GANESH SHARMA, construction manager

GANESH SHARMA

construction manager

NASSER S AL HAJRI CORPORATION

Location
India - Kerala
Education
Diploma, Mechanical Engineering
Experience
25 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 1 Months

construction manager at NASSER S AL HAJRI CORPORATION
  • Saudi Arabia - Dammam
  • November 2017 to January 2019

 Erection and fabrication of pipes/structure/lining/tanks (api 620 & 650).
 Ensure all piping /pipeline /structure/tank activities in respect of safety, quality, &schedule .
 Ensures sub-contractor works to the approved construction method statements and schedules.
 Ensures sub-contractor is performing.
 Maintain compliance with company policies, safety standards and housekeeping.
 Monitor piping/structure/tank productivity and man-hour data adjusting accordingly to meet progress and productivity targets for the project.
 Provide leadership, direction and make decisions in pursuit of the project goals and objectives.
 Responsible and accountable for the maintenance of fitting equipment and also budgetary management for assigned project.
 Clearly delegates action and responsibilities to subordinates, clearly defining deliverable requirements in terms of scope and schedule to the team.
 Responsible for ensuring that each employee is adequately trained and qualified to execute his work assignment competently and safely.
 Facilitate and maintain good inter-discipline communication and cohesion throughout the pipe fittings department.
 Continually review and institute measures for improvement by modification to operating procedures /work instructions.
 Fully understand and proactively invoke the company hse policy, philosophy and procedures.
 Liaise with piping/structure/tank engineer and planner to establish a pipe/pipeline/structure/tank fabrication and erection plan.
 Maintain planned schedule.
 High standard of safe working practice, quality and productivity as well as compliance with code of business conduct.
 Supervise the piping activities including fabrication, construction and completion of designated projects.
 Co ordinate the piping/structure/tank activities of construction contractors.
 Ensure that the contractors are working in the required work areas.
 Ensure the contracted works meets require productivity, quality and contract target completion date.
 Conduct daily tool box talk
 Attending client hse and production meetings with contractor.
 Ensure proper ppe supplied to the workers.
 Allocates resources and manages people
 Conduct safety toolbox talk to explain hazards, precautions and scope of job
 Coordinates answers to queries during fabrication and construction and makes shops or site visits as necessary to ensure technical integrity of piping system.
 Close supervision to ensure the quality and accuracy of pipe lines as per proper co-ordinates
 Trains workforce on all operating procedures and standard industrial practices while carrying out various activities
 Managing materials/stores stock items.
 Deliver engineering solutions for construction activities.
 Submission of material issue voucher request (mivr) according to the requirements
 Check vendor shop drawings and generating work descriptions
 Identify and document engineering and construction scope change issues
 Preparation of asbuilt drawings for the modified construction due to site condition.
 To define, plan and manage the activities, resources, schedule and quality of the project in accordance with management system.
 Supervise the piping as per test packs.
 Conduct line walk for the mechanical completion and identify the punches before submission
 Rectify the mechanical punches (a, b and c punches) before reinstatement.
 Coordinate and execute shutdown activity at rds
 Coordination with regards to daily activities: mechanical completion, commissioning and start up
 Attend the hydro tests performed on site, test packages mechanical check and advise the technical punches before reinstatement
 Monitor equipment/materials availability at the warehouse
 Monitor work progress in accordance with the submitted work schedule
 Attend the production meetings

CONSTRUCTION MANAGER at MAA KUTHARI GLOBAL CONTRACTING LLC
  • Qatar - Doha
  • September 2015 to October 2016

