Geoffrey Brady, Project Manager

Geoffrey Brady

Project Manager

EXP Energy Services Inc

Location
United States - Texas - Houston
Education
High school or equivalent, Chemical Engineering
Experience
31 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :31 years, 11 Months

Project Manager at EXP Energy Services Inc
  • September 2018 to November 2019

Houston
•Managed the new proposals for both Process and Pipelines related jobs.
•Led the effort for the Engineering Compliance and Confirmation.
•Technical liaison for construction related issues along with new changes as they developed on the Keystone Pipeline Project.
•Reviewing/Developing Company standards and specifications to be used on future projects and to be used as a basis for the entire company.

Project Manager at Fluor Daniel
  • India
  • October 2017 to May 2018

Kuwait Pipelines and Peru Pipelines
Houston
•Pipeline Lead Engineer for Peru Pipeline with the engineering being completed out of the Manila office and coordinated through me in the Houston office.
Kuwait

•Project Manager for over 450KM of pipelines (16 total) which will feed crude oil and fuel gas to the new grass roots refinery to be built in southern Kuwait.
•Managed the PMC contractor and Saipem along with the Fluor Corp. staff.
•Interfaced with Kuwait Oil Company to constantly keep them abreast of the daily activities and managed all correspondences between them and all other parties.
•Received an award for my work efforts on the project

Project Manager at Saudi Aramco
  • Saudi Arabia
  • June 2011 to February 2017

Oversaw and managed all engineering and construction deliverables, budget and schedule for replacing three (3) pipelines totaling a combined length of 100 KM

•Managed the lead construction contractor, Denys, lead engineering contractor, Worley Parsons, and ten (10) Aramco engineering staff
•Identified and designed an opportunity to eliminate one of the pipelines and reclassify a pipeline in order to save $4 M in cost savings

Dhahran, Saudi Arabia

•Managed all technical related issues and ensured the consistency and accuracy between job contractors as the

Project Engineer at Bechtel
  • United Arab Emirates
  • June 2004 to June 2011

Block Lead - Queensland LNG

•Provided direction as the block lead engineer for the off-sites facilities as well as the temporary facilities to be used during the construction period of a two (2) train Australian Queensland LNG project worth over $10 B producing 4.2 MTPA and is Bechtel’s largest lump sum LNG project to date (Project received the award of “ENR Global Best Project Award in power/industrial category”)
•Supervised six (6) engineers in the Houston office as well as four (4) engineers in the Shanghai office
•Completed all P&ID’s for responsible block despite having over 40% of all the P&ID’s for this project (average is 25% per block
•Work completed on permanent facilities include:
•Produced all of initial draft of the process related P&ID’s for the LNG process.
•Developed the P&ID’s for the LNG cryogenic storage tank.
•Flare Systems: distribution, KO pots, Flame Front Generator, purging, Marine, Dry and Wet flares and overall system design
•Waste water treatment and disposal: Sanitary treatment, CPI separators, disposal and distribution
•Firewater: Firewater tanks, jockey pumps and main FW pump design and distribution (both diesel and electric)
•Instrument Air: Screw compressors, KO pots, heat-less desiccant driers, inter and after stage cooling and distribution
•Sea water desalination: RO systems, EDI System as well as chemical treatment and storage. With the desalination process, we produced potable water, service water, demineralized water and fire water
•Inlet Air Chilling: Propane refrigeration system used to chill turbine intake air
•Nitrogen Generation: Nitrogen membrane and liquid nitrogen generation and distribution
•Work completed on temporary facilities include:
•Diesel Storage and distribution as well as barge loading.
•Sea water desalination utilizing RO system to make potable and service water for an 1800 man camp.
•Waste water treatment and disposal for the camp
•Fire water system utilizing for the construction camp integrated with the permanent plant.
•Seawater intake facilities.

Project Engineer - Sunrise LNG

•Developed seventy-five (75) P&IDs and other documents relating to the pre-feed study for the Sunrise LNG plant in Australia
•Developed all of the P&ID’s for the process facilities for the LNG process.
•Accountable for all off-site facilities such as Flare, Diesel storage and distribution, Fuel gas treatment, power generation, firewater, Plant and Instrument Air and Nitrogen generation
•Supervised three (3) engineers in the Houston office and eight (8) engineers in the New Delhi office

Senior Project Pipeline Engineer - Sonahess
Algeria

•Oversaw and managed the Pipeline for the Algeria project for Sonahess for two (2) years from within the field from the initial concept to design to construction while holding four

