Lead Construction Engineer
TANAP
Total years of experience :23 years, 6 Months
• Managing the EPCM ( Worley Parson ) project construction teams
• Construction & Commissioning of pipeline including Compressor Station, Metering Station and Block Valve Stations (lot1, spread1: 205km, 56 inch )
• Coordinating and assisting construction team
• Reviewing of principal contractor procedures, documents, specifications
• Monitor and manage all site activities to ensure objectives are accomplished within the prescribed time frame and budget parameters.
Managing the many aspects and various civil design contractors associated with the Greenfield development of a 200kbpd Central Processing Facility (CPF).
Managed Geotechnical consultant during borehole investigations and early civil works cut/fill analysis
Managed Geotechnical consultant during borehole investigations and early civil works cut/fill analysis
Prepared FEED documents
Performing Geo-technical and geo-physical investigation at site
Managed piling, geotechnical subcontractors.
Provided construction support to site team and construction subcontractor during construction, including site visits as required and site based with rotation.
• Review of CTRs
• Reviewing of design documents and drawings
• Managing the PMC, EPC project construction teams
• Monitoring cost control and schedule
• Review of all contractor method statements and task risk analysis.
• Performing Geo-technical and geo-physical investigation at site
• Reviewing of principal contractor procedures, documents, specifications
• Evaluating the technical bids
• Coordinating and assisting construction team
• Construction of ROWs and access roads; leveling, grading works
• Construction & Commissioning of 42km pipeline (various sizes, 8”, 16” and 36”) on the rocky and mountainous terrain
• Construction of all foundations (equipment’s, tanks, pipe racks, pipe supports, sleepers and buildings)
• Installation of steel structure, equipment’s (including pumps)
Reporting to the Line Manager; take responsibility for the coordination of site activities through the construction supervisors; direct responsibility on management of site subcontractors. Ensure the implementation of HSE management system at site with particular reference to their area of operation.
• Monitor and manage all site activities to ensure objectives are accomplished within the prescribed time frame and budget parameters.
• Reviewing of principal contractor procedures, documents, specifications
• Review of all contractor method statements and task risk analysis.
• Coordinating and assisting construction team
• Construction of Pump Station and Block Valve Stations
• Pipeline construction & commissioning, Re-routing works
• Land sliding works, River crossing works and Security fortification works
• Performing Geo-technical and geo-physical investigation at site
NEW ACID GAS REMOVAL PLANT in MINA AL-AHMADI REFINARY (406 million USD, Brownfield Project
Borouge II Project, (Polyolefin Unit, Product Handling & Marine Works
• 29, 000 m3 concrete ( equipment foundations, buildings, piperack and sleepers, paving, ...)
• 6, 250 ton structural steel
• 6, 100 ton equipment
• 220, 000 WDI piping
Job Description: Reporting to the Project Manager; take responsibility for the coordination of site activities through the Construction Superintendents & Supervisors; direct responsibility on management of site.
I have been worked in that project for Construction Manager with first tier subcontractor. My responsibilities, all the civil, structural, mechanical & piping activities related with EPPE and LLDPE plants. Prepare daily report on-site, analyze work progress. Strong cooperation with Project Management and Client responsible on Engineering Department. Ensure the Implementation of all HSE procedures and standards for the areas or activities.
• 110, 000 m3 excavation
• 116, 000 m3 concrete
• 156, 000 m2 formworks
• 69, 000 m2 sliding formworks
• 32, 000 tons structural steel, gratings and hand rails manufacturing, painting and erection
• 93, 000 m2 building cladding
Check and control the specific Construction Schedule per discipline if in line with general site planning curves. Manage and control the subcontractor team. Prepare daily report on-site, analyze work progress. Strong cooperation with Project Management and Client responsible on Engineering Dept. Ensure and approve field modification after manufacturing defects detection. Verify and approve field changes during assembly. Prepare ordinary weekly report. Ensure any addition or change to the technical drawings according to Field requirements. Be responsible for reviewing of site technical queries, including field sketches and modifications to any project engineering drawings, as required. Issue any supply non-conformities and follow-up the relevant resolution.
Oversaw daily activities, including formwork, rebar work, concrete placement, and site work, for the construction of a 30 years old Gas Plant. Performed duties of
. Oversaw daily activities, including formwork, rebar work, concrete placement, and site work, for the construction of a 20 hectare compound consisting of cooling towers, water treatment plant and switchyard. Performed duties of Assistant Supervisor for formwork, rebar and concrete placement at site.