farag farag ibrahim el hamaky, Senior Electrical Engineer

farag farag ibrahim el hamaky

Senior Electrical Engineer

Archen Engineering Consultants

Location
Saudi Arabia
Education
Bachelor's degree, electrical engineer
Experience
20 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 3 Months

Senior Electrical Engineer at Archen Engineering Consultants
  • Saudi Arabia - Aseer
  • My current job since April 2017

Client : Ministry of Interior (MOI)
Projects:1st, South Border building & infrastructure Projects (SBI):
2nd, SALWA Infrastructure & Constructions Project (SBH):
(SBI): project consists of four Sites model D15, D15P, D14 & RG. each site consists of different building types (Headquarter, Recreation, Deputy, Mosque, two Soldiers Barracks, Dining, Military Police, Prison, Clinic, Weapons Store, Purveyance Store, playing football stadium,
, Training Area, Five Different services workshops, Fuel Station, STP, Irrigation Tank, Water firefighting Tank, Electrical &Generators Room plus site Dry& wet infrastructure utilities network.
(SBH): Project consists of 54 Apartment buildings with different types, 77 Villa, Administration building, Preliminary-Intermediate & secondary Boys & girls’ schools, firefighting building, female -Men & officers Recreation building, Clinic building, Shopping Center, Boyes & Girls Kindergarten and Two Masjid building and dry, wet utilities infrastructure networks. with Responsibility As below:
▪ Communicate with client, third party and head office Concerned Department continuously regarding Project Progress and areas of concern of in progress and under constructions work.
▪ Coordinate with client and technical team for Material, IFC & Shop drawing approval.
▪ Review and initial PM assessment of daily, weekly and monthly progress invoices.
▪ Co-ordinate and review staff performance and ensure compliance with requirements and project management good practice.
▪ Review weekly and monthly reports as presented by Contractor's .
▪ Review/approved by Senior MEP and present to MOI comments of non-compliance, concern and corrective action.
▪ Attend Executive meetings, weekly progress meeting, Quality meetings, Safety meetings and make sure that weekly technical meetings are attended by all relevant parties.
▪ Make internal weekly meetings for my staff to discuss Obstacles to work at the site, coordination’s with other Deci plain, progress, Quality, Safety and make sure they follow last approval updates, specifications, standard, contract documents to fast and push work for progress.
▪ Make sure that all staff is aware of the project approved procedures, scope of work and drawings.
▪ Issue and/or comment Contractor proposed site organization.
▪ Review and monitor in timely manner, the Contractor's proposed construction equipment’s and manpower histogram and advice PM of any shortage.
▪ Review all shop drawing and material submittals for all building electrical system (MV, LV & LC) used at buildings.
▪ Regular visit to Project site for monitoring of site activities in respect of Quality, Safety and Progress and advice PM representatives of finding and support Engineers and inspectors, areas of concern and corrective action.
▪ Study All request for information (RFIs) as submitted by the Contractor in timely manner. Then prepare the response to the Contractor without delay.
▪ Ensure supervision staff involvement and implementation of field Quality Control Procedures, Safety and Progress aspects.
▪ Follow up and inspection of dry utilities infrastructure execution work, laying cables, installation such as MV & LV cables as well as fire alarm system, fiber optic cables, communications networks, MATV, Access control, CCTV, Public Address, Intercom &IP telephone .

MEP engineer (Supervision Department) at Parsons
  • Saudi Arabia - Alahsa
  • September 2014 to January 2017