 ENSURE ALL PIPING /STRUCTURE/TANK ACTIVITIES IN RESPECT OF SAFETY, QUALITY, &SCHEDULE .
 ENSURES SUB-CONTRACTOR WORKS TO THE APPROVED CONSTRUCTION METHOD STATEMENTS AND SCHEDULES.
 ENSURES SUB-CONTRACTOR IS PERFORMING.
 MAINTAIN COMPLIANCE WITH COMPANY POLICIES, SAFETY STANDARDS AND HOUSEKEEPING.
 MONITOR PIPING/STRUCTURE/TANK PRODUCTIVITY AND MAN-HOUR DATA ADJUSTING ACCORDINGLY TO MEET PROGRESS AND PRODUCTIVITY TARGETS FOR THE PROJECT.
 PROVIDE LEADERSHIP, DIRECTION AND MAKE DECISIONS IN PURSUIT OF THE PROJECT GOALS AND OBJECTIVES.
 RESPONSIBLE AND ACCOUNTABLE FOR THE MAINTENANCE OF FITTING EQUIPMENT AND ALSO BUDGETARY MANAGEMENT FOR ASSIGNED PROJECT.
 CLEARLY DELEGATES ACTION AND RESPONSIBILITIES TO SUBORDINATES, CLEARLY DEFINING DELIVERABLE REQUIREMENTS IN TERMS OF SCOPE AND SCHEDULE TO THE TEAM.
 RESPONSIBLE FOR ENSURING THAT EACH EMPLOYEE IS ADEQUATELY TRAINED AND QUALIFIED TO EXECUTE HIS WORK ASSIGNMENT COMPETENTLY AND SAFELY.
 FACILITATE AND MAINTAIN GOOD INTER-DISCIPLINE COMMUNICATION AND COHESION THROUGHOUT THE PIPE FITTINGS DEPARTMENT.
 CONTINUALLY REVIEW AND INSTITUTE MEASURES FOR IMPROVEMENT BY MODIFICATION TO OPERATING PROCEDURES /WORK INSTRUCTIONS.
 FULLY UNDERSTAND AND PROACTIVELY INVOKE THE COMPANY HSE POLICY, PHILOSOPHY AND PROCEDURES.
 LIAISE WITH PIPING/STRUCTURE/TANK ENGINEER AND PLANNER TO ESTABLISH A PIPE/STRUCTURE/TANK FABRICATION AND ERECTION PLAN.
 MAINTAIN PLANNED SCHEDULE.
 HIGH STANDARD OF SAFE WORKING PRACTICE, QUALITY AND PRODUCTIVITY AS WELL AS COMPLIANCE WITH CODE OF BUSINESS CONDUCT.
 SUPERVISE THE PIPING ACTIVITIES INCLUDING FABRICATION, CONSTRUCTION AND COMPLETION OF DESIGNATED PROJECTS.
 CO ORDINATE THE PIPING/STRUCTURE/TANK ACTIVITIES OF CONSTRUCTION CONTRACTORS.
 ENSURE THAT THE CONTRACTORS ARE WORKING IN THE REQUIRED WORK AREAS.
 ENSURE THE CONTRACTED WORKS MEETS REQUIRE PRODUCTIVITY, QUALITY AND CONTRACT TARGET COMPLETION DATE.
 CONDUCT DAILY TOOL BOX TALK
 ATTENDING CLIENT HSE AND PRODUCTION MEETINGS WITH CONTRACTOR.
 ENSURE PROPER PPE SUPPLIED TO THE WORKERS.
 ALLOCATES RESOURCES AND MANAGES PEOPLE
 CONDUCT SAFETY TOOLBOX TALK TO EXPLAIN HAZARDS, PRECAUTIONS AND SCOPE OF JOB
 COORDINATES ANSWERS TO QUERIES DURING FABRICATION AND CONSTRUCTION AND MAKES SHOPS OR SITE VISITS AS NECESSARY TO ENSURE TECHNICAL INTEGRITY OF PIPING SYSTEM.
 CLOSE SUPERVISION TO ENSURE THE QUALITY AND ACCURACY OF PIPE LINES AS PER PROPER CO-ORDINATES
 TRAINS WORKFORCE ON ALL OPERATING PROCEDURES AND STANDARD INDUSTRIAL PRACTICES WHILE CARRYING OUT VARIOUS ACTIVITIES
 MANAGING MATERIALS/STORES STOCK ITEMS.
 DELIVER ENGINEERING SOLUTIONS FOR CONSTRUCTION ACTIVITIES.
 SUBMISSION OF MATERIAL ISSUE VOUCHER REQUEST (MIVR) ACCORDING TO THE REQUIREMENTS
 CHECK VENDOR SHOP DRAWINGS AND GENERATING WORK DESCRIPTIONS
 IDENTIFY AND DOCUMENT ENGINEERING AND CONSTRUCTION SCOPE CHANGE ISSUES
 PREPARATION OF ASBUILT DRAWINGS FOR THE MODIFIED CONSTRUCTION DUE TO SITE CONDITION.
 TO DEFINE, PLAN AND MANAGE THE ACTIVITIES, RESOURCES, SCHEDULE AND QUALITY OF THE PROJECT IN ACCORDANCE WITH MANAGEMENT SYSTEM.
 SUPERVISE THE PIPING AS PER TEST PACKS.
 CONDUCT LINE WALK FOR THE MECHANICAL COMPLETION AND IDENTIFY THE PUNCHES BEFORE SUBMISSION
 RECTIFY THE MECHANICAL PUNCHES (A, B AND C PUNCHES) BEFORE REINSTATEMENT.
 COORDINATE AND EXECUTE SHUTDOWN ACTIVITY AT RDS
 COORDINATION WITH REGARDS TO DAILY ACTIVITIES: MECHANICAL COMPLETION, COMMISSIONING AND START UP
 ATTEND THE HYDRO TESTS PERFORMED ON SITE, TEST PACKAGES MECHANICAL CHECK AND ADVISE THE TECHNICAL PUNCHES BEFORE REINSTATEMENT
 MONITOR EQUIPMENT/MATERIALS AVAILABILITY AT THE WAREHOUSE
 MONITOR WORK PROGRESS IN ACCORDANCE WITH THE SUBMITTED WORK SCHEDULE
 ATTEND THE PRODUCTION MEETINGS

