Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Georges Bou Karim, Project manager

Georges Bou Karim

Project manager·MELEC GROUP S.A.L

Lebanon

Master's degree, Electrical Engineering

Work experience

Total years of experience: 23 years, 9 months

Project manager

January 2012 - September 2014

MELEC GROUP S.A.L

Sulaymaniyah, Iraq

January 2012 - September 2014

Responsible for managing the project (Contract No: KRG-MOE/SUG132- 02/2011) and erecting for one new 132kV, double circuit, underground cable,
size 1200mm², 5.5kM and installing a fiber optic cable 24 pairs and all necessary
accessories for connection to both substations also the scope is included all
cable terminations, joints and cross bonding, between New Rizgary SS and
Center Sulaymaniyah SS in the Sulaymaniyah Governorate of the Kurdistan
Regional Government of Iraq.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Projects Manager

January 2010 - January 2012

Bull and Bear Associates

Afghanistan

January 2010 - January 2012

Responsible for managing the projects at the FOB's of Afghanistan for the US
Army
Successfully accomplished and completed twelve (12) 300-Man Camps
LOGCAP IV in different FOBs namely Lindsey, Walton I, II and III, Spin Boldak,
Howz-E-Madad, Shindand comprising 43 Alaska Shelter System Tents and LSS
Units with electrical and plumbing installations.
Started and completed Motor pool project in FOB Spin Boldak
Started and completed Tower Foundation project in Camp Davis, KAF
Started and completed 11 Containerized Guard Towers in FOB Lagman

Company industry:
Construction & Building
Job role:
Engineering

(Iraq Branch Manager (Projects Manager

January 2005 - January 2010

Jamaher Contracting Co

Baghdad, Iraq

January 2005 - January 2010

Responsible for managing the installation of twelve new PEB steel
building including electrical installation, data and fiber optic system installations
located at Balad LSA Anaconda (LSAA), contracted by US ARMY.
My responsibilities included construction manager, QA/QC, safety manager and security manager.

Company industry:
Construction & Building
Job role:
Engineering

Project Manager

January 2004 - January 2005

MELEC BAGHDAD - IRAQ BRANCH

Baghdad, Iraq

January 2004 - January 2005

Responsible for managing the installation of 2 new 11 kV electrical
infrastructures, one being located at Kirkuk Regional Air Base (KRAB),
contracted by Fluor Intercontinental, Inc. and the other at Camp
Falcon, at Baghdad, and contracted by SEI Engineering, Inc. The
installation of the infrastructure at KRAB included the installation of over 68 kilometers of direct burial cable and the installation of 37 new substations, and installation a 16 megawatt containerized power plant. My responsibilities included construction manager, QA/QC, safety manager and security manager. As for Camp Falcon, my team installed 35 kilometers of direct burial cable and the installation of 19 new substations and installed a 7 megawatt containerized power plant. My personal responsibilities were the same as mentioned above at KRAB

Company industry:
Construction & Building
Job role:
Engineering

Project Manager

January 2001 - January 2004

ZEROCK CONSTRACTION NIGERIA LIMITED

Nigeria

January 2001 - January 2004

Manager Electrical Division and entrusted with the responsibilities for installation of 2 to 5 megawatt Captive Power Stations, installation of Synchronized Power
distribution system. Underground Power Cables, etc

Company industry:
Civil Engineering
Job role:
Engineering

Project Engineer

January 1999 - January 2001

CIMENTERIE NATIONALE S.A.L

Tripoli, Lebanon

January 1999 - January 2001

Responsible for installation a 14 MW Power Plant (two sets each one 7 MW), installation of Synchronized distribution system between the Government Power plant (Kadisha) and the Cement Plant (Chekka)
CMMS (Computerized Maintenance Management System) planner in maintenance Department
Responsible for electrical equipment database creation and updating,
planner for preventive maintenance jobs, predictive maintenance
inspector, fault/troubleshooting analyst.

Company industry:
Industrial Production
Job role:
Engineering

Site Manager

January 1997 - January 1999

ZAKHEM ENGINEERS INT. S.A.L

Tripoli, Lebanon

January 1997 - January 1999

Responsible for managing the installation of new Medium Tension Cable
24 kV electrical infrastructures, located at Tripoli and Al-Mina Gardens
infrastructures Phase I. My team installed 22 kilometers of direct burial cable and the installation of 19 new substations, also Low Tension Cable 0.4KV, Street
Lighting Poles with Luminaries about 750 units, Sewage Pump Station including
Diesel Power Station.

Company industry:
Civil Engineering
Job role:
Engineering

Site Manager

January 1995 - January 1997

IHAB ESTABLISHMENT FOR CONTRACTING

Jeddah, Saudi Arabia

January 1995 - January 1997

Supervisor for Al-Buhairat City Project- Jeddah,
Comprising about 1000 Beach resort villas and Palaces
Responsible for the installation of Medium Tension Cable
15 kV electrical infrastructures, located at Al-Buhairat City, Jeddah. My team installed 275 kilometers of direct burial cable and the installation of 127 new substations, also Low Tension Cable 0.4KV, Street Lighting Poles with Luminaries about 3750 units, also design and wiring the internal electricity for all 1000 Beach resort villas and Palaces

Company industry:
General Engineering Consultancy
Job role:
Engineering

Site Manager

January 1991 - January 1995

NIGERIA NATIONAL PETROLIUM CORPORATION

January 1991 - January 1995

1991-1995 Company NIGERIA NATIONAL PETROLIUM CORPORATION.
Pipeline and Depots Project-Phase III
Suleja, N/State Tel: 234-9-500609

Position Site Manager
Supervisor of erection of Pipelines for multi-petroleum products
transportation, petroleum product depots and terminals extension
including tankage erection, pump stations, distribution loading/
unloading facilities, 4MW power plant generators, and 23Km overhead line

Job role:
Engineering

Education

Polytechnic Institute of Donetsk Ukraine

January 1991

January 1991

Master's degree, Electrical Engineering

Ukraine

GPA (point): 5 out of 5

GPA (point): 5 out of 5

1986-1991 Master of Science in electrical Engineering, Power Station specialization, Polytechnic Institute of Donetsk Ukraine

Skills

GENERATORS
Expert
GENERATORS
Expert
OVERHEAD LINE
Expert
OVERHEAD LINE
Expert
PETROLEUM
Expert
PETROLEUM
Expert
PUMP STATIONS
Expert
PUMP STATIONS
Expert
SECURITY
Expert
SECURITY
Expert
PROJECT MANAGER
Expert
PROJECT MANAGER
Expert
FIBER OPTIC
Intermediate
FIBER OPTIC
Intermediate
SUBSTATIONS
Expert
SUBSTATIONS
Expert
QA
Expert
QA
Expert

Languages

Arabic
Expert
English
Expert
French
Expert
Russian
Expert

Memberships

OEA

Member

March 1995