Client : Ministry of Housing (MOH)
Project: AL-HASA Housing &Infrastructure Project :
Project of Infrastructure dry utilities for MV, LV, Communications networks, street lighting for residential area of 1572 Villa, Administration building, Preliminary-Intermediate & secondary Boys & girls schools, public parks, and 2 Masjid building with construction of three stations Irrigation, potable & sewage with responsibility As below :
▪ Review all shop drawing and material submittals for all electrical work (MV &LV) systems and pumping stations: Sewage pump station, potable pump station and irrigation pump station (power supply, generator set and controls MCC Panel, low current and fire alarm systems.
▪ Co-ordinate and review staff performance and ensure compliance with requirements and project management good practice.
▪ Good communication and coordination with staff and other trades engineers.
▪ Review and monitor in timely manner, the Contractor's proposed construction equipment’s and manpower histogram and advice MOH of any shortage.
▪ Regular visit to Project site for monitoring of site activities in respect of Quality, Safety and Progress and advice MOH representatives of finding, areas of concern and corrective action.
▪ Reported MEP work progress to Senior MEP Engineer.
▪ Propose construction staff to comply with Agreement requirements & company procedures.
▪ Establish and maintain specific project procedures for Construction Supervision Management.
▪ Advice MOH representative on any potential variation to the Contractor 's /Scope of work that may generate cost or time impact and present Senior MEP assessment.
▪ Review weekly and monthly reports as presented by Contractor's.
▪ Assess change request as submitted by Contractor after reviewed and recommended by Senior MEP and prepare relevant reports and MOH with recommendations.
▪ Follow up and inspection of dry utilities infrastructure execution work, laying cables, installation such as MV & LV cables & UPS plus fire alarm system, fiber optic cables, communications networks, plus MATV, Access control, CCTV, Public Address, Intercom &IP telephone .
▪ Make sure that all staff is aware of the project approved procedures, scope of work and drawings.
▪ Ensure contractors compliance with its contractual obligations concerning Design changes, Tender Notices etc.
▪ Study All request for information (RFI) as submitted by the Contractor in timely manner. Then prepare the response to the Contractor without delay .
▪ Ensure supervision staff involvement and implementation of field Quality Control Procedures, Safety and Progress aspects.
▪ Area of project 1455421.274 m².

ELECTRICAL SITE ENGINEER at AL-MUTLAQ &BU-NUHAYAH CONSULTING ENGINEER
  • Saudi Arabia - Alahsa
  • June 2012 to August 2014

Al HASA housing 2 project And AL-INMAA BANK, SUADI HOLANDY BANK & RAJHI BANK.
Client : Ministry of Housing (MOH)
Al HASA housing 2 project.
Responsibilities:
▪ activities and efficiency of the staff for the satisfactory prosecution of the Work under supervision. Has responsibility to build and maintain an organization that can effectively provide the necessary staking.
▪ testing and inspection to ensure the Project is constructed according to plans and Specifications.
▪ Updated familiarize with the plans, specifications and contract amendments to effectively administer the work and ensure the Contractor's compliance with the Contract Documents.
▪ Fulfill all Principal responsibilities of Site Electrical Engineer.
▪ Follow up and inspection of dry utilities infrastructure execution work, laying cables, installation such as MV & LV cables, UPS &CBs plus fire alarm system, fiber optic cables & communications networks.
▪ Construction of housing units of 500 villa (unit) and three Mosques of Ministry of Housing.

SUPERVISOR ENGINEER at Anmat Consultsnt Engineer
  • Saudi Arabia - Riyadh
  • December 2010 to May 2012

Client : Technical and Vocational Training Corporation
Responsibilities:
Extensive experience the Electrical engineering field particularly in the construction supervision, has been involved in the design, preparation of specifications, engineering reports and coordination with the clients for a number of projects.
▪ 1st project consists of Main Administration Building with 1750 M², six other workshops with 1200m² for each one and land escape all over the project. All building contains power, light, low current (fire alarm, data &TEL, Clock, sound system), Earthing and lightening.
▪ Beside to construction of infrastructure for 4 substations ringed to gather and generators for emergency case and light street, Cost of project over 40 Million S .R.
▪ 2nd project consists of two workshops, guard house and land escape
▪ All building systems as the 1st project, Cost of project over 7.5 Million S .R.
▪ 3rd project consists of student’s house of 800² m four stare and work shop of 800 m²
▪ Cost of project over 12 Million S .R.
▪ All building contains systems as the 1st project.

