Planning Engineer
NBTC Group
Total years of experience :12 years, 11 Months
Hydrogen reformer 4 Trains
Planning and co-ordination of the complete project and maintenance as per the schedule.
Coordinating with contractors at site for timely installation of project, Identifying new areas, planning activities & document preparation for Troubleshooting /modification of old system.
Well aware about PM and MM module.
Apply specialized ability to the planning and scheduling of shutdowns
Provide an overall plan for the supervisor on which to base his/her pre-thinking and pre-planning for day-to-day work and future work.
Provide the cooperation necessary in connection with each job to do work as prescribed by operations
Review the technical documents form vendor/subcontractors
Bill checking of contractors and bill preparation of erection job to the client as per the erection activity.
Prepare project baseline schedule and detailed plan in Primavera.
Review of construction schedule, materials, drawings, variation order, progress billing and accomplishment.
Preparation of monthly progress reports, look-ahead programs, bar charts, S-curve.
Preparing Cost curve based on Cash flow (Cost control).
Allocation of Manpower for getting optimal result (Resource leveling).
Preparing Contract Performance Chart of the project.
Managed design of EBS and OBS for P6.
Designing of WBS and assigning of activity codes for activities.
Preparation of daily and weekly status reports.
Preparing & presenting project status reports for weekly internal review meeting.
Prepare and update project schedule based on the contract.
Set work program and target milestones for each phase based on the project plan.
Monitor critical activities based on the project schedule and advise project management.
Maintain and record update of site work progress obtained from Project Manager.
Report to the Project Manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work.
Planning and co-ordination of the complete project and maintenance as per the schedule.
Coordinating with contractors at site for timely installation of project, Identifying new areas, planning activities & document preparation for Troubleshooting /modification of old system.
Well aware about PM and MM module.
Apply specialized ability to the planning and scheduling of shutdowns
Provide an overall plan for the supervisor on which to base his/her pre-thinking and pre-planning for day-to-day work and future work.
Provide the cooperation necessary in connection with each job to do work as prescribed by operations
Review the technical documents form vendor/subcontractors
Bill checking of contractors and bill preparation of erection job to the client as per the erection activity.
Prepare project baseline schedule and detailed plan in Primavera.
Review of construction schedule, materials, drawings, variation order, progress billing and accomplishment.
Preparation of monthly progress reports, look-ahead programs, bar charts, S-curve.
Preparing Cost curve based on Cash flow (Cost control).
Allocation of Manpower for getting optimal result (Resource leveling).
Preparing Contract Performance Chart of the project.
Managed design of EBS and OBS for P6.
Designing of WBS and assigning of activity codes for activities.
Preparation of daily and weekly status reports.
Preparing & presenting project status reports for weekly internal review meeting.
Prepare and update project schedule based on the contract.
Set work program and target milestones for each phase based on the project plan.
Monitor critical activities based on the project schedule and advise project management.
Planning and co-ordination of the complete project and maintenance as per the schedule.
Coordinating with contractors at site for timely installation of project, Identifying new areas, planning activities & document preparation for Troubleshooting /modification of old system.
Well aware about PM and MM module.
Apply specialized ability to the planning and scheduling of shutdowns
Provide an overall plan for the supervisor on which to base his/her pre-thinking and pre-planning for day-to-day work and future work.
Provide the cooperation necessary in connection with each job to do work as prescribed by operations
Review the technical documents form vendor/subcontractors
Bill checking of contractors and bill preparation of erection job to the client as per the erection activity.
Prepare project baseline schedule and detailed plan in Primavera.
Review of construction schedule, materials, drawings, variation order, progress billing and accomplishment.
Preparation of monthly progress reports, look-ahead programs, bar charts, S-curve.
Preparing Cost curve based on Cash flow (Cost control).
Allocation of Manpower for getting optimal result (Resource leveling).
Preparing Contract Performance Chart of the project.
Managed design of EBS and OBS for P6.
Designing of WBS and assigning of activity codes for activities.
Preparation of daily and weekly status reports.
Preparing & presenting project status reports for weekly internal review meeting.
Prepare and update project schedule based on the contract.
Set work program and target milestones for each phase based on the project plan.
Monitor critical activities based on the project schedule and advise project management.
Provide the cooperation necessary in connection with each job to do work as prescribed by operations
Review the technical documents form vendor/subcontractors
Bill checking of contractors and bill preparation of erection job to the client as per the erection activity.
Prepare project baseline schedule and detailed plan in Primavera.
Review of construction schedule, materials, drawings, variation order, progress billing and accomplishment.
Preparation of monthly progress reports, look-ahead programs, bar charts, S-curve.
Preparing Cost curve based on Cash flow (Cost control).
Allocation of Manpower for getting optimal result (Resource leveling).