CONSTRUCTION MANAGER at CHELSEA ARABIA CO. FOR CONTRACTING
  • Saudi Arabia - Khobar
  • September 2013 to September 2014

 ENSURE ALL PIPING /STRUCTURE/TANK ACTIVITIES IN RESPECT OF SAFETY, QUALITY, &SCHEDULE .
 ENSURES SUB-CONTRACTOR WORKS TO THE APPROVED CONSTRUCTION METHOD STATEMENTS AND SCHEDULES.
 ENSURES SUB-CONTRACTOR IS PERFORMING.
 MAINTAIN COMPLIANCE WITH COMPANY POLICIES, SAFETY STANDARDS AND HOUSEKEEPING.
 MONITOR PIPING/STRUCTURE/TANK PRODUCTIVITY AND MAN-HOUR DATA ADJUSTING ACCORDINGLY TO MEET PROGRESS AND PRODUCTIVITY TARGETS FOR THE PROJECT.
 PROVIDE LEADERSHIP, DIRECTION AND MAKE DECISIONS IN PURSUIT OF THE PROJECT GOALS AND OBJECTIVES.
 RESPONSIBLE AND ACCOUNTABLE FOR THE MAINTENANCE OF FITTING EQUIPMENT AND ALSO BUDGETARY MANAGEMENT FOR ASSIGNED PROJECT.
 CLEARLY DELEGATES ACTION AND RESPONSIBILITIES TO SUBORDINATES, CLEARLY DEFINING DELIVERABLE REQUIREMENTS IN TERMS OF SCOPE AND SCHEDULE TO THE TEAM.
 RESPONSIBLE FOR ENSURING THAT EACH EMPLOYEE IS ADEQUATELY TRAINED AND QUALIFIED TO EXECUTE HIS WORK ASSIGNMENT COMPETENTLY AND SAFELY.
 FACILITATE AND MAINTAIN GOOD INTER-DISCIPLINE COMMUNICATION AND COHESION THROUGHOUT THE PIPE FITTINGS DEPARTMENT.
 CONTINUALLY REVIEW AND INSTITUTE MEASURES FOR IMPROVEMENT BY MODIFICATION TO OPERATING PROCEDURES /WORK INSTRUCTIONS.
 FULLY UNDERSTAND AND PROACTIVELY INVOKE THE COMPANY HSE POLICY, PHILOSOPHY AND PROCEDURES.
 LIAISE WITH PIPING/STRUCTURE/TANK ENGINEER AND PLANNER TO ESTABLISH A PIPE/STRUCTURE/TANK FABRICATION AND ERECTION PLAN.
 MAINTAIN PLANNED SCHEDULE.
 HIGH STANDARD OF SAFE WORKING PRACTICE, QUALITY AND PRODUCTIVITY AS WELL AS COMPLIANCE WITH CODE OF BUSINESS CONDUCT.
 SUPERVISE THE PIPING ACTIVITIES INCLUDING FABRICATION, CONSTRUCTION AND COMPLETION OF DESIGNATED PROJECTS.
 CO ORDINATE THE PIPING/STRUCTURE/TANK ACTIVITIES OF CONSTRUCTION CONTRACTORS.
 ENSURE THAT THE CONTRACTORS ARE WORKING IN THE REQUIRED WORK AREAS.
 ENSURE THE CONTRACTED WORKS MEETS REQUIRE PRODUCTIVITY, QUALITY AND CONTRACT TARGET COMPLETION DATE.
 CONDUCT DAILY TOOL BOX TALK
 ATTENDING CLIENT HSE AND PRODUCTION MEETINGS WITH CONTRACTOR.
 ENSURE PROPER PPE SUPPLIED TO THE WORKERS.
 ALLOCATES RESOURCES AND MANAGES PEOPLE
 CONDUCT SAFETY TOOLBOX TALK TO EXPLAIN HAZARDS, PRECAUTIONS AND SCOPE OF JOB
 COORDINATES ANSWERS TO QUERIES DURING FABRICATION AND CONSTRUCTION AND MAKES SHOPS OR SITE VISITS AS NECESSARY TO ENSURE TECHNICAL INTEGRITY OF PIPING SYSTEM.
 CLOSE SUPERVISION TO ENSURE THE QUALITY AND ACCURACY OF PIPE LINES AS PER PROPER CO-ORDINATES
 TRAINS WORKFORCE ON ALL OPERATING PROCEDURES AND STANDARD INDUSTRIAL PRACTICES WHILE CARRYING OUT VARIOUS ACTIVITIES
 MANAGING MATERIALS/STORES STOCK ITEMS.
 DELIVER ENGINEERING SOLUTIONS FOR CONSTRUCTION ACTIVITIES.
 SUBMISSION OF MATERIAL ISSUE VOUCHER REQUEST (MIVR) ACCORDING TO THE REQUIREMENTS
 CHECK VENDOR SHOP DRAWINGS AND GENERATING WORK DESCRIPTIONS
 IDENTIFY AND DOCUMENT ENGINEERING AND CONSTRUCTION SCOPE CHANGE ISSUES
 PREPARATION OF ASBUILT DRAWINGS FOR THE MODIFIED CONSTRUCTION DUE TO SITE CONDITION.
 TO DEFINE, PLAN AND MANAGE THE ACTIVITIES, RESOURCES, SCHEDULE AND QUALITY OF THE PROJECT IN ACCORDANCE WITH MANAGEMENT SYSTEM.
 SUPERVISE THE PIPING AS PER TEST PACKS.
 CONDUCT LINE WALK FOR THE MECHANICAL COMPLETION AND IDENTIFY THE PUNCHES BEFORE SUBMISSION
 RECTIFY THE MECHANICAL PUNCHES (A, B AND C PUNCHES) BEFORE REINSTATEMENT.
 COORDINATE AND EXECUTE SHUTDOWN ACTIVITY AT RDS
 COORDINATION WITH REGARDS TO DAILY ACTIVITIES: MECHANICAL COMPLETION, COMMISSIONING AND START UP
 ATTEND THE HYDRO TESTS PERFORMED ON SITE, TEST PACKAGES MECHANICAL CHECK AND ADVISE THE TECHNICAL PUNCHES BEFORE REINSTATEMENT
 MONITOR EQUIPMENT/MATERIALS AVAILABILITY AT THE WAREHOUSE
 MONITOR WORK PROGRESS IN ACCORDANCE WITH THE SUBMITTED WORK SCHEDULE
 ATTEND THE PRODUCTION MEETINGS