ELECTRICAL ENGINIEER at ali elwehidy ali est.
  • Saudi Arabia - Riyadh
  • January 2009 to September 2010

Projects:
▪ Managements building of (GASCO), Riyadh &health club at Localizer Mall, Riyadh .
▪ number of exhibitions and offices in Localizer Mall in Riyadh for example :
Office of Property Company, Office of Management Mall, Office of Gulf Investments Co.
▪ Prince Turki Rest house in WADI LABAN, Riyadh & Prince Mansour Rest house in AL-OLAYA .
▪ Series shows Destination Maternity @Riyadh, Jeddah & Al Khobar.
Responsibilities:
▪ Supervise and execute several projects simultaneously.
▪ Guide and follow staff members, control projects under construction.
▪ Monitor construction activities against approved program and contract condition.
▪ Solve problems, watch for construction activities, watch out for matter of claims may be arises by the Contractor, deal with situations when Design conflicts construction.
▪ Administering contractual matters, quality control, Random review of working drawings (Shop Drawings) in accordance with contract documents.
▪ Communicating with contract parts and/ or concerned condition with all services departments and agencies.
▪ Perform Contract Management to make sure that the project is completed with best quality, safe within approved budget and in appropriate time.

maintenance &control engineer at al-aliaa weaving company
  • Egypt - Cairo
  • January 2005 to January 2009

▪ Rescindable of operation and work of manufacture production line machines and raw material production line machines for weaving products.
▪ Install Industrial Controller (hardware &software).
▪ Maintenance, troubleshooting and Control engineer for set machinery.
▪ Expertise in testing and troubleshooting, electronic and mechanical equipment with excellent reading and analyzing schematic diagrams.
▪ At the same company work as electronics and power engineer in additional to control engineer.
▪ Installation of machines (SMIT GS920, SOMET, NOUVO600&SULZIR630) with all types of jacquard (STAUBLI JC4, JC5&JC6) using its diagram guides.
▪ Maintaining and fixing all type of electronics cards.
▪ Maintaining and controlling engineer of machine.
▪ Control Panels termination with reference to wiring diagrams.
▪ Ability to install any new type of machines or devices using its diagram guides.
▪ Understanding how to solve problems and troubleshooting.
Duties:
▪ Operation and maintenance of machinery faults and resolve it as soon as possible avoiding any delay of the production cycle which may affect the income of the owner & labors.
▪ Order and buy original spare parts or search for alternative in case of non-availability in a wide as possible
▪ Repairing all electronic cards interface boards & Control machinery, updating configuration and operating software.

maintenance engineer at mahalla center
  • Egypt
  • October 2003 to January 2005

FROM 2003 till 2005 in Egypt. As Maintenance engineer at a big center for maintaining TVs and Radio.

Education

Bachelor's degree, electrical engineer
  • at fucalty of engineering ,tanta university
  • June 2004

I studied electrical engineering for five years and has specialized in Electronics and Communication Engineering and was a project I graduated coding the signal and how to send and receive with avoided and recover error and during my studies I received some training in this area and also worked maintenance electronic devices during that period after graduation worked in the field of installation , control and maintenance of textile machinery as well as repair their own electronic boards for more than four years in Egypt and then traveled to work in Saudi Arabia in the field of low current for a year and then work in the field of electricity buildings design, execution of electrical works and hand over as well as the preparation of drawings shop drawings ,as build drawings and some times design drawings

Specialties & Skills

Installation
Supervisory Experience
Leadership Communication
Engineering Drawings
Troubleshooting Hardware
suppervison, installation ,maintenance &control,bullding designe electrical drawing

Languages

English
Intermediate

Memberships

Egyption Engineers Association
  • electrical engineer
  • September 2004
Saudi Engineers Association
  • electrical engineer
  • February 2010

Training and Certifications

ISO 9001/2000 Requirements (Certificate)
Date Attended:
July 2006
Valid Until:
July 2006
Autocad 2007 2D (Certificate)
Date Attended:
December 2009
Valid Until:
December 2009
introduction to advanced communication systems (Certificate)
Date Attended:
August 2004
Valid Until:
September 2004
OHSAS 18001/2007 Requirements (Certificate)
Date Attended:
February 2009
Valid Until:
February 2009
spilit and window air conditions (Certificate)
Date Attended:
March 2005
Valid Until:
March 2005
Internal Quality auditor (Certificate)
Date Attended:
July 2006
Valid Until:
July 2006