IT Project Manager of Park-Lane Tower
Managing a team of 6 dealing with Administration, network support, development, Database administrators and graphic design.
Standardization: This includes hardware, software, vendor, operating systems, and miscellaneous
Reduced cost of the IT by 20% through going to internal Edocs application.
Reduced cost by 7% through controlling and securing internet traffic.
Reduced cost by 15% through reduction of printers after redesigning the printers physical structure
Configuring, maintaining, managing and securing 5 servers with win2003 OS
Optimization of 4 websites.
Preparing and analyzing budget for the IT department.
Vulnerability and penetration testing.
ERP Handling Project.
Managed a team of three dealt with customer and network support.
Completed following projects within planned time frame and budget
• Mina Rashid - Site Office, Cruise Terminal Tent 1 & 2 and Temporary Cruise Terminal (TCT) which included the scope of work, supervision of cabling, configuration and installation of active components, and testing.
• Wireless to Fiber Migration for Nakheel - TDG which included the scope of work, shifting wireless MPLS connection to Fiber and supervise the project contractor that dealt with cable trenching and the testing of data and voice system.
Analyzed requirements of the infrastructure design in TCT that resulted in a cost cut of 20%.
Designed and delivered the following projects within timeline and below budget:
• Supervision of cabling, termination and testing of Nakheel - TDG phase III.
• Scope of project, voice and data connection to other TDG phases (I and II) with proper networking topology.
• Managed 1000 computers on three different subnets.
• Upgraded the system from work group to active directory.
• Managed a team of 10 dealt with network support, system support, data entry and hardware support.