Sr Planning Engineer à ERGA Qatar
  • Qatar - Doha
  • Je travaille ici depuis novembre 2021
Sr. Planning Engineer à Construction Development Company
  • Qatar - Doha
  • février 2019 à novembre 2021

Project: 5 Star Hotel Apartment and Residences
Client: Al Fardan Properties

Planning Engineer à QDVC
  • Qatar - Doha
  • février 2017 à février 2019

Role: Planning Engineer
Project: Lusail Light Railway Transit System Project (LRT)
Client: Qatar Rail Corporation (QRC)

Responsibilities:
• Responsible in the Preparation of Tunnel Ventilation System Programme Schedule
• Prepared the Weekly Report, Monthly Report and Progress Presentation
• Review Sub-Contractors Baseline Programme
• Review, Evaluate and Validate Sub-Contractors Programme Update
• Import the Subcontractor Programme update to the Overall Master Programme
• Analyze the Programme schedule and report to the Planning Manager for possible delay
• Assist in establishing effective Project Management and Control System

February 2017 to July 2017
Contract Solution / QDVC
Role: Senior Planning Engineer
Project: Lusail Underground Car Park & CP01 C1, C2, C3, Transfer Package (Lusail City)
Client: Lusail Real Estate Development Company

Responsibilities:
• Responsible in preparing Weekly Report, Monthly Report and Progress Presentation
• Responsible for the preparation Revised Baseline Programme including Manpower, Equipment Histogram, S-Curve, Key Materials Quantities Histogram and Productivity Rates.
• Weekly Update of the Programme using Primavera P6
• Perform Delay Analysis and discuss with the Project Manager about entitlement to Claim for Extension of Time

Planning Engineering à Construction Development Company (CDC)
  • Qatar - Doha
  • mars 2016 à décembre 2016

Responsibilities:
• Preparation of Detailed Time Programme (Baseline)
• Preparation of Accelerated Programme
• Preparation of Daily, Weekly and Monthly Report
• Weekly update of the Programme on Primavera P6
• Preparation of Deliverable Matrix
• Preparation of Progress Photographs
• Perform Delay Analysis and discuss with the Contract Administrator about entitlement to Claim for Extension of Time
• Analyze the impact of variations with respect to time, investigate and prepare delay event chronologies.

Planning Engineer à Hyundai Engineering and Construction
  • Qatar - Doha
  • juin 2014 à janvier 2016

Project: New Port Project/ QEZ3 Canal Excavation, Quay Walls, and Channel Dredging
Project Cost: 1, 095, 992, 786 QAR
Project Packages:
• Dry Excavation = 12, 638, 902 m3
• Dredging = 870, 000 m3
• Reclamation = 9, 023, 670 m2
• Quay Wall Blocks = 9, 985 Nos.
• Breakwater, Revetment, & Flood Bund = 3, 797m3
• Access Road = 45 lm

Responsibilities:
• Preparation of Detailed Time Programme (Baseline)
• Preparation of Mitigation Plan
• Preparation of Daily, Weekly and Monthly Report
• Weekly update of the Programme on Primavera P6
• Preparation of Deliverable Matrix
• Preparation of Progress Photographs

Planning Engineer à TECHNICAL SERVICES
  • Qatar - Doha
  • mai 2011 à mai 2014

Project: 10, 000 CMD Waste Water Treatment Plant (PTPs) @ Various Location
Project Cost: 294, 000, 000 QAR

Responsibilities:

• Preparation of Daily Report, Weekly Report and Monthly Report.
• Weekly update of the programme against the baseline schedule.
• Monitor the Procurement, Submittal and Drawing Logs.
• Collect chronological documents (correspondence, Meeting Minutes, RFI, Site Instructions) for EOT claims
• Assign to lead the documentation and guide the Document Controller using latest version of Primavera Contract Management (Expedition) as Contract Document Management software to track Correspondences, Drawings, Submittals, Material & Equipment Procurement, Daily Reports, Transmittals, Minutes of Meetings, Bill of Quantities, Proposals, Requests for Inspection, Requests for Clarification, Change Orders, Invoices, Payment Requisitions and Snag Lists and linking the Project information in Primavera Contract Management to the Primavera Enterprise Schedule.

Civil Engineer à PROTEC Technical Services
  • Qatar - Doha
  • novembre 2009 à avril 2011

Responsibilities:
• Review the design drawings prepared by the consultants.
• Evaluate the materials being used if it is in accordance with the specifications from the clients.
• Check and review the Structural Analysis Report from the design consultants if the model and design results coincide with the structural drawings.
• Lead and give instruction to the CAD Draftsman in preparing for shop drawings and drawings that needs revision.
• Provide assistant in preparing of Isometric Drawings, Piping Spools and Bill of Quantities for pipe and fittings being used in the project.
• Produced BIM 3D Model of the whole plant using Autodesk Revit Software.
• Created a 4D Simulation of the Project by using Autodesk Navisworks software

Draftsman / Site Engineer à Department of Public Works and Highways
  • Philippines
  • mars 2001 à novembre 2009

Responsibilities:
• Prepares cost estimates and cost analysis
• Prepares Work Schedule, PERT/CPM, Cash Flow and S-Curve
• Supervised and maintain government projects
• Prepare construction drawings.

Éducation

Baccalauréat, Civil Engineering
  • à University of the Visayas
  • mars 2006

Bachelors of Science

Diplôme, Drafting Technology
  • à Cebu Technological University (former CSCST-CIT)
  • mars 2001

Associate in Industrial Technology Course

Specialties & Skills

AutoCAD
MS Project
Primavera P6
AUTO CAD
Autodesk Revit
AutoCAD Structural Detailing
Autodesk Navisworks
Autodesk Robot Structural Analysis
STAAD Pro
STAAD Foundation
PRIMAVERA P6 Project Planner
Primavera Contract Management (PCM)
MS Project
MS Office (Word, Excel, Powerpoint, Outlook)

Langues

Anglais
Expert

Formation et Diplômes

4th On-The-Job Training on Bridge Maintenance and Quality Contro; (Formation)
Institut de formation:
DPWH-JICA
Date de la formation:
November 2009
Durée:
40 heures
Computer - Aided Structural Analysis using STAAD Pro (Formation)
Institut de formation:
CAD International Training Instiitute
Date de la formation:
July 2012
Durée:
36 heures
General Draftsman I (3rd Class) (Certificat)
Date de la formation:
February 2006
Valide jusqu'à:
February 2009
AutoCAD 2007 Module 1 & 2 (Formation)
Institut de formation:
Informatics
Date de la formation:
May 2008
Durée:
36 heures
Primavera Project Management (P6) (Formation)
Institut de formation:
Madras Management Training Institute
Date de la formation:
November 2010
Durée:
30 heures
Primavera Contract Management Rel. 13 (PCM) (Formation)
Institut de formation:
Oracle University
Date de la formation:
April 2011
Durée:
30 heures

Loisirs