Electrical Inspector at Saudi Arabian Parsons
  • Saudi Arabia - Riyadh
  • My current job since May 2015

Overall responsible for site installation inspection, Testing & Commissioning.
Attend the site meeting with the contractor for day-to-day activities.
Review shop drawing in line with approved design drawing & project specification.
Preparation of manpower log & activity tracker.
Preparation of progress report.
Review the construction work package & inspection test plan (ITP) for submitting to RE for final review and further processing
To ensure and adhere to the quality of work and safety measurements at the site.
Raising quality observation for defective installation to the contractor and maintaining the quality log. Also, a follow-up to the contractor for close-out.
Monitoring the installation activity and raising the non-conformance to the contractor for rectification.
Unsafe & near miss observation to be escalated to the contractor for corrective action and maintaining the safety observation log.
To ensure electrical safe work permit systems is in place and monitoring for zero accidents, zero near-miss at site
To ensure and adhere to the quality of work and safety measurements at the site.

Electrical Supervisor at Pak arab Fertilizers Multan
  • Pakistan - Multan
  • August 2006 to May 2015

Verify the redness of the work location & material requirement for completion of turnaround task in the scheduled timeframe.
Main role played for all major breakdown
Monitor the installation work in line with the quality plan and project Specification.
Installation and commissioning PLC-based motors (Ready to start, Running, Tripping) Annunciation system.
Supervision for cable laying, termination, jointing from MCCs, Substation, and Motors.
Testing, commissioning, and control circuits of all cubicles Motor’s Starters and Transformers Breakers.
All Electrical Schedule Corrective and Preventive Maintenance at Ammonia, CO2, Nitric Acid, Co-generation, and NP Plants.
Turn Around Supervision activities all MV, LV Motors, Substations, and MCCS.
Inspect electrical systems, equipment, and components to identify hazards, defects, and the need for adjustment, repair, or replacement.

Sr.Electrical Technician at Jal Internation Limited
  • Saudi Arabia - Jubail
  • April 2004 to April 2006

SAMREF: Saudi Aramco Mobil Refinery Company, Low Sulphur ADO Projects- From December 2005 to April 2006.
Gulf Stabilizers Catalyst Extension projects - From July 2005 to December 2005
SABIC: Jubail united petrochemical Company Projects - From April 2004 to July 2005.

Installation, commissioning, and testing of Simplex PLC System for Sulphur Recovery Unit.
Extension of Oil Pump Station motors and control termination.
Installation, commissioning, and termination of MOVS (motor-operated valve) in field pipelines through remote Control Operation in the control room.
Installation, commissioning and testing of Heat Tracing Media of Ammonia pipelines.
Worked in SABIC (JUPC) Supports services in central workshop Jubail.
Installation, commissioning, and testing of Maintenance Machinery (lath Machines Radial drilling machines, Power cutters, welding sets, etc.) in central workshop JUPC project.
Maintenance of LV motors and lightings.

Electrical Technician at Ibrahim Group (Plyester plant)
  • Pakistan - Faisalabad
  • April 2002 to April 2004

Installation, commissioning of Motors Control Centre and HT, LT Substation.
Maintenance of LT, HT control panels.
Installation and commissioning of plant lights and wiring Circuits.
Cables lying and termination Project of Draw line and Spinning Section.
Installation, commissioning, and termination of power and control 3MW to 5 MW transformers.
Maintenance of 1.5 KW to 630 KW VFDs, Battery Banks, and MCCs.

Electrician Electrical at Dynasty Textiles and Dying (Pvt.) Ltd
  • Pakistan - Lahore
  • December 1994 to October 2001

Initial Factory Textiles (Knitting, Stitching, Dyeing) Machines Installation Commissioning activities.
Start-up Phases.
Trouble Shooting and Maintenance activities.
Lighting installation and control wiring through Lighting DBs’.
Installation, commissioning steam pressure (100Psi) Boiler Project.

Electrician Electrical at Iram Textiles Ltd
  • Pakistan - Lahore
  • May 1993 to November 1994

Installed, repaired, and Maintained motors, transformer, Generator, lights, appliances, circuits, wiring, other electrical system equipment, and components.
Troubleshooting of Garments Machines (Tumbler Winch, Soft Flow, Knitting, Dryer, Embroidery) Control and Power Circuits

Education

Bachelor's degree, Electrical Technology
  • at Preston University
  • March 2011
Diploma, D.A.E (3years) Electronics Technology
  • at Government College of Technology Multan
  • December 1993
High school or equivalent, Science Group
  • at Government High School Kot Addu
  • July 1988

Specialties & Skills

Troubleshooting
Project Planning
Microsoft Excel
Plant Commissioning
Electrical Maintenance
Microsoft Word
Microsoft Excel
Commissioning
Inspection
Trouble Shooting
Engineering
Electrical Supervision
Microsoft Office

Languages

English
Expert
Urdu
Expert

Training and Certifications

Hamaari Taqat (Certificate)
Date Attended:
July 2007
Valid Until:
July 2007