GUNVANT PATIL, Technical Writer

GUNVANT PATIL

Technical Writer

SNC LAVALIN

Location
India - Navi Mumbai
Education
Bachelor's degree, Chemistry
Experience
4 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :4 years, 7 Months

Technical Writer at SNC LAVALIN
  • Kuwait - Al Kuwait
  • My current job since July 2020

Work with SNC LAVALIN as a Technical Writer
Preparing SOP for various Equipments Operation (Pre-Commissioning, Commissioning, Start Up, Shut Down, Handover for Maintenance)

Work as a commissioning Supervisor in Tecnimont at their Petrochemicals Project
(SOCAR) for their (Polypropylene and Polyethylene Plants at Sumgait, near Baku, Azerbaijan).
The Activities are as below.
Prepared commissioning, Start Up procedures, activity reviews. Writing and Reviewing
Standard Operating Procedures for Poly Propylene Plant (Catalyst Preparation, Reaction) .
To handle the manpower for Lines flushing, Blowing, Punching (Find out and clear the Punches), Loop checking, Functional Test, Through Checking of Plant as system wise. Pressure hold test of Lines & equipment’s. Start various rotating equipment’s. Startup of Propylene Pumps for Reactor, various distillation columns. Start various utilities such as Cooling water and its dosing like Biocide, Corrosion inhibitor, Scale inhibitor, Raw Water, Air Compressors (for Plant & Instrument Air), Condensate Treatment Package (Steam Condensate processing back to Dm Water). TEAL handling.
PGTR etc.

Commissioning Supervisor at Socar Polymer Azerbaijan's
  • Azerbaijan
  • March 2018 to October 2018

Work with a commissioning Supervisor in Tecnimont at their Petrochemicals Project
(SOCAR) for their (Polypropylene and Polyethylene Plants at Sumgait, near Baku, Azerbaijan).
The Activities are as below.
Prepared commissioning, Start Up procedures, activity reviews. Writing and Reviewing
Standard Operating Procedures for Poly Propylene Plant (Catalyst Preparation, Reaction) .
To handle the manpower for Lines flushing, Blowing, Punching (Find out and clear the Punches), Loop checking, Functional Test, Through Checking of Plant as system wise. Pressure hold test of Lines & equipment’s. Start various rotating equipment’s. Startup of Propylene Pumps for Reactor, various distillation columns. Start various utilities such as Cooling water and its dosing like Biocide, Corrosion inhibitor, Scale inhibitor, Raw Water, Air Compressors (for Plant & Instrument Air), Condensate Treatment Package (Steam Condensate processing back to Dm Water). TEAL handling.
PGTR etc.

Education

Bachelor's degree, Chemistry
  • at Univesity of Pune
  • April 1986
Bachelor's degree, Chemistry
  • at Pune University
  • April 1986

Technical Experience 1) Plant Process Operator (Gas Processing Plants MEG TEG Dehydration) Oil & Gas June 2012 to till DT 2) Senior Plant Operator (MEG)PetroRabigh (18 April-10 Jan 12 3) Field/ Panel Operator (MEG) YANSAB (07-Jan 2010) 4) Field/Panel Operator/ EO/EG Plant India (89-2007) Employment History 1. From 19th June 2012 2) GG 2 Platform (Gas Gathering Plant), capacity of 285 mmscfd (MEG Dehydration), using a propane refrigerant. It is a self-sufficient, stand-alone process platform containing all the necessary support processes and utilities. 2) GPF Platform- TEG based Dehydration of 440 MMSCFD (220 each Train) associated gas Position -Plant Process Operator Working as DCS Operator Bailey infi-90 DETAIL OF latest JOB EXPERIENCE: ( Backwards) PLANT DETAILS. 1) Gas Gathering Platform CAPACITY : GAS - 400 MMSCFD AND CONDENSATE 100 MBPD. GAS COMPRESSION: 400 MMSCFD/6000PSI:Three Centrifugal Main Gas Compressors in parallel operation - Two stages - Each one having capacity of 105 mmscfd – Dresser Rand made and driven by ROLLS ROYCE Avon Gas Generators & Power Turbine. Surge Control system - BAILY INFI-90 DCS system - CCC Control system BENTLY NEVADA USA Monitoring system. GAS COMPRESSION: 400 MSCFD/6000PSI: Three Centrifugal Main Gas Compressors in parallel operation - Two stages - Each one having capacity of 105 mmscfd – Dresser Rand made and driven by ROLLS ROYCE Avon Gas Generators & Power Turbine. Surge Control system - BAILY INFI-90 DCS system - CCC Control system BENTLY NEVADA USA Monitoring system. • Exposures to various fire and gas detectors, fusible loop system, deluge system.• Startup and shutdown of the three main centrifugal gas compressors(ELLIOT Make) driven by Rolls Royce gas turbine engine with the capacity of 110 MMSCFD with the Dehydration( MEG ) and chilling by propane as refrigerant. • Startup and shutdown of the two power generators capacity of 12.8MW each one.• Startup and shutdown of the 3 motor driven (6.6KV/2700KW) propane compressors (DELAVAL STORK). • Actively taken part in the major shut down and starts up activities. • Thorough knowledge of DCS operation through Bailey infi-90., and also having thorough knowledge of fire and gas operation through SILVERTECH -GE FANUC-90-70. • PIG launching and PIG receiving.• Thorough knowledge of all plant safety equipment. 3) GPF Platform- TEG based Dehydration of 440 MMSCFD 220 each Train) associated gas by following equipments. Absorbers, associated filter coalescers, Gas / TEG Heat Exchangers, Two Stage Centrifugal Compressor (Dresser Rand ) with variable speed Turbine (RB 211) Education Bachelor of Science ( Chemistry.) ADIS (Advance Diploma in Industrial Safety)

Specialties & Skills

Production
Gathering
Refrigeration
MS Excel,Power Pt.,MS Word,DCS YOKOGAWA 3000,Baily etc

Languages

English
Expert

Hobbies

  • Swimming,Chess playing
    Recently I was working with Oil & Gas ,Abu Dhabi, UAE. My career Started with IPCl ( Indian Petrochemicals Corporation Ltd. After that I work with Sabic (Yansab), PetroRabigh in KSA. I also studied ADIS ( Advance Diploma in Industrial Safety. I have made very well Power Point Presentation in Safety related issues.