Lead Field Engineer at Paragon Engineering
  • June 2001 to December 2003

for the home office engineering effort carried out into the field and reviewing of vendor documentation
•Lead Six Sigma Coordinator
•Ensured project goals are met for Six Sigma and as a result, received an “A” rating for job fulfillment

Lead Pipeline Engineer - Gas Treatment Pipeline
Frederick, MD

•Designed the chemical Injection System, well site layout and design, pipeline routing, project specifications, bid tab evaluation and vendor selection for a Gas Treatment Plan Pipeline to be installed in Iraq
•Created and processed all Material Requisitions and P&ID’s

Project Engineer at Bechtel
  • United Arab Emirates
  • February 1996 to June 2001

of the Chilled Water system and the hot water systems to be used in the HVAC system for nuclear waste disposal in Washington State

Project Engineer - Sonatrach

•Developed proposals on the OZ1/OZ2 Project and the Hassi R' Mel Boosting Facilities Project for pipeline work within the country of Algeria.
•Developed all the P&ID’s, Material Requisitions, equipment sizing, bid tab evaluations and hydraulic analysis

Project Engineer at Contracting Engineering Assignments
  • February 1994 to February 1996

UCC Expansion Project

•Developed the Process related P&ID’s for distillation trains and compression trains.
•Supervised four (4) project engineers and one (1) process engineer to expedite schedule for the UCC Expansion Project
•Extracted all of the needed information from Union Carbide's simulation, which did not have a corresponding PFD, Developed P&ID's for assigned area

Project Engineer - PPG VCM II Debottlenecking
PPG VCM II Debottlenecking

•Created P&ID’s, LDT, hydraulics, cooling water sump design, steam and desuperheating the steam for a Debottlenecking project for PPG VCM
•Lead small group of engineers in the design of the new utilities

Process Engineer -Phoenix Area Refinery

•Developed the process related P&ID's, PFD's, equipment sizing, line sizing and hydraulics for a grass roots refinery
•Wrote program for sizing of two-phase horizontal and vertical lines using Ducklers and Aziz methods, respectively
•Validated other programs (pump sizing, LDT and vessel sizing) for accuracy and usability

Process Engineer -OSHA 1910 Compliance Project
Hawaii

•Updated P&ID's and created PFD's, preliminary flare header sizing, collating and calculating the safe operating limits for each process stream and every major piece of equipment and determining the consequences of deviation for each case scenario at the Broken Hill Proprietary Refinery in Hawaii

Systems Engineer at Bechtel
  • United Arab Emirates
  • November 1989 to February 1994

Shell Martinez Project

•Designed and developed the P&ID's, LDT and the pump calculations for the Instrument air, fuel gas & pump out systems

Process Systems Engineer -Aramchem Project

•Grass roots design of the Plant Air, Instrument Air, Diesel, Wash Oil and Fuel Gas Systems. Responsibilities included HAZOP's review, design of distribution headers, sizing of the plant and instrument air compressors, review of vendor prints, selection of vendors based on price and design requirements, sizing of air dryers and sizing of various tanks and pumps. Responsible for the preliminary process design of the fuel gas system using the HYSIM program.

Process Systems Engineer - Phillips Waste Water

•Upgraded the wastewater, storm water, and the underground P&ID's
•Advised Phillips of the actions necessary to meet OSHA requirements by 1995.

Process Systems Engineer - Angus Chemical
Monroe, Louisiana

•Assessed damage to the plant in Monroe, LA and designed both the nitration and the product recovery areas while meeting an extremely accelerated schedule
•Updated existing drawings, hydraulic calculations, line sizing hydrotest packages,
•Lead project group on the follow-up to HAZOP's questions and advised construction on various concerns
•Plant made Nitroglycerin and racing fuel
•Averaged 16 hours of work per day due to explosion. Came in under schedule.
.
Process Systems Engineer - Chevron Wastewater Treatment

•Selected by Bechtel to participate in the College Rotation Program. Worked as a Control Systems Engineer on the heater replacement project. Areas of work included P&ID development, preparing man-hour estimates, material takeoffs and preparing bid packages.

Education

High school or equivalent, Chemical Engineering
  • at Mississippi State University
  • January 2021

Organizations

Bachelor's degree, Chemical Engineering
  • at Mississippi State University
  • January 2021

Organizations

High school or equivalent, Chemical Engineering
  • at Jones Country Junior College
  • January 2021

Specialties & Skills

Pipelines
Process Engineering
Project Engineering
Chemical Engineering
BUDGETING
ENGINEERING
OIL PAINTING
CONCEPT DEVELOPMENT
DIRECTING
DOCUMENTATION
ELECTRONIC DATA INTERCHANGE