project.
•Conducted the snag listing prior to handover of the project to the Client.
•Assured that project execution is in accordance with policies, procedures, systems, and requirements approved by the Client.
•Advised and assisted the Project Manager on contractual and commercial issues when and where required.
•Attended site visits for jointly site measurements together with the Main Contractors/Consultants.

Senior Office Engineer at Heavy Industries & Construction Co., Ltd
  • Philippines
  • March 2007 to December 2007

Project: HHIC-PHIL SUBIC SHIPYARD PROJECT, Cawag, Subic, Zambales, Philippines

This project was the construction of 2-Drydocks - measuring 550x135x13.5m & 370x100x12.5m, 7-Quays 3.3 km. total length, Building Facilities, Roads, Drainage & Sewerage, Diversion Canals, Landscaping Works, Electrical Systems, Water Supply Systems (Project Cost: 1 Billion US dollar, Client: HHIC-Phil, Inc.)
Duties and Responsibilities:
•Checked method statement and Inspection Test Plan (ITP) submitted by the Sub-contractors.
•Prepared quantity estimate of materials to be purchased and monitor the delivery as per project schedule.
•Thoroughly checked and reviewed shop drawings prior to site implementation.
•Tracked and monitored project status and reported to the Engineering Manager any delay incurred.
•Checked and monitored Sub-contractors’ progress accomplishment against project schedule.
•Attended coordination meeting with the Sub-contractors and resolved any problem issues arise to avoid delay of the project.
•Prepared correspondence to the sub-contractors, client, and other agencies involved in the project.
•Checked and valuated progress claims of the Sub-contractors and recommended for payment.
•Prepared monthly progress report and monthly progress claims of the project.
•Coordinated with other discipline engineers for smooth implementation of the project.
•Assisted the Construction team in interpretation and analysis of construction documents
such as Drawings, Specifications, Method Statements, ITP (Inspections & Test Plan) Checklists.

Chief Office Engineer at Heavy Industries & Construction Co., Ltd
  • Philippines
  • August 2004 to March 2007

Project: Bohol Irrigation Project Phase 2, Irrigation Component, Const. of Irrigation Canals & App. Structures

This project was the construction of 27 km - main canal, 63 km- lateral canals for irrigation. Various Irrigation Structures such Thresher & Road Crossings, Turnouts, Footbridge (Project Cost: 576 Million Philippine Pesos
Client: National Irrigation Administration)

Duties and Responsibilities:
•Heads a team to manage the various construction works assigned and ensured a high level of technical supervision. Overseeing works assigned to team members.
•Supervised all Staff Engineers & Cad Operators and ensured all assigned tasks are carried out according to project schedule requirements.
•Checked shop drawings and bill of materials needed for project implementation.
•Checked and reviewed quantity survey of the project to identify, process, and evaluate possible variations.
•Checked and reviewed monthly and weekly work schedule.
•Monitored daily site progress accomplishment and ensure that site works are on schedule and within budget.
•Implemented safety precautionary measures at site.
•Attended weekly toolbox meeting and resolved all problems encountered at site to avoid delay of the project schedule.
•Prepared monthly physical progress report and investment report of the project.
•Checked and reviewed as-built drawings of the project.
•Attended meetings with clients and consultants
•Interpretation and Implementation of approved latest revision plans/drawings, project specification.
•Ensuring all site activities complies in accordance with specification and plans.
•Full control of construction materials, manpower equipment/tools to maintained the planned productivity.
•Supervised daily manpower distribution and ensured balance work activities which correspond to the planned schedules and man-hour parameters.

•Prepared design calculation and implementation for temporary support and formwork system.

•Coordinated with the Surveyors, Sub contactors, QC staffs, Consultants for structure layout, Survey points, construction details and other site revisions.
•Developed and established effective procedures and management system and have an excellent experience in construction industry.

Structural Engineer at Heavy Industries & Construction Co., Ltd., Divisori
  • Philippines
  • February 2000 to August 2004

Project: Asian Development Bank - 6th Road Project, CP 6MI-14, Barangay Quiniput to Zamboanga City Road

This project was the construction of 43 km road Portland cement concrete pavement (2 to 4 lanes) including 7 new bridges and rehabilitation of existing bridges. (Project Cost: 991 Million Philippine Pesos, Client: Department Public Works and Highways)

Duties & Responsibilities:
•Studied and reviewed all plans & project specifications prior to implementation.
•Prepared shop drawings of bridges and box culverts, bar cutting lists and quantity of materials.
•Prepared materials estimate for purchase order & monitor the delivery schedule as required.
•Prepared weekly target schedule of the project.
•Prepared daily accomplishment report of the project.
•Implemented safety precautionary measures at site.
•Coordinated with other discipline engineers for smooth implementation of the project.
•Monitored the construction materials for its proper storage, handling, and usage.
•Prepared design calculation and implementation for temporary support and formwork system.
•Evaluated and recommended qualified subcontractors on the basis of their ability to meet subcontract requirements; monitors and assesses their performance

Chief Office Engineer at Heavy Industries & Construction Co., Ltd., Basey, Samar
  • Philippines
  • November 1996 to October 1999

Project: South Samar Coastal Road Project, Package 1-A, Basey to Cabugao Road, Samar, Philippines

This project was the construction of 14 km PCC pavement road over swampy areas, 4 nos. of PSCG bridges on bore pile foundation with diameter of 0.80 m to 1.5m, 49 units RC box culverts, drainage & slope protections. (Project Cost: 457 Million Philippine Pesos

Education

Bachelor's degree, Civil Engineering
  • at Mindanao State University
  • January 1989

in

Specialties & Skills

Office Work
Estimating
Claims Administration
Construction Supervision
Project Management
BALANCE
BRIDGES
BUDGETING
CUSTOMER RELATIONS
DELIVERY
DISEñO DE LA DISPOSICIóN
INTERPRETATION
MATERIALS MANAGEMENT
MICROSOFT WORKS
PLUMBING

Languages

English
Expert

Training and Certifications

Basic Quantity Surveying (Training)
Training Institute:
Philippine Institute of Civil Engineers, Qatar Chapter
Date Attended:
October 2008
Duration:
8 hours
Soil and Foundation Design (Certificate)
Date Attended:
September 1995