CONSTRUCTION MANAGER at SEEH AL-SARYA ENGINEERING LLC
  • Oman - Muscat
  • September 2012 to April 2013

 ENSURE ALL PIPING /STRUCTURE/TANK ACTIVITIES IN RESPECT OF SAFETY, QUALITY, &SCHEDULE .
 ENSURES SUB-CONTRACTOR WORKS TO THE APPROVED CONSTRUCTION METHOD STATEMENTS AND SCHEDULES.
 ENSURES SUB-CONTRACTOR IS PERFORMING.
 MAINTAIN COMPLIANCE WITH COMPANY POLICIES, SAFETY STANDARDS AND HOUSEKEEPING.
 MONITOR PIPING/STRUCTURE/TANK PRODUCTIVITY AND MAN-HOUR DATA ADJUSTING ACCORDINGLY TO MEET PROGRESS AND PRODUCTIVITY TARGETS FOR THE PROJECT.
 PROVIDE LEADERSHIP, DIRECTION AND MAKE DECISIONS IN PURSUIT OF THE PROJECT GOALS AND OBJECTIVES.
 RESPONSIBLE AND ACCOUNTABLE FOR THE MAINTENANCE OF FITTING EQUIPMENT AND ALSO BUDGETARY MANAGEMENT FOR ASSIGNED PROJECT.
 CLEARLY DELEGATES ACTION AND RESPONSIBILITIES TO SUBORDINATES, CLEARLY DEFINING DELIVERABLE REQUIREMENTS IN TERMS OF SCOPE AND SCHEDULE TO THE TEAM.
 RESPONSIBLE FOR ENSURING THAT EACH EMPLOYEE IS ADEQUATELY TRAINED AND QUALIFIED TO EXECUTE HIS WORK ASSIGNMENT COMPETENTLY AND SAFELY.
 FACILITATE AND MAINTAIN GOOD INTER-DISCIPLINE COMMUNICATION AND COHESION THROUGHOUT THE PIPE FITTINGS DEPARTMENT.
 CONTINUALLY REVIEW AND INSTITUTE MEASURES FOR IMPROVEMENT BY MODIFICATION TO OPERATING PROCEDURES /WORK INSTRUCTIONS.
 FULLY UNDERSTAND AND PROACTIVELY INVOKE THE COMPANY HSE POLICY, PHILOSOPHY AND PROCEDURES.
 LIAISE WITH PIPING/STRUCTURE/TANK ENGINEER AND PLANNER TO ESTABLISH A PIPE/STRUCTURE/TANK FABRICATION AND ERECTION PLAN.
 MAINTAIN PLANNED SCHEDULE.
 HIGH STANDARD OF SAFE WORKING PRACTICE, QUALITY AND PRODUCTIVITY AS WELL AS COMPLIANCE WITH CODE OF BUSINESS CONDUCT.
 SUPERVISE THE PIPING ACTIVITIES INCLUDING FABRICATION, CONSTRUCTION AND COMPLETION OF DESIGNATED PROJECTS.
 CO ORDINATE THE PIPING/STRUCTURE/TANK ACTIVITIES OF CONSTRUCTION CONTRACTORS.
 ENSURE THAT THE CONTRACTORS ARE WORKING IN THE REQUIRED WORK AREAS.
 ENSURE THE CONTRACTED WORKS MEETS REQUIRE PRODUCTIVITY, QUALITY AND CONTRACT TARGET COMPLETION DATE.
