Project manager
Naizak Global Engineering Systems
Total years of experience :8 years, 7 Months
الشرقية الخبر السعودية
Contractor Representative as project Manager in Saudi Aramco ( MFC-Install emergency siren system at Qatif north & south facilities).
Contractor Representative as project Manager in SEC (Installing Marine Security Protection the sea fronts of the coastal generation stations of Shoaiba
and rabigh power plants).
Managed the whole mega-project lifecycle from Feasibility Study and contributed my background in Project Management, Engineering and Process in
an organization seeking a proven performer committed to excellence and exceeding expectations.
Leading Naizak Global Engineering Systems project team during pr-feasibility, FEED design and construction stages to achieve project scope and
objectives.
Project coordination contractual aspects and the interfaces between all parties involved.
Responsible for the management of project costing, reporting, Procurement and the Sub-contractor.
Provides functional direction and maintains coordination with the Site Planners and Cost Controller(s).
Coordinate all design and construction interface with all parties in the project.
Contractor Representative as project Engineer in SEC ( upgradation of Qurayat city substation 33/13.8 KV - upgradation of sadea substation 33/13.8
kv - upgradation of Qurayat West substation 33/13.8 KV).
Contractor Representative as project Engineer at GACA in NEOM Airport ( supply, installation and commissioning of 5x Diesel Generators at Neom
sharma airport).
Contractor Representative as project Engineer at Saudi Aramco ( Midyan Gas Planet: SYLGARD Plus HVIC for 132KV and 13.8KV Bushing &
insulator)
Follow up the implementation of the terms of the contract.
Project Tendering and meeting with Venders & Suppliers.
Interact daily with the clients to interpret their needs and requirements and represent them in the technical support.
Review engineering deliverables and initiate appropriate corrective actions.
• Contractor Representative in front of MWSPC.
• Involved during Pre-commissioning and commissioning activities of plant.
• Participating in walk downs during construction and pre-commissioning phase and performed CCW, CCN, MCW, MCC and dossier preparation.
• Involved with procurement activities and close expedition of material delivery.
• Conducting quality inspections and checks.
• Involved during quality audit exercises at various phases of project, ensuring that project quality standards being followed.
• Exposed to engineering activities and involved during model review at 30%, 60%, 90% and various studies.
• Involved and monitored site execution activities across various disciplines.
• Also participated in development of method statements.
• Has sound exposure of GRP, SS and CS piping.
• Has experience in construction & Transformer, DOL and VSD.
• Has knowledge of pumps and tanks construction.
• Has knowledge project specication and ensuring the implementation of those.
• Involved in various other activities e.g. progress meeting, development of progress report, schedule development etc.