Preparing Contract Performance Chart of the project.
Managed design of EBS and OBS for P6.
Designing of WBS and assigning of activity codes for activities.
Preparation of daily and weekly status reports.
Preparing & presenting project status reports for weekly internal review meeting.
Prepare and update project schedule based on the contract.
Set work program and target milestones for each phase based on the project plan.
Monitor critical activities based on the project schedule and advise project management.
Maintain and record update of site work progress obtained from Project Manager.
Report to the Project Manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work.
Well aware in sequence of Unloading hopper, Dilution skid, Maturation tank, Xylo tank, Booster pump, Compressor area etc
Participate in project meetings and discussions with the Client as required.
Assists in preparing work program, cash flow and manpower histogram for tenders.
Preparation of various types of MIS reports for Top Management
Having good knowledge of ASME B31.1 & B31.3
Review of daily progress and attending weekly, monthly meetings with clients.
Documentation according to ISO-9001/2008 norms.
Apply specialized ability to the planning and scheduling of shutdowns
Provide an overall plan for the supervisor on which to base his/her pre-thinking and pre-planning for day-to-day work and future work.
Provide the cooperation necessary in connection with each job to do work as prescribed by operations
Review the technical documents form vendor/subcontractors
Bill checking of contractors and bill preparation of erection job to the client as per the erection activity.
Prepare project baseline schedule and detailed plan in Primavera.
Review of construction schedule, materials, drawings, variation order, progress billing and accomplishment.
Preparation of monthly progress reports, look-ahead programs, bar charts, S-curve.
Preparing Cost curve based on Cash flow (Cost control).
Allocation of Manpower for getting optimal result (Resource leveling).
Preparing Contract Performance Chart of the project.
Managed design of EBS and OBS for P6.
Designing of WBS and assigning of activity codes for activities.
Preparation of daily and weekly status reports.
Preparing & presenting project status reports for weekly internal review meeting.
Prepare and update project schedule based on the contract.
Set work program and target milestones for each phase based on the project plan.
Monitor critical activities based on the project schedule and advise project management.
Maintain and record update of site work progress obtained from Project Manager.
Report to the Project Manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work.
Well aware in sequence of Unloading hopper, Dilution skid, Maturation tank, Xylo tank, Booster pump, Compressor area etc
Coordinating with contractors at site for timely installation of project, Identifying new areas, planning activities & document preparation for Troubleshooting /modification of old system.
Bill checking of contractors and bill preparation of erection job to the client as per the erection activity.
Predetermine and arrange for required shop work
Apply specialized ability to the planning and scheduling of shutdowns
Provide an overall plan for the supervisor on which to base his/her pre-thinking and pre-planning for day-to-day work and future work.
Provide the cooperation necessary in connection with each job to do work as prescribed by operations
Review the technical documents form vendor/subcontractors
Managing all subcontracting works (contracts, progress monitoring and control)
Prepare project baseline schedule and detailed plan in Primavera.
Review of construction schedule, materials, drawings, variation order, progress billing and accomplishment.
Preparation of monthly progress reports, look-ahead programs, bar charts, S-curve.
Preparing Cost curve based on Cash flow (Cost control).
Allocation of Manpower for getting optimal result (Resource leveling).
Preparing Contract Performance Chart of the project.
Managed design of EBS and OBS for P6.
Designing of WBS and assigning of activity codes for activities.
Managing migration from P3 to P6 (Primavera Project Enterprise).
Preparation of daily and weekly status reports.
Review the technical documents form vendor/subcontractors
Prepare project baseline schedule and detailed plan in Primavera.
Review of construction schedule, materials, drawings, variation order, progress billing and accomplishment.
Preparation of monthly progress reports, look-ahead programs, bar charts, S-curve.
Preparing Cost curve based on Cash flow (Cost control).
Allocation of Manpower for getting optimal result (Resource leveling).
Preparing Contract Performance Chart of the project.
Managed design of EBS and OBS for P6.
Designing of WBS and assigning of activity codes for activities.
Managing migration from P3 to P6 (Primavera Project Enterprise).
Preparation of daily and weekly status reports.
Preparing & presenting project status reports for weekly internal review meeting.
Prepare and update project schedule based on the contract.
Set work program and target milestones for each phase based on the project plan.
Monitor critical activities based on the project schedule and advise project management.
Monitor day to day work progress and prepare the weekly and monthly program and report.
Maintain and record update of site work progress obtained from Project Manager.
Prepares monthly report reflecting work progress summary.
Monitor critical activities based on the project schedule and advise project management.
? Monitor day to day work progress and prepare the weekly and monthly program and report.
? Maintain and record update of site work progress obtained from Project Manager.
? Prepares monthly report reflecting work progress summary.