 CONDUCT DAILY TOOL BOX TALK
 ATTENDING CLIENT HSE AND PRODUCTION MEETINGS WITH CONTRACTOR.
 ENSURE PROPER PPE SUPPLIED TO THE WORKERS.
 ALLOCATES RESOURCES AND MANAGES PEOPLE
 CONDUCT SAFETY TOOLBOX TALK TO EXPLAIN HAZARDS, PRECAUTIONS AND SCOPE OF JOB
 COORDINATES ANSWERS TO QUERIES DURING FABRICATION AND CONSTRUCTION AND MAKES SHOPS OR SITE VISITS AS NECESSARY TO ENSURE TECHNICAL INTEGRITY OF PIPING SYSTEM.
 CLOSE SUPERVISION TO ENSURE THE QUALITY AND ACCURACY OF PIPE LINES AS PER PROPER CO-ORDINATES
 TRAINS WORKFORCE ON ALL OPERATING PROCEDURES AND STANDARD INDUSTRIAL PRACTICES WHILE CARRYING OUT VARIOUS ACTIVITIES
 MANAGING MATERIALS/STORES STOCK ITEMS.
 DELIVER ENGINEERING SOLUTIONS FOR CONSTRUCTION ACTIVITIES.
 SUBMISSION OF MATERIAL ISSUE VOUCHER REQUEST (MIVR) ACCORDING TO THE REQUIREMENTS
 CHECK VENDOR SHOP DRAWINGS AND GENERATING WORK DESCRIPTIONS
 IDENTIFY AND DOCUMENT ENGINEERING AND CONSTRUCTION SCOPE CHANGE ISSUES
 PREPARATION OF ASBUILT DRAWINGS FOR THE MODIFIED CONSTRUCTION DUE TO SITE CONDITION.
 TO DEFINE, PLAN AND MANAGE THE ACTIVITIES, RESOURCES, SCHEDULE AND QUALITY OF THE PROJECT IN ACCORDANCE WITH MANAGEMENT SYSTEM.
 SUPERVISE THE PIPING AS PER TEST PACKS.
 CONDUCT LINE WALK FOR THE MECHANICAL COMPLETION AND IDENTIFY THE PUNCHES BEFORE SUBMISSION
 RECTIFY THE MECHANICAL PUNCHES (A, B AND C PUNCHES) BEFORE REINSTATEMENT.
 COORDINATE AND EXECUTE SHUTDOWN ACTIVITY AT RDS
 COORDINATION WITH REGARDS TO DAILY ACTIVITIES: MECHANICAL COMPLETION, COMMISSIONING AND START UP
 ATTEND THE HYDRO TESTS PERFORMED ON SITE, TEST PACKAGES MECHANICAL CHECK AND ADVISE THE TECHNICAL PUNCHES BEFORE REINSTATEMENT
 MONITOR EQUIPMENT/MATERIALS AVAILABILITY AT THE WAREHOUSE
 MONITOR WORK PROGRESS IN ACCORDANCE WITH THE SUBMITTED WORK SCHEDULE
 ATTEND THE PRODUCTION MEETINGS

MECHANICAL ENGINEER at ABDUL RAHMAN AL BADAR COMPANY
  • Saudi Arabia - Alahsa
  • May 2011 to May 2012

 ENSURE ALL PIPING /STRUCTURE/TANK ACTIVITIES IN RESPECT OF SAFETY, QUALITY, &SCHEDULE .
 ENSURES SUB-CONTRACTOR WORKS TO THE APPROVED CONSTRUCTION METHOD STATEMENTS AND SCHEDULES.
 ENSURES SUB-CONTRACTOR IS PERFORMING.
 MAINTAIN COMPLIANCE WITH COMPANY POLICIES, SAFETY STANDARDS AND HOUSEKEEPING.
 MONITOR PIPING/STRUCTURE/TANK PRODUCTIVITY AND MAN-HOUR DATA ADJUSTING ACCORDINGLY TO MEET PROGRESS AND PRODUCTIVITY TARGETS FOR THE PROJECT.
 PROVIDE LEADERSHIP, DIRECTION AND MAKE DECISIONS IN PURSUIT OF THE PROJECT GOALS AND OBJECTIVES.
 RESPONSIBLE AND ACCOUNTABLE FOR THE MAINTENANCE OF FITTING EQUIPMENT AND ALSO BUDGETARY MANAGEMENT FOR ASSIGNED PROJECT.
 CLEARLY DELEGATES ACTION AND RESPONSIBILITIES TO SUBORDINATES, CLEARLY DEFINING DELIVERABLE REQUIREMENTS IN TERMS OF SCOPE AND SCHEDULE TO THE TEAM.
 RESPONSIBLE FOR ENSURING THAT EACH EMPLOYEE IS ADEQUATELY TRAINED AND QUALIFIED TO EXECUTE HIS WORK ASSIGNMENT COMPETENTLY AND SAFELY.
 FACILITATE AND MAINTAIN GOOD INTER-DISCIPLINE COMMUNICATION AND COHESION THROUGHOUT THE PIPE FITTINGS DEPARTMENT.
 CONTINUALLY REVIEW AND INSTITUTE MEASURES FOR IMPROVEMENT BY MODIFICATION TO OPERATING PROCEDURES /WORK INSTRUCTIONS.
 FULLY UNDERSTAND AND PROACTIVELY INVOKE THE COMPANY HSE POLICY, PHILOSOPHY AND PROCEDURES.
 LIAISE WITH PIPING/STRUCTURE/TANK ENGINEER AND PLANNER TO ESTABLISH A PIPE/STRUCTURE/TANK FABRICATION AND ERECTION PLAN.
 MAINTAIN PLANNED SCHEDULE.
 HIGH STANDARD OF SAFE WORKING PRACTICE, QUALITY AND PRODUCTIVITY AS WELL AS COMPLIANCE WITH CODE OF BUSINESS CONDUCT.
 SUPERVISE THE PIPING ACTIVITIES INCLUDING FABRICATION, CONSTRUCTION AND COMPLETION OF DESIGNATED PROJECTS.
 CO ORDINATE THE PIPING/STRUCTURE/TANK ACTIVITIES OF CONSTRUCTION CONTRACTORS.
 ENSURE THAT THE CONTRACTORS ARE WORKING IN THE REQUIRED WORK AREAS.
 ENSURE THE CONTRACTED WORKS MEETS REQUIRE PRODUCTIVITY, QUALITY AND CONTRACT TARGET COMPLETION DATE.
 CONDUCT DAILY TOOL BOX TALK
 ATTENDING CLIENT HSE AND PRODUCTION MEETINGS WITH CONTRACTOR.
 ENSURE PROPER PPE SUPPLIED TO THE WORKERS.
 ALLOCATES RESOURCES AND MANAGES PEOPLE
 CONDUCT SAFETY TOOLBOX TALK TO EXPLAIN HAZARDS, PRECAUTIONS AND SCOPE OF JOB
 COORDINATES ANSWERS TO QUERIES DURING FABRICATION AND CONSTRUCTION AND MAKES SHOPS OR SITE VISITS AS NECESSARY TO ENSURE TECHNICAL INTEGRITY OF PIPING SYSTEM.
 CLOSE SUPERVISION TO ENSURE THE QUALITY AND ACCURACY OF PIPE LINES AS PER PROPER CO-ORDINATES
 TRAINS WORKFORCE ON ALL OPERATING PROCEDURES AND STANDARD INDUSTRIAL PRACTICES WHILE CARRYING OUT VARIOUS ACTIVITIES
 MANAGING MATERIALS/STORES STOCK ITEMS.
 DELIVER ENGINEERING SOLUTIONS FOR CONSTRUCTION ACTIVITIES.
 SUBMISSION OF MATERIAL ISSUE VOUCHER REQUEST (MIVR) ACCORDING TO THE REQUIREMENTS
 CHECK VENDOR SHOP DRAWINGS AND GENERATING WORK DESCRIPTIONS
 IDENTIFY AND DOCUMENT ENGINEERING AND CONSTRUCTION SCOPE CHANGE ISSUES
 PREPARATION OF ASBUILT DRAWINGS FOR THE MODIFIED CONSTRUCTION DUE TO SITE CONDITION.
 TO DEFINE, PLAN AND MANAGE THE ACTIVITIES, RESOURCES, SCHEDULE AND QUALITY OF THE PROJECT IN ACCORDANCE WITH MANAGEMENT SYSTEM.
 SUPERVISE THE PIPING AS PER TEST PACKS.
 CONDUCT LINE WALK FOR THE MECHANICAL COMPLETION AND IDENTIFY THE PUNCHES BEFORE SUBMISSION
 RECTIFY THE MECHANICAL PUNCHES (A, B AND C PUNCHES) BEFORE REINSTATEMENT.
 COORDINATE AND EXECUTE SHUTDOWN ACTIVITY AT RDS
 COORDINATION WITH REGARDS TO DAILY ACTIVITIES: MECHANICAL COMPLETION, COMMISSIONING AND START UP
 ATTEND THE HYDRO TESTS PERFORMED ON SITE, TEST PACKAGES MECHANICAL CHECK AND ADVISE THE TECHNICAL PUNCHES BEFORE REINSTATEMENT
 MONITOR EQUIPMENT/MATERIALS AVAILABILITY AT THE WAREHOUSE
 MONITOR WORK PROGRESS IN ACCORDANCE WITH THE SUBMITTED WORK SCHEDULE
 ATTEND THE PRODUCTION MEETINGS

FABRICATION MANAGER at CONSOLIDATD CONSTRUCTION COMPANY
  • India - Chennai
  • July 2010 to January 2011

FABRICATION AND ERECTION OF PIPING/STRUCTURE.

CONSTRUCTION MANAGER at NASSER' S AL HAJRI CO.
  • Qatar - Doha
  • January 2005 to February 2010

 ENSURE ALL PIPING ACTIVITIES IN RESPECT OF SAFETY, QUALITY, &SCHEDULE .
 ENSURES SUB-CONTRACTOR WORKS TO THE APPROVED CONSTRUCTION METHOD STATEMENTS AND SCHEDULES.
 ENSURES SUB-CONTRACTOR IS PERFORMING.
 MAINTAIN COMPLIANCE WITH COMPANY POLICIES, SAFETY STANDARDS AND HOUSEKEEPING.
 MONITOR PIPING PRODUCTIVITY AND MAN-HOUR DATA ADJUSTING ACCORDINGLY TO MEET PROGRESS AND PRODUCTIVITY TARGETS FOR THE PROJECT.
 PROVIDE LEADERSHIP, DIRECTION AND MAKE DECISIONS IN PURSUIT OF THE PROJECT GOALS AND OBJECTIVES.
 RESPONSIBLE AND ACCOUNTABLE FOR THE MAINTENANCE OF FITTING EQUIPMENT AND ALSO BUDGETARY MANAGEMENT FOR ASSIGNED PROJECT.
 CLEARLY DELEGATES ACTION AND RESPONSIBILITIES TO SUBORDINATES, CLEARLY DEFINING DELIVERABLE REQUIREMENTS IN TERMS OF SCOPE AND SCHEDULE TO THE TEAM.
 RESPONSIBLE FOR ENSURING THAT EACH EMPLOYEE IS ADEQUATELY TRAINED AND QUALIFIED TO EXECUTE HIS WORK ASSIGNMENT COMPETENTLY AND SAFELY.
 FACILITATE AND MAINTAIN GOOD INTER-DISCIPLINE COMMUNICATION AND COHESION THROUGHOUT THE PIPE FITTINGS DEPARTMENT.
 CONTINUALLY REVIEW AND INSTITUTE MEASURES FOR IMPROVEMENT BY MODIFICATION TO OPERATING PROCEDURES /WORK INSTRUCTIONS.
 FULLY UNDERSTAND AND PROACTIVELY INVOKE THE COMPANY HSE POLICY, PHILOSOPHY AND PROCEDURES.
 LIAISE WITH PIPING ENGINEER AND PLANNER TO ESTABLISH A PIPE FABRICATION AND ERECTION PLAN.
 MAINTAIN PLANNED SCHEDULE.
 HIGH STANDARD OF SAFE WORKING PRACTICE, QUALITY AND PRODUCTIVITY AS WELL AS COMPLIANCE WITH CODE OF BUSINESS CONDUCT.
 SUPERVISE THE PIPING ACTIVITIES INCLUDING FABRICATION, CONSTRUCTION AND COMPLETION OF DESIGNATED PROJECTS.
 CO ORDINATE THE PIPING ACTIVITIES OF CONSTRUCTION CONTRACTORS.
 ENSURE THAT THE CONTRACTORS ARE WORKING IN THE REQUIRED WORK AREAS.
 ENSURE THE CONTRACTED WORKS MEETS REQUIRE PRODUCTIVITY, QUALITY AND CONTRACT TARGET COMPLETION DATE.
 CONDUCT DAILY TOOL BOX TALK
 ATTENDING CLIENT HSE AND PRODUCTION MEETINGS WITH CONTRACTOR.
 ENSURE PROPER PPE SUPPLIED TO THE WORKERS.
 ALLOCATES RESOURCES AND MANAGES PEOPLE
 CONDUCT SAFETY TOOLBOX TALK TO EXPLAIN HAZARDS, PRECAUTIONS AND SCOPE OF JOB
 COORDINATES ANSWERS TO QUERIES DURING FABRICATION AND CONSTRUCTION AND MAKES SHOPS OR SITE VISITS AS NECESSARY TO ENSURE TECHNICAL INTEGRITY OF PIPING SYSTEM.
 CLOSE SUPERVISION TO ENSURE THE QUALITY AND ACCURACY OF PIPE LINES AS PER PROPER CO-ORDINATES
 TRAINS WORKFORCE ON ALL OPERATING PROCEDURES AND STANDARD INDUSTRIAL PRACTICES WHILE CARRYING OUT VARIOUS ACTIVITIES
 MANAGING MATERIALS/STORES STOCK ITEMS.
 DELIVER ENGINEERING SOLUTIONS FOR CONSTRUCTION ACTIVITIES.
 SUBMISSION OF MATERIAL ISSUE VOUCHER REQUEST (MIVR) ACCORDING TO THE REQUIREMENTS
 CHECK VENDOR SHOP DRAWINGS AND GENERATING WORK DESCRIPTIONS
 IDENTIFY AND DOCUMENT ENGINEERING AND CONSTRUCTION SCOPE CHANGE ISSUES
 PREPARATION OF ASBUILT DRAWINGS FOR THE MODIFIED CONSTRUCTION DUE TO SITE CONDITION.
 TO DEFINE, PLAN AND MANAGE THE ACTIVITIES, RESOURCES, SCHEDULE AND QUALITY OF THE PROJECT IN ACCORDANCE WITH MANAGEMENT SYSTEM.
 SUPERVISE THE PIPING AS PER TEST PACKS.
 CONDUCT LINE WALK FOR THE MECHANICAL COMPLETION AND IDENTIFY THE PUNCHES BEFORE SUBMISSION
 RECTIFY THE MECHANICAL PUNCHES (A, B AND C PUNCHES) BEFORE REINSTATEMENT.
 COORDINATE AND EXECUTE SHUTDOWN ACTIVITY AT RDS
 COORDINATION WITH REGARDS TO DAILY ACTIVITIES: MECHANICAL COMPLETION, COMMISSIONING AND START UP
 ATTEND THE HYDRO TESTS PERFORMED ON SITE, TEST PACKAGES MECHANICAL CHECK AND ADVISE THE TECHNICAL PUNCHES BEFORE REINSTATEMENT
 MONITOR EQUIPMENT/MATERIALS AVAILABILITY AT THE WAREHOUSE
 MONITOR WORK PROGRESS IN ACCORDANCE WITH THE SUBMITTED WORK SCHEDULE
 ATTEND THE PRODUCTION MEETINGS

QC SUPERVISOR at LARSEN AND TOUBRO
  • India - Chennai
  • November 1996 to December 2004

INSPECTION AND DOCUMENTATION OF ALL QC RELATED WORKS IN THE COMPANY INCLUDING ALL NDT RELATED TESTING AND ITS DOCUMENTATION.

QC SUPERSIOR at TECH- SHARP ENGINEERS
  • India - Chennai
  • December 1990 to November 1996

FABRICATION, ERECTION AND QUALITY INSPECTION OF PIPING/STRUCTURE AND LINING WORKS IN KALPAKKAM ATOMIC RESEARCH PROJECT AT INDIRA GANDHI CENTRE FOR ATOMIC RESEARCH, KALPAKKAM FROM 1990 TO 1996 AS QC SUPERVISOR.

Education

Diploma, Mechanical Engineering
  • at THE KERALA TECHNICAL INSTITUTE
  • April 1993

Specialties & Skills

Structural
Pipelines
Equipment Erection
Global Manufacturing
Quality Control
FABRICATION AND ERECTION OF PIPING/STRUCTURE /LINING/TANK AND EQUIPMENTS

Languages

English
Expert
Hindi
Expert
Malayalam
Expert
Tamil
Expert

Training and Certifications

APPROVED GAS TESTINH (Training)
Training Institute:
TOTAL SAFETY L.L.C
Date Attended:
March 2007
Duration:
8 hours
SAFETY TRAINING PROGRAMME (Training)
Training Institute:
NATIONAL SAFETY COUNCIL OF INDIA
Date Attended:
August 2000
Duration:
24 hours
INVESTIGATION AND REPORTING (Training)
Training Institute:
JGC Middle East FZE
Date Attended:
April 2006
Duration:
8 hours
SAFE WORK METHOD STATEMENTS AND JSA (Training)
Training Institute:
JGC Middle East FZE
Date Attended:
February 2006
Duration:
48 hours
BEHAVIOURAL SAFETY (Training)
Training Institute:
JGC Middle East FZE
Date Attended:
February 2006
Duration:
48 hours
OCCUPATIONAL HEALTH (Training)
Training Institute:
JGC Middle East FZE
Date Attended:
February 2006
Duration:
48 hours
ENVIRONMENTAL CONTROL AND MONITORING (Training)
Training Institute:
JGC Middle East FZE
Date Attended:
January 2006
Duration:
48 hours
SECURITY CONTROL AND MONITORING (Training)
Training Institute:
JGC Middle East FZE
Date Attended:
February 2006
Duration:
48 hours
GENERAL SAFETY (Training)
Training Institute:
JGC Middle East FZE
Date Attended:
February 2006
Duration:
48 hours
MANAGEMENT IN HSES (Training)
Training Institute:
JGC Middle East FZE
Date Attended:
February 2006
Duration:
48 hours
 SUPRVISION AND TRAINING (Training)
Training Institute:
JGC Middle East FZE
Date Attended:
February 2006
Duration:
48 hours

Hobbies

  • Reading