? Report to the Project Manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work.
? Participate in project meetings and discussions with the Client as required.
? Assists in preparing work program, cash flow and manpower histogram for tenders.
? Performs other duties and responsibilities as may be assigned from time to time.
? Preparation of Commissioning Protocols, punch list for smooth operation of plant.
? Having good knowledge of ASME B31.1 & B31.3
? Review of daily progress and attending weekly, monthly meetings with clients.
? Documentation according to ISO-9001/2008 norms.
? Scheduling: Development of Base Line Schedule using Planning Software PRIMAVERA (P3).
? Preparation of Weekly; Monthly & Three Months look-ahead Schedule. Updating actual Progress and all related information & comparison analysis.
? Responsible for all types of piping works of different materials like SS, DSS, CS, GI etc
? Well knowledge about ASME section B31.3
? Responsible for all hydro and pneumatic tests of all lines.
? Preparation of Commissioning Protocols, punch list for smooth operation of plant.
? Coordinating with contractors at site for timely installation of project, Identifying new areas, planning activities & document preparation for Troubleshooting /modification of old system.
? Bill checking of contractors and bill preparation of erection job to the client as per the erection activity.
? Review of daily progress and attending weekly, monthly meetings with clients.
? Documentation according to ISO-9001/2008 norms.
? Expert in minimization of scrap materials.
Planning and co-ordination of the complete project as per the project schedule.
? Coordinating with contractors at site for timely installation of project, Identifying new areas, planning activities & document preparation for Troubleshooting /modification of old system.
? Bill checking of contractors and bill preparation of erection job to the client as per the erection activity.
? Preparation of Commissioning Protocols, punch list for smooth operation of plant.
? Having good knowledge of ASME B31.1 & B31.3
? Review of daily progress and attending weekly, monthly meetings with clients.
? Documentation according to ISO-9001/2008 norms.
? Responsible for all types of piping activities of different materials like ASTM A106 GrB, ASTM A312TP 304/304L/308/308L/316/316L/347, ASTM A815
? Worked in all Power piping works (Like MS, HRH, CRH, BFD, PRDS lines etc).
? Studying of applicable Project Drawings, specifications (P&ID, ISOMETRIC, STRUCTURAL, AND EQUIPMENT DRAWINGS).
? Knowledge of slings and calculation of capacity of slings.
? Good knowledge of torquing and torque wrench.
? Having a Good knowledge of erection of H-frame for pipe rack, pipes and erection of vessels till 300 ton and 80m height under safety.
? Having in depth knowledge of pipe supports (Guide, pad, anchor etc) and its structure.
? Expert in minimization of scrap materials.
? Worked under MPT and well pad also.
? Knowledge of movement of crane and hydra for erection purposes.
? Responsible for all hydro and pneumatic tests of all lines.
Responsible for all piping works (Like MS line, HRH line, CRH line, BFD line etc).
Studying of applicable Project Drawings, specifications (P&ID, ISOMETRIC DRAWINGS, and STRECTURAL DRAWINGS AND EQUIPMENT DRAWINGS).
Responsible for all types of piping activities of different materials like ASTM A106 GrB, ASTM A312TP /308/308L/347, ASTM A335 P11/P22/P91, ASTM A213 T11/T22,
Having good knowledge of ASME B31.1
Planning and co-ordination of the complete project as per the project schedule.
Knowledge of movement of crane and hydra for erection purposes.
Knowledge of slings and calculation of capacity of slings.
A Good knowledge of torquing and torque wrench.
Having a Good knowledge of erection of H-frame for pipe rack, pipes and erection of vessels till 300 ton and 80m height under safety.
A Good knowledge of pipe code & standard.
Having in depth knowledge of pipe supports (Guide, pad, anchor etc) and its structure.
Having safe & good experience of work at height and scaffolding & all PPE’s.
Having a very good knowledge of visual defects, NDT and Hydro Test.
Review of daily progress and attending weekly, monthly meetings with clients.
Documentation according to ISO-9001/2008 norms.
Expert in minimization of scrap materials.
Preparation of Commissioning Protocols, punch list for smooth operation of plant.
Coordinating with contractors at site for timely installation of project, Identifying new areas, planning activities & document preparation for Troubleshooting /modification of old system.
Bill checking of contractors and bill preparation of erection job to the client as per the erection activity.
Key Responsibilities
Executing the maintenance of the machines & maintaining log book for the same.
Responsible for achieving monthly erection targets
Analyzing the progress on daily basis & reporting the same to the top management. Interacting with the clients.
Achievements
Completed successfully Drainable Hydro Test, Non-Drainable Hydro Test, EDTA, Light up, Steam Blowing & Synchronization.
URL removed due to policy violation. Please contact